Terms of reference<br />
Vocational Education and Training Reform Strategy and Pilot Implementation in a selected region in<br />
Azerbaijan<br />
management team may also be supported by international and local long- and short-term<br />
experts and a regional coordinator.<br />
The Consultant has full responsibility for overall contract performance, finances,<br />
expenditure and reports directly resulting from the project. Whilst the responsibility for the<br />
choice and application of appropriate project management lies with the Contractor,<br />
attention is drawn to the EC’s Project Cycle Management Manual, which outlines current<br />
best practise. With regard to the <strong>Logical</strong> <strong>Framework</strong> methodology this should be viewed as<br />
obligatory and shall form a central part of the Inception Report.<br />
4.3.3. Facilities to be provided by the Contracting Party and/or other parties<br />
In Baku, the office accommodation for the project will be located within the premises of<br />
the Ministry of Education. In Ismayilli, it will be located close to or in the selected school.<br />
The office accomodation of a reasonable standard and of approximately 10 square metres<br />
for each expert working on the contract is to be provided free of charge by the Azerbaijani<br />
Authorities both in Baku and in Ismayilli.<br />
The Project Partner will also provide such assistance to the Consultant as necessary to<br />
arrange visas for expatriate personnel of the Consultant, and customs clearance and inland<br />
transport (from border point to final destination) for the Consultant’s imported equipment.<br />
5. LOGISTICS AND TIMING<br />
5.1 Location<br />
The operational base for the project will be Baku, the Daglig Shirwan economic region and<br />
Ismayilli where pilot activities will take place.<br />
5.2 Commencement date & period of execution<br />
The intended commencement date is end June 2008, and the period of execution of the<br />
contract will be 30 months from this date. Please refer to Articles 4 and 5 of the Special<br />
Conditions for the actual commencement date and period of execution.<br />
The Contracting Authority may, at its own discretion, extend the project in duration and/or<br />
scope, subject to the availability of funding. Any subsequent extension of the contract will<br />
be subject to satisfactory performance by the Consultant. This shall be judged in particular,<br />
in terms of the progress towards the achievement of the project purpose and the delivery of<br />
the anticipated results. The intervention of events outside of the Consultant’s control shall<br />
also be taken into consideration.<br />