Islamic Development<br />
Bank/ <strong>Al</strong> Aqsa Fund<br />
Saudi Development Fund<br />
Funded by: The Saudi Development Fund<br />
Executed by: Islamic development Bank / <strong>Al</strong>-Aqsa Fund<br />
<strong>UNDP</strong>/PAPP<br />
Implemented by : United Nations Development Programme/ Programme of<br />
Assistance to the Palestinian People<br />
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
Jerusalem<br />
ITB: PAL10/ITB/59711/ <strong>Jabal</strong> <strong>Al</strong> Zaytoon<br />
Section 9: <strong>BOQ</strong><br />
for rehabilitation works of the Multi-Purpose Hall<br />
Oct 2008
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
1 Civil Works<br />
1.1 Supply, and install grilled acoustic gypsum boards panels on<br />
the internal boundary walls of the hall, to be 10 cm thick.<br />
Price shall include filling the space between the panels and<br />
the wall with 48 kg/m 3 Rock Wool sheets, all related metal<br />
fixing elements are included, besides supplying and<br />
applying putty and paint to all gypsum works, all decorative<br />
an duct beams, edges, recessed slab, squares, cuts,<br />
suspension& structural profiles. <strong>Al</strong>l to be done according to<br />
specifications and the approval of the Engineer.<br />
1.2 Supply and install PVC flooring type "Teraclean", 2mm<br />
thick or equivalent for the hall as directed by the engineer.<br />
The price includes the installation of skirting The pvc<br />
flooring should be fixed using conductive adhesive and<br />
complete seal of joints all in accordance to manufacturer<br />
instructions . The Installations for pvc flooring, skirting,<br />
terminations with walls/outer& inner corners shall be strictly<br />
implemented by professional and in accordance to the<br />
manufacturer's recommendation. Color to be determined by<br />
the engineer<br />
1.3 Carefully dismantling the existing false ceiling panels and<br />
strengthening the profiles if necessary and replacing the<br />
broken ones after conducting the electrical and mechanical<br />
works.<br />
1.4 Supply and cast reinforced concrete B300 for machine<br />
foundations as per the detailed drawing.The price includes<br />
the required steel reinforcement.<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
Total of Civil works<br />
1 - 6<br />
M2 350<br />
M2 240<br />
Job 1<br />
M2 5
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
2 Electrical Works<br />
2.1 Carefully dismantling and reinstalling if required all the<br />
electrical systems from the space ( before gypsum works)<br />
inside the hall; including lighting systems, electrical sockets,<br />
and all related items, and removing all the units to a safe<br />
place approved by the Engineer. Price shall also include<br />
cleaning the area and preparing it for the lighting, power and<br />
all related electrical works. <strong>Al</strong>l as instructed and approved<br />
by the Engineer.<br />
Important Notes: <strong>Al</strong>l materials and accessories to be used<br />
shall be according to the Approved Manufacturer List<br />
attached to the electrical specifications (see attachment # 1)<br />
2.2 Electrical Points:<br />
The electrical power supply from electrical switchboard to<br />
first point in circuit shall be included in the unit price of that<br />
point (by means of wires, cables or leads in self<br />
extinguishing conduits and cables). <strong>Al</strong>l as per specifications<br />
and as required.<br />
2.2.1 Supply, install and connect standard lighting point internal or<br />
external, in slab or over false ceiling, to include a 16 mm<br />
diameter conduit, 1.5 or 2.5 sq.mm cross-section leads or<br />
cable, and, as required single , double, Dimming switch,<br />
two way or push button lighting switch , and outlet for<br />
luminaries with junction box and terminals.<br />
2.2.3 Supply, install and connect a 16A wall socket point - to<br />
include a 16 mm dia. Conduit, (3x2.5) sq.mm cross-section<br />
leads or cables, and as required 16 A wall socket outlet.<br />
Job 1<br />
No. 15<br />
No. 9<br />
2.2.4 Ditto, but double socket outlet. No. 2<br />
2.2.4 Supply, install and connect Fire <strong>Al</strong>arm connection point<br />
(Price includes 16 mm diameter conduit with cable, leading<br />
from point to the LV box or to the nearest point).<br />
2.2.5 Supply, install and connect a 80A Power Point including<br />
80A (3PH) isolator switch, conduits, boxes for the Package<br />
Unit on the roof, the works according to drawings,<br />
specifications and Engineer instructions.<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
2 - 6<br />
No. 8<br />
No. 1
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
2.3 Electrical Switchboards:<br />
2.3.1 Supply and install of electrical switchboard for the power<br />
feeding of the A/C unit including all associated materials<br />
and labour. Cabinet with no access from the rear , made<br />
up of transparent polycarbonate cells, or sheet metal<br />
cabinets with 25% surplus space. Price to include all<br />
structural elements required in order to install the<br />
switchboard including all bus bars , terminals , wiring , bolts<br />
, clamps, etc. and for the equipments needed. The<br />
switchboard shall contain accessories made by one of the<br />
following manufacturers: KLOCKNER MOLLER, MERLIN<br />
GERIN, or equivalent according to packaged unit need<br />
includind main mccb,digital metering, branch mcb's, with all<br />
required wirings and control accessories all in accordance<br />
with package unit requirements complete and ready for<br />
work, the contractor shall prepare detailed work shop<br />
drawing for the switch board according to the sequence of<br />
work of the unit for the approvals of the Engineers. The<br />
price shall include installing of all the required circuit<br />
No. 1<br />
connecting all breaker with all necessary accessories to complete the system as per the approval of the Engineer also.<br />
2.3.2 Supply, install, connect and test 3KG FM-200 for the<br />
distribution board complete with all required materials and<br />
accessories.<br />
2.4 Cables:<br />
Supply, install and connect XLPE non-armored type<br />
thermoplastic copper cables, including insertion into conduit<br />
or attachment to structural elements or laying in ductwork,<br />
including all associated materials, all required Perforated<br />
Cable tray with covle , insulation materials, unions,Z<br />
construction, ladders, cable shoes and connection of cable<br />
at both ends.<br />
No. 1<br />
2.4.1 5X25 sq.mm cross section MR 25<br />
2.5 Conduit, Rigid Piping and Excavation Works:<br />
Supply, install and connect Self-extinguishing type plastic<br />
conduit, processed over or under plaster or inside castings,<br />
including junction boxes, unions, connectors, etc. including<br />
excavation , backfilling , sand , tape , manholes and covers<br />
and galvanized draw-strings, ready for use (for works not<br />
included in points works).<br />
2.5.1 ∅2" diameter. ML 50<br />
2.5.2 ∅4" diameter. ML 20<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
3 - 6
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
2.6 Fire <strong>Al</strong>arm System:<br />
Supply install and connect complete in place and in an<br />
operable manner the fire alarm system. The work is to<br />
include the supply of the equipment specified, installation of<br />
same connection, wiring, cables, commissioning and all of<br />
the details and connecting to the existing system as<br />
specified in the technical specifications and drawing type<br />
shall be according to the approved manufacturer list.<br />
2.6.1 Main addressable fire alarm control panel up to three zones<br />
with batteries and charger.<br />
Unit 1<br />
2.6.2 Manually operated alarm call point . Unit 3<br />
2.6.3 Indoor fire alarm siren . Unit 2<br />
2.6.4 Ionization smoke detector. Unit 4<br />
2.7 Rack Sound System<br />
2.7.1 Supply, install, test & commission the main “Rack sound<br />
system (digital) not less than 120W(RMS), complete with<br />
amplification and control unit, operator console, two portable<br />
microphones, auto reversing cassette player, 6 Disc CD<br />
player, AM/FM tuner, Power supply unit, Amplifier routing<br />
mixer, graphic equalizer, amplifiers and all other<br />
accessories.<br />
Notes:<br />
Contractor shall submit calculations and complete study, to<br />
achieve correct and clear voice in each area of the building<br />
according to instructions of approved manufacturer.<br />
2.7.2 Supply, install, test & commission 24W column type<br />
loudspeaker, the price shall include approved suitable<br />
cables, conduits and all accessories as per specifications<br />
and engineer instructions.<br />
2.7.3 Loud speaker, recessed in false ceiling (6w) with match<br />
transformer.<br />
2.8 LV Boxes:<br />
Supply install and connect the following LV boxes. Rate to<br />
include all required materials, conduits, wires, cables and<br />
accessories manufacturing from galvanized sheet metal<br />
sheets , painted with the same color of the switch boards all<br />
as specified in the technical specification and drawings.<br />
L.S 1<br />
No. 5<br />
No. 10<br />
2.8.1 LVB Approximate dim.( 60x60x25) cm No. 1<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
Total of Electrical Works<br />
4 - 6
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
3 Mechanical Works<br />
PREAMBLE<br />
The Contractor shall, when pricing the rates of this bill, take<br />
into consideration including and allow for the costs or<br />
expenses of all requirements stipulated in the preambles,<br />
drawings and technical specification of the contract. He<br />
should pay a visit to the site to get himself familiar with the<br />
required works, and moreover, he should contact the<br />
concerned <strong>UNDP</strong> personnel for any needed clarification on<br />
the described works or the content of the bid documents.<br />
The following notes should be considered when pricing:<br />
a- The price shall include all required digging or excavation<br />
backfilling and cement covering as specified.<br />
b- The price shall include all power and control electrical<br />
connections, as well as, all mechanical connections,<br />
including all supports, trays, hangers, brackets, bolts,<br />
screws, pipes, cables, wires, insulation, cladding,...., and all<br />
needed accessories to complete the works in full and to the<br />
satisfaction of the Engineer.<br />
c- The contractor must consider keeping the system running<br />
during the whole construction period.<br />
3.1 Supply and install of cold forged aluminum supply 4 way<br />
ceiling diffusers with volume dampers and all required fixing<br />
adaptors and flexible connection with duct as shown on<br />
drawings, all as made by Cooling Industries or Equally<br />
Approved (E.A).<br />
3.1.1 15"X15" No. 20<br />
3.1.2 Ditto but return grills, size is 24"X24" No. 6<br />
3.2 Supply and install single skin galvanized steel duct made<br />
according to SMACNA with 11/2" thick , 12kg/m3 density<br />
glass wool insulation cladded with reinforced aluminum foil.<br />
The rate shall include all required hanger, supports,<br />
isolation, splitter dampers and vanes, flexible connection<br />
and all required accessories made as shown in the drawings<br />
and according to specifications.<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
5 - 6<br />
M2 280
<strong>Jabal</strong> <strong>Al</strong> Zaytoon Club<br />
<strong>BOQ</strong><br />
No. Description Unit Qty. Unit Rate Total<br />
3.3 Ditto, but with 0.6mm Galvanized sheet cladding for<br />
protection of exposed duct work on the exterior including all<br />
screws, fittings, sealant, and all materials needed to<br />
complete the job according to drawings, specifications and<br />
the approval of the Engineer.<br />
3.4 Supply and install modular, weather proof type Packaged<br />
Heat Pump Unit constructed from aluminum penta post with<br />
double skin panels and insulated with injected polyurethane<br />
2" thick with no thermal bridge on the evaporator side, as<br />
made by Carrier, York, Daikin, or EA of 27 TR and 10'500<br />
cfm capacity including 20% fresh air. The unit shall be<br />
equipped with backward curved centrifugal fan fixed on an<br />
anti-vibration mounts, one heating/cooling coil, dampers for<br />
fresh and return air, primary air filter, bag filters, drain<br />
syphone, and all needed fixing accessories all made<br />
according to drawings and as specified. The contractor shall<br />
supply spare bag filters for four consecutive filter changes,<br />
all to be included in the price of the unit. The bidder shall<br />
also account in the bill item for the cost of all the cables,<br />
wires, sensors, thermostat, trays, hangers, etc, needed to<br />
connect the unit to the electric panel, and to operate the unit<br />
to the satisfaction of the Engineer.<br />
3.5 Supply and install Sound attenuators, as made by Sound<br />
Attenuators Ltd., flanged square type of 1 meter long<br />
minimum and 60X100 cm face area. The silencers shall<br />
be manufactured to meet the sound criteria set for Multipurpose<br />
halls as per latest edition of ASHRAE standard.<br />
The silencer shall be installed on the package unit<br />
supply and return ducts. The silencer shall be<br />
manufactured of double skin (1.2mm solid GI sheet on the<br />
outer skin, 0.8mm perforated GI sheet on the inner skin and<br />
splitters) with fiber glass fill of 48kg/m3 density, all seated<br />
on sturdy steel support.<br />
2.5 Suplly and install metal stand for the packaged A/C unit as<br />
shown on drawings of hight 200 cm with variable length and<br />
width. The stand shall be constructed from heavy steel<br />
profiles as described in the drawings, with maintenance<br />
platform and maintenance ladder, to be fixed with proper<br />
arch welding. Price shall include all the required anti-rust<br />
painting and all the needed painting with colors approved by<br />
the Engineers. The steel structure legs shall be seated on<br />
suitable concrete blocks, while neoprene pads shall buffer<br />
the structure legs from the concrete blocks and the unit from<br />
the structure frame, all to be accounted for in the unit rate<br />
as well..<br />
Total of Mechanical carried Summary Sheet<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit<br />
6 - 6<br />
M2 35<br />
No. 1<br />
No. 2<br />
L.S 1
<strong>Jabal</strong> <strong>Al</strong>-Zaytoon Club<br />
Bill No. Description Total<br />
Total of of Civil Works<br />
Total of of Electrical Works Works<br />
Total of of Mechanical Works<br />
NET TOTAL SUM (in words ) :<br />
SIGNED AND SEALED :<br />
AUTHOURIZED :<br />
TITLE :<br />
SIGNATURE :<br />
DATE :<br />
Grand Total<br />
Discount<br />
Discount Amount<br />
Net Total<br />
Summary<br />
<strong>UNDP</strong> - PAPP<br />
Engineering Unit Summary