Islamic Development<br />

Bank/ <strong>Al</strong> Aqsa Fund<br />

Saudi Development Fund<br />

Funded by: The Saudi Development Fund<br />

Executed by: Islamic development Bank / <strong>Al</strong>-Aqsa Fund<br />

<strong>UNDP</strong>/PAPP<br />

Implemented by : United Nations Development Programme/ Programme of<br />

Assistance to the Palestinian People<br />

<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

Jerusalem<br />

ITB: PAL10/ITB/59711/ <strong>Jabal</strong> <strong>Al</strong> Zaytoon<br />

Section 9: <strong>BOQ</strong><br />

for rehabilitation works of the Multi-Purpose Hall<br />

Oct 2008


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

1 Civil Works<br />

1.1 Supply, and install grilled acoustic gypsum boards panels on<br />

the internal boundary walls of the hall, to be 10 cm thick.<br />

Price shall include filling the space between the panels and<br />

the wall with 48 kg/m 3 Rock Wool sheets, all related metal<br />

fixing elements are included, besides supplying and<br />

applying putty and paint to all gypsum works, all decorative<br />

an duct beams, edges, recessed slab, squares, cuts,<br />

suspension& structural profiles. <strong>Al</strong>l to be done according to<br />

specifications and the approval of the Engineer.<br />

1.2 Supply and install PVC flooring type "Teraclean", 2mm<br />

thick or equivalent for the hall as directed by the engineer.<br />

The price includes the installation of skirting The pvc<br />

flooring should be fixed using conductive adhesive and<br />

complete seal of joints all in accordance to manufacturer<br />

instructions . The Installations for pvc flooring, skirting,<br />

terminations with walls/outer& inner corners shall be strictly<br />

implemented by professional and in accordance to the<br />

manufacturer's recommendation. Color to be determined by<br />

the engineer<br />

1.3 Carefully dismantling the existing false ceiling panels and<br />

strengthening the profiles if necessary and replacing the<br />

broken ones after conducting the electrical and mechanical<br />

works.<br />

1.4 Supply and cast reinforced concrete B300 for machine<br />

foundations as per the detailed drawing.The price includes<br />

the required steel reinforcement.<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

Total of Civil works<br />

1 - 6<br />

M2 350<br />

M2 240<br />

Job 1<br />

M2 5


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

2 Electrical Works<br />

2.1 Carefully dismantling and reinstalling if required all the<br />

electrical systems from the space ( before gypsum works)<br />

inside the hall; including lighting systems, electrical sockets,<br />

and all related items, and removing all the units to a safe<br />

place approved by the Engineer. Price shall also include<br />

cleaning the area and preparing it for the lighting, power and<br />

all related electrical works. <strong>Al</strong>l as instructed and approved<br />

by the Engineer.<br />

Important Notes: <strong>Al</strong>l materials and accessories to be used<br />

shall be according to the Approved Manufacturer List<br />

attached to the electrical specifications (see attachment # 1)<br />

2.2 Electrical Points:<br />

The electrical power supply from electrical switchboard to<br />

first point in circuit shall be included in the unit price of that<br />

point (by means of wires, cables or leads in self<br />

extinguishing conduits and cables). <strong>Al</strong>l as per specifications<br />

and as required.<br />

2.2.1 Supply, install and connect standard lighting point internal or<br />

external, in slab or over false ceiling, to include a 16 mm<br />

diameter conduit, 1.5 or 2.5 sq.mm cross-section leads or<br />

cable, and, as required single , double, Dimming switch,<br />

two way or push button lighting switch , and outlet for<br />

luminaries with junction box and terminals.<br />

2.2.3 Supply, install and connect a 16A wall socket point - to<br />

include a 16 mm dia. Conduit, (3x2.5) sq.mm cross-section<br />

leads or cables, and as required 16 A wall socket outlet.<br />

Job 1<br />

No. 15<br />

No. 9<br />

2.2.4 Ditto, but double socket outlet. No. 2<br />

2.2.4 Supply, install and connect Fire <strong>Al</strong>arm connection point<br />

(Price includes 16 mm diameter conduit with cable, leading<br />

from point to the LV box or to the nearest point).<br />

2.2.5 Supply, install and connect a 80A Power Point including<br />

80A (3PH) isolator switch, conduits, boxes for the Package<br />

Unit on the roof, the works according to drawings,<br />

specifications and Engineer instructions.<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

2 - 6<br />

No. 8<br />

No. 1


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

2.3 Electrical Switchboards:<br />

2.3.1 Supply and install of electrical switchboard for the power<br />

feeding of the A/C unit including all associated materials<br />

and labour. Cabinet with no access from the rear , made<br />

up of transparent polycarbonate cells, or sheet metal<br />

cabinets with 25% surplus space. Price to include all<br />

structural elements required in order to install the<br />

switchboard including all bus bars , terminals , wiring , bolts<br />

, clamps, etc. and for the equipments needed. The<br />

switchboard shall contain accessories made by one of the<br />

following manufacturers: KLOCKNER MOLLER, MERLIN<br />

GERIN, or equivalent according to packaged unit need<br />

includind main mccb,digital metering, branch mcb's, with all<br />

required wirings and control accessories all in accordance<br />

with package unit requirements complete and ready for<br />

work, the contractor shall prepare detailed work shop<br />

drawing for the switch board according to the sequence of<br />

work of the unit for the approvals of the Engineers. The<br />

price shall include installing of all the required circuit<br />

No. 1<br />

connecting all breaker with all necessary accessories to complete the system as per the approval of the Engineer also.<br />

2.3.2 Supply, install, connect and test 3KG FM-200 for the<br />

distribution board complete with all required materials and<br />

accessories.<br />

2.4 Cables:<br />

Supply, install and connect XLPE non-armored type<br />

thermoplastic copper cables, including insertion into conduit<br />

or attachment to structural elements or laying in ductwork,<br />

including all associated materials, all required Perforated<br />

Cable tray with covle , insulation materials, unions,Z<br />

construction, ladders, cable shoes and connection of cable<br />

at both ends.<br />

No. 1<br />

2.4.1 5X25 sq.mm cross section MR 25<br />

2.5 Conduit, Rigid Piping and Excavation Works:<br />

Supply, install and connect Self-extinguishing type plastic<br />

conduit, processed over or under plaster or inside castings,<br />

including junction boxes, unions, connectors, etc. including<br />

excavation , backfilling , sand , tape , manholes and covers<br />

and galvanized draw-strings, ready for use (for works not<br />

included in points works).<br />

2.5.1 ∅2" diameter. ML 50<br />

2.5.2 ∅4" diameter. ML 20<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

3 - 6


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

2.6 Fire <strong>Al</strong>arm System:<br />

Supply install and connect complete in place and in an<br />

operable manner the fire alarm system. The work is to<br />

include the supply of the equipment specified, installation of<br />

same connection, wiring, cables, commissioning and all of<br />

the details and connecting to the existing system as<br />

specified in the technical specifications and drawing type<br />

shall be according to the approved manufacturer list.<br />

2.6.1 Main addressable fire alarm control panel up to three zones<br />

with batteries and charger.<br />

Unit 1<br />

2.6.2 Manually operated alarm call point . Unit 3<br />

2.6.3 Indoor fire alarm siren . Unit 2<br />

2.6.4 Ionization smoke detector. Unit 4<br />

2.7 Rack Sound System<br />

2.7.1 Supply, install, test & commission the main “Rack sound<br />

system (digital) not less than 120W(RMS), complete with<br />

amplification and control unit, operator console, two portable<br />

microphones, auto reversing cassette player, 6 Disc CD<br />

player, AM/FM tuner, Power supply unit, Amplifier routing<br />

mixer, graphic equalizer, amplifiers and all other<br />

accessories.<br />

Notes:<br />

Contractor shall submit calculations and complete study, to<br />

achieve correct and clear voice in each area of the building<br />

according to instructions of approved manufacturer.<br />

2.7.2 Supply, install, test & commission 24W column type<br />

loudspeaker, the price shall include approved suitable<br />

cables, conduits and all accessories as per specifications<br />

and engineer instructions.<br />

2.7.3 Loud speaker, recessed in false ceiling (6w) with match<br />

transformer.<br />

2.8 LV Boxes:<br />

Supply install and connect the following LV boxes. Rate to<br />

include all required materials, conduits, wires, cables and<br />

accessories manufacturing from galvanized sheet metal<br />

sheets , painted with the same color of the switch boards all<br />

as specified in the technical specification and drawings.<br />

L.S 1<br />

No. 5<br />

No. 10<br />

2.8.1 LVB Approximate dim.( 60x60x25) cm No. 1<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

Total of Electrical Works<br />

4 - 6


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

3 Mechanical Works<br />

PREAMBLE<br />

The Contractor shall, when pricing the rates of this bill, take<br />

into consideration including and allow for the costs or<br />

expenses of all requirements stipulated in the preambles,<br />

drawings and technical specification of the contract. He<br />

should pay a visit to the site to get himself familiar with the<br />

required works, and moreover, he should contact the<br />

concerned <strong>UNDP</strong> personnel for any needed clarification on<br />

the described works or the content of the bid documents.<br />

The following notes should be considered when pricing:<br />

a- The price shall include all required digging or excavation<br />

backfilling and cement covering as specified.<br />

b- The price shall include all power and control electrical<br />

connections, as well as, all mechanical connections,<br />

including all supports, trays, hangers, brackets, bolts,<br />

screws, pipes, cables, wires, insulation, cladding,...., and all<br />

needed accessories to complete the works in full and to the<br />

satisfaction of the Engineer.<br />

c- The contractor must consider keeping the system running<br />

during the whole construction period.<br />

3.1 Supply and install of cold forged aluminum supply 4 way<br />

ceiling diffusers with volume dampers and all required fixing<br />

adaptors and flexible connection with duct as shown on<br />

drawings, all as made by Cooling Industries or Equally<br />

Approved (E.A).<br />

3.1.1 15"X15" No. 20<br />

3.1.2 Ditto but return grills, size is 24"X24" No. 6<br />

3.2 Supply and install single skin galvanized steel duct made<br />

according to SMACNA with 11/2" thick , 12kg/m3 density<br />

glass wool insulation cladded with reinforced aluminum foil.<br />

The rate shall include all required hanger, supports,<br />

isolation, splitter dampers and vanes, flexible connection<br />

and all required accessories made as shown in the drawings<br />

and according to specifications.<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

5 - 6<br />

M2 280


<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />

<strong>BOQ</strong><br />

No. Description Unit Qty. Unit Rate Total<br />

3.3 Ditto, but with 0.6mm Galvanized sheet cladding for<br />

protection of exposed duct work on the exterior including all<br />

screws, fittings, sealant, and all materials needed to<br />

complete the job according to drawings, specifications and<br />

the approval of the Engineer.<br />

3.4 Supply and install modular, weather proof type Packaged<br />

Heat Pump Unit constructed from aluminum penta post with<br />

double skin panels and insulated with injected polyurethane<br />

2" thick with no thermal bridge on the evaporator side, as<br />

made by Carrier, York, Daikin, or EA of 27 TR and 10'500<br />

cfm capacity including 20% fresh air. The unit shall be<br />

equipped with backward curved centrifugal fan fixed on an<br />

anti-vibration mounts, one heating/cooling coil, dampers for<br />

fresh and return air, primary air filter, bag filters, drain<br />

syphone, and all needed fixing accessories all made<br />

according to drawings and as specified. The contractor shall<br />

supply spare bag filters for four consecutive filter changes,<br />

all to be included in the price of the unit. The bidder shall<br />

also account in the bill item for the cost of all the cables,<br />

wires, sensors, thermostat, trays, hangers, etc, needed to<br />

connect the unit to the electric panel, and to operate the unit<br />

to the satisfaction of the Engineer.<br />

3.5 Supply and install Sound attenuators, as made by Sound<br />

Attenuators Ltd., flanged square type of 1 meter long<br />

minimum and 60X100 cm face area. The silencers shall<br />

be manufactured to meet the sound criteria set for Multipurpose<br />

halls as per latest edition of ASHRAE standard.<br />

The silencer shall be installed on the package unit<br />

supply and return ducts. The silencer shall be<br />

manufactured of double skin (1.2mm solid GI sheet on the<br />

outer skin, 0.8mm perforated GI sheet on the inner skin and<br />

splitters) with fiber glass fill of 48kg/m3 density, all seated<br />

on sturdy steel support.<br />

2.5 Suplly and install metal stand for the packaged A/C unit as<br />

shown on drawings of hight 200 cm with variable length and<br />

width. The stand shall be constructed from heavy steel<br />

profiles as described in the drawings, with maintenance<br />

platform and maintenance ladder, to be fixed with proper<br />

arch welding. Price shall include all the required anti-rust<br />

painting and all the needed painting with colors approved by<br />

the Engineers. The steel structure legs shall be seated on<br />

suitable concrete blocks, while neoprene pads shall buffer<br />

the structure legs from the concrete blocks and the unit from<br />

the structure frame, all to be accounted for in the unit rate<br />

as well..<br />

Total of Mechanical carried Summary Sheet<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit<br />

6 - 6<br />

M2 35<br />

No. 1<br />

No. 2<br />

L.S 1


<strong>Jabal</strong> <strong>Al</strong>-Zaytoon Club<br />

Bill No. Description Total<br />

Total of of Civil Works<br />

Total of of Electrical Works Works<br />

Total of of Mechanical Works<br />

NET TOTAL SUM (in words ) :<br />

SIGNED AND SEALED :<br />

AUTHOURIZED :<br />

TITLE :<br />

SIGNATURE :<br />

DATE :<br />

Grand Total<br />

Discount<br />

Discount Amount<br />

Net Total<br />

Summary<br />

<strong>UNDP</strong> - PAPP<br />

Engineering Unit Summary