Wateranga Project Initial Advice Statement<br />

Queensl<strong>and</strong> Industrial Minerals Ltd<br />

estimate by the Directors for the discounted Net Present Value <strong>of</strong> the Project is a<br />

conservative $85 million <strong>and</strong> this figure is expected to increase once a full financial<br />

<strong>and</strong> economic assessment is undertaken.<br />

Expected royalties to the Queensl<strong>and</strong> Government from the project once in<br />

production will be in the order <strong>of</strong> $8 million per annum <strong>and</strong> the estimated annual<br />

direct taxes paid to the Commonwealth Government are potentially $37 million.<br />

Significant indirect taxes are expected, resulting as a flow-on effect from the<br />

operation to downstream industries <strong>and</strong> wealth creation <strong>of</strong> local business <strong>and</strong> the<br />

community. Annual turnover is expected to be over $200 million with an approximate<br />

$100 million pr<strong>of</strong>it after tax. The project will ultimately <strong>of</strong>fer full time employment for<br />

100 people.<br />

Exploitation <strong>of</strong> the resources from the Wateranga Project will have a beneficial<br />

impact on the environment. The financial <strong>and</strong> technical resources available to QIM<br />

for this project means that appropriate environmental management methods can be<br />

implemented to maximise the productivity <strong>of</strong> this l<strong>and</strong>scape. Most notably, QIM will<br />

be able to implement significant dam bank management <strong>and</strong> stabilisation strategies<br />

post-resource exploitation, thereby providing erosion <strong>and</strong> sediment control mitigation<br />

measures for the dam. These measures will likely far exceed any others proposed<br />

for the catchment <strong>of</strong> the Burnett Dam. In addition, the l<strong>and</strong>scape is very disturbed<br />

<strong>and</strong> is currently utilised only for cattle grazing. It is proposed that upon completion <strong>of</strong><br />

mining, there will be an opportunity to introduce a number <strong>of</strong> complimentary<br />

industries to the area which are in-line with sustainability concepts. These industries<br />

potentially include, but are not limited to, vineyards, forests <strong>and</strong> orchards.<br />

Wateranga is a unique deposit. Its layered nature, widespread conformity, volume<br />

<strong>and</strong> quality <strong>of</strong> industrial <strong>and</strong> rare earth minerals indicate that it has world class<br />

characteristics, <strong>of</strong>fering competitive application in a broad range <strong>of</strong> industries.<br />

The Wateranga plagioclase feldspar is a unique mineral because <strong>of</strong> its extremely<br />

high alumina content. Amongst its extremely high abrasive characteristics, the high<br />

alumina content makes it very attractive to the glass <strong>and</strong> ceramic industry, as well as<br />

another potential application as feedstock in the alumina/aluminium industry. The<br />

Wateranga feldspar (30% Al2O3) has double the alumina content <strong>of</strong> anorthosite (15%<br />

Al2O3 which is typically used in the glass industry), <strong>and</strong> therefore its superior qualities<br />

may have a competitive application in this industry.<br />

Ilmenite is suitable for titanium dioxide pigment production, <strong>and</strong> the apatite is a direct<br />

source <strong>of</strong> phosphate for primary industry. Apatite is a natural, slow release<br />

phosphate fertilizer <strong>and</strong> with its advantageous “environmentally friendly” qualities, will<br />

substitute for super phosphate thus negating the potential (alleged) impact <strong>of</strong> super<br />

phosphate on the environment <strong>and</strong> more particularly, the Great Barrier Reef.<br />

The micas present (muscovite <strong>and</strong> phlogopite) have wide usage in the electrical<br />

industry. In addition, the Wateranga Project is thought to contain the largest known<br />

deposit <strong>of</strong> sc<strong>and</strong>ium in the world.<br />

Other minerals present in recoverable <strong>and</strong> economic proportions include zircon,<br />

corundum <strong>and</strong> apatite.<br />

The Project’s proximity to readily available water, power, rail line <strong>and</strong> infrastructure<br />

place it in an excellent position to competitively produce a variety <strong>of</strong> industrial mineral<br />

products, with economic benefits afforded to the local community <strong>and</strong> State <strong>of</strong><br />

Queensl<strong>and</strong>.<br />

6