Terms of reference<br />

Vocational Education and Training Reform Strategy and Pilot Implementation in a selected region in<br />

Azerbaijan<br />

Activities:<br />

• Ensure the readiness of the pilot school to initiate competency-based learning<br />

process. Competency-based learning process in Ismayilli vocational school can start<br />

only after:<br />

(1) all the previous results (2.1-2.5) of the Operational component are achieved,<br />

(2) the school’s facilities are in proper order,<br />

(3) the equipment has been supplied and the teaching staff has learnt how to use<br />

it.<br />

• Secure the approval by the Project Partner of new programmes adapted to the needs<br />

of the Tourism sector.<br />

• Evaluate the contribution of the VET stakeholders to the success of the experiment.<br />

• Suggest measures for the replication of such a model of partnership to other regions<br />

and economic sectors of Azerbaijan.<br />

Result 2.7: Substantial and practical proposals deriving from the results of the pilot<br />

partnership are provided to public decision makers and other key stakeholders for the<br />

preparation of the VET strategy<br />

Activities:<br />

• Prepare report based on outputs of Result 2.6.<br />

• Present report indepth to the Coordination Council.<br />

• Implement activities from the Awareness Raising Campaign (4.2.4) and Final Phase<br />

(4.2.5) of project.<br />

4.2.3 Support to supply contract<br />

This service contract will be run in parallel with a separate supply tender procedure for<br />

equipment. As a result, the Consultant under this Service Contract will be required to:<br />

• to write the technical specification of the equipment to be purchased through the<br />

Supply Contract,<br />

• to assist in the preparation of the tender dossier,<br />

• to assist in the tender evaluation, and<br />

• to follow-up the actual installation of equipment delivered.<br />

Page 19