Noise pollution will result from cutting, boring and blasting activities and routine machine operating<br />

activities taking place at the mining site; and from tractor-trailer operating activities along road<br />

alignments. Noise resulting from cutting, boring and blasting activities is anticipated to be<br />

intermittent, occurring on a weekly or bi-weekly basis only, and otherwise are not anticipated to<br />

travel extensively beyond the mining site owing to the dampening effect of the granite material itself,<br />

as well as its sub-grade extraction. Routine machine operation and tractor-trailer transport are not<br />

anticipated to produce noise levels significantly in excess or routine highway noise levels, or<br />

approximately 60 db, however, workers in either case will be issued protective gear during working<br />

hours to offset any risk of hearing loss. In all cases, noise travel will be least during daylight hours<br />

when air density is least, and therefore all of the above-referenced noise producing activities will be<br />

kept to daylight hours of operation.<br />

Site Decommissioning & Rehabilitation Plan<br />

All stone dust, rubble and fragments not suited to processing for export will either be passed<br />

through a crusher for the production and sale of graded chip stone, or will be mixed with previously<br />

removed overburden and topsoil to prevent the formation of eroding, subterranean, high-velocity<br />

groundwater travel zones. Overburden and topsoils will be bladed over the exposed granite<br />

basement rock in their pre-removal orientation, graded into a low-erosion profile, and then<br />

compacted into place prior to being re-seeded with milpa rice to further reduce erosion and to<br />

promote natural re-colonization of the area by local vegetation. <strong>The</strong> transverse section mined<br />

previously to the section being actively mined will be used for heavy equipment access; and the<br />

transverse section mined prior to those two sections will be decommissioned and rehabilitated with<br />

spoil from the two subsequent sections.<br />

Assuming then that each transverse section might span as much as 150 meters width (i.e. between<br />

the branches of Pinol Creek) by 100 meters length (i.e. along the long axis of the ridgeline), then<br />

not more than approximately 3.75 acres of land surface would be expected to be actively mined at<br />

any given time, and not more than 10 acres (i.e. three adjoining transverse sections), would be<br />

expected to be in the process of being mined, filled or rehabilitated at any given time.<br />

Staff Requirements<br />

A total of 65 mining staff are estimated to be engaged by CMCML at full scale operation, and<br />

another 55 personnel will be engaged in administration, sales, machine and transport operations<br />

between the mining site and the factory floor. No staff are anticipated to reside at the mining site.<br />

A total of 4 watchmen will occupy 3 shifts / day, 7 days per week, but also will not be present for<br />

more than 12 hours during any single shift at the mining site.<br />