Construction<br />
<strong>2011</strong> saw <strong>the</strong> completion and <strong>the</strong> start of several construction projects around<br />
Queensland all managed by C&K.<br />
C&K Oakleigh Community Kindergarten<br />
This new single unit kindergarten built on <strong>the</strong> Oakleigh Sate School site opened<br />
for term one <strong>2011</strong>. It was not without challenges however as due to <strong>the</strong> flooding<br />
rains, <strong>the</strong> playground area was not able to be completed for <strong>the</strong> start of term, <strong>the</strong><br />
children were very patient as <strong>the</strong>y watched and waited for <strong>the</strong> completion of <strong>the</strong>ir<br />
outdoor facility.<br />
C&K Carindale Community Kindergarten<br />
This project was for an additional third unit and playground at <strong>the</strong> existing site.<br />
Although <strong>the</strong> summer wea<strong>the</strong>r conditions presented challenges for both builders<br />
and community, <strong>the</strong> new unit opened for term two. The new unit and playground<br />
were <strong>full</strong>y operational by middle of <strong>2011</strong>.<br />
C&K The Gap Community Kindergarten<br />
A renovation and construction project converted <strong>the</strong> single unit into a new double<br />
unit for C&K The Gap Community Kindergarten. Construction comprised of a new<br />
kitchen, toilet facilities, internal renovations and stairs to <strong>the</strong> previously unused<br />
playground at <strong>the</strong> rear of <strong>the</strong> site. Until this project, <strong>the</strong> large playground area had<br />
been abandoned for many years. This service started operations in <strong>the</strong>ir new home<br />
term two <strong>2011</strong>, and <strong>the</strong>y had use of <strong>the</strong>ir new playground some weeks later.<br />
C&K Middlemount Community Childcare Centre<br />
The Middlemount project was an extension and renovation of <strong>the</strong> existing babies<br />
and toddler rooms to meet <strong>the</strong> increased needs for <strong>the</strong> local community and<br />
provide flexibility within <strong>the</strong> service. This project had significant challenges due<br />
to <strong>the</strong> remote location and <strong>the</strong> rooms remaining open during <strong>the</strong> construction<br />
process. The support from <strong>the</strong> staff and commitment from <strong>the</strong> builder to work at<br />
night and weekends meant disruption to <strong>the</strong> children and families was kept to a<br />
minimum. Construction work was completed October <strong>2011</strong>.<br />
C&K Blackwater Community Childcare Centre<br />
The scope of this project included <strong>the</strong> construction of a new two room babies<br />
building located in a unused area of <strong>the</strong> site and <strong>the</strong> complete renovation of all<br />
o<strong>the</strong>r rooms and areas in <strong>the</strong> service. The staff of <strong>the</strong> service provided support<br />
through <strong>the</strong> project and ensured disruptions for children and <strong>the</strong>ir families was<br />
kept to a minimum. The new babies building and renovations was completed and<br />
in use in late <strong>2011</strong>, ahead of schedule.<br />
C&K Clinton Community Childcare Centre<br />
This project featured a new five room childcare centre and administration block<br />
co-located on <strong>the</strong> Clinton State School site. Construction was completed in<br />
December <strong>2011</strong>, <strong>the</strong> centre opened to <strong>the</strong> local community on 10 January 2012.<br />
Thankyou to BHP Billiton Mitsubishi Alliance (BMA), Queensland Government and<br />
<strong>the</strong> Australian Government Department of Education, Employment and Workplace<br />
Relations, for <strong>the</strong>ir significant financial support of <strong>the</strong>se projects.<br />
C&K <strong>Annual</strong> <strong>Report</strong> <strong>2011</strong> | 21