07.04.2013 Views

Peel Inlet and Harvey Estuary System Management Strategy ...

Peel Inlet and Harvey Estuary System Management Strategy ...

Peel Inlet and Harvey Estuary System Management Strategy ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EPA Report on the <strong>Peel</strong>-<strong>Harvey</strong> Progress <strong>and</strong> Compliance Report, 2003<br />

Environmental Protection (<strong>Peel</strong>-<strong>Harvey</strong> <strong>Estuary</strong>) Policy 1992 (as revised from time to<br />

time).<br />

ERC Recommendation W1<br />

It is recommended that scaled phosphorus targets for Serpentine River at Dog Hill, the<br />

Murray River at Pinjarra, <strong>and</strong> <strong>Harvey</strong> River at Clifton Park be used to complement the<br />

system-wide targets contained in the Ministerial Conditions. This will provide a nested<br />

series of catchment targets for different scales of application to support compliance<br />

testing.<br />

ERC Recommendation W2<br />

It is recommended that the current system targets for estuarine water quality <strong>and</strong><br />

catchment runoff should be maintained <strong>and</strong> reviewed again in 10 years. This would<br />

allow for a longer series of flow years on which to base a system-wide performance<br />

audit.<br />

ERC Recommendation W3<br />

It is recommended that other measures of system health for the estuary, rivers, streams,<br />

wetl<strong>and</strong>s <strong>and</strong> the <strong>Peel</strong>-<strong>Harvey</strong> catchment be explored. Given the degree of community<br />

interest in the <strong>Peel</strong>-<strong>Harvey</strong> <strong>Estuary</strong> <strong>System</strong>, it is recommended that the EPA should<br />

commence extensive public consultation to obtain the community’s views on the<br />

environmental quality it desires <strong>and</strong> meaningful measures of system health for the<br />

estuaries <strong>and</strong> the catchment<br />

ERC Recommendation W4<br />

It is recommended that the current phosphorus target for estuarine water quality <strong>and</strong><br />

catchment runoff should be maintained until at least the year 2008 <strong>and</strong> reviewed in the<br />

light of valid monitoring data.<br />

ERC Recommendation W5<br />

It is recommended that bottom-end target loads for nitrogen should be developed in<br />

accordance with the targets set in the EPP.<br />

ERC Recommendation W6<br />

It is recommended that a nutrient inventory be prepared to facilitate the identification of<br />

nutrient hotspots <strong>and</strong> the cumulative impacts of more diffuse ones, <strong>and</strong> to enable a riskbased<br />

approach to nutrient reduction to be implemented.<br />

ERC Recommendation W7<br />

It is recommended that an independent system-wide audit of the environmental condition<br />

of the estuaries, rivers, streams, wetl<strong>and</strong>s <strong>and</strong> the <strong>Peel</strong>-<strong>Harvey</strong> catchment (including<br />

42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!