Wateranga Project Initial Advice Statement<br />

Queensl<strong>and</strong> Industrial Minerals Ltd<br />

Appendices<br />

Appendix 1 QIM Business information<br />

Appendix 2 QGG - Native Title acquisition<br />

Appendix 3 DEH Decision (EPBC Act)<br />

Appendix 4 Leachate results<br />

Appendix 5 Draft QIM <strong>Environment</strong>al Training overview<br />

Figures<br />

Figure 1 General Project Location<br />

Figure 2 Proposed Mining Lease Application Overlaid on Aerial Photo<br />

Figure 3 Project Location <strong>and</strong> Major Townships<br />

Figure 4 EPM 13278<br />

Figure 5 Proposed Mining Lease Boundary<br />

Figure 6 Background L<strong>and</strong> Tenures – Central MLA<br />

Figure 7a Ore Extraction – Schematic Diagram<br />

Figure 7b General <strong>Environment</strong>al Management – Schematic Diagram<br />

Figure 8 Stage 1 Mining Model Overlaid on Aerial Photo<br />

Figure 9a Stage 2 Mining Model <strong>and</strong> Plant Site Layout – Post-inundation<br />

Figure 9b Stage 2 Mining Model Overlaid on Aerial Photo – Post-inundation <strong>and</strong><br />

Plant Site Layout – Pre-inundation<br />

Figure 10 Detailed Stage 1 plant site layout – Central MLA<br />

Figure 11 Processing Flow Chart<br />

Figure 12 Main Transport Route (possible options)<br />

Tables<br />

Table 1 QIM Business Details<br />

Table 2 Proposed MLA Details<br />

Table 3 Native Title Claims<br />

Table 4 Background L<strong>and</strong> Tenement Information – Wateranga Project<br />

Table 5 General Mining Parameters Overview<br />

Table 6 Schedule <strong>of</strong> Disturbance <strong>and</strong> Rehabilitation<br />

Table 7 Stage 1 Mining Volumes <strong>and</strong> Disturbances<br />

Table 8 <strong>Environment</strong>al Considerations for the Wateranga Project<br />

Table 9 Assessment <strong>of</strong> Burnett Water EIS <strong>and</strong> its application to the Wateranga<br />

Project