High School Level Need Action Timeline Budget Responsibility<br />
1. Provide Access to Appropriate Technology Resources<br />
IT<br />
Develop accessible online inventory 7/04 to 3/05 IT<br />
Determine status of current<br />
resources<br />
Create and maintain an online inventory of technology resources.<br />
2. Extend and Maximixe Opportunities in Technology-Rich Learning<br />
Environments<br />
Ongoing C&I C&I<br />
1. Continue to provide professional<br />
development<br />
2. Submit the EPSD Cyclical Tool<br />
for tech support for extended<br />
day/weekend use<br />
Focus on maximizing the use of technology included in the newly Maximize use of technology<br />
11/04 to 1/05 Supt Personnel and IT<br />
constructed multi-media center to enhance the curriculum and instruction.<br />
3. Development of Resources<br />
IT<br />
Provide to instructional personnel access to training materials, curriculum, Improve access to resources 1. Improve district web service Ongoing IT<br />
Information owners<br />
research links, online resources, and lesson plans integrated with technology. 2. Coordinate content Ongoing No cost<br />
C&I<br />
Personnel and C&I<br />
4. Extend Technology Integration<br />
Provide instructional support through the addition of a Technology<br />
increase instructional technology 1. Submit EPSD Cyclical Tool 11/04 to 1/05 Supt<br />
support<br />
Integration Resource Teacher. 2. Hire teacher 08/04 Supt<br />
5. Support Professional Development<br />
C&I<br />
Provide courses through PDI Ongoing C&I<br />
Align with technological<br />
advancements and best<br />
teaching practices<br />
Provide appropriate professional development that demonstrates and<br />
promotes the integration of technology into the teaching practice.<br />
DRE<br />
Maintain active involvement in the District Technology Committee. Improve communication Increase collaboration Ongoing No cost<br />
District Level Action Timeline Budget Responsibility<br />
Computer installations (replacements & additions)<br />
Macungie Elementary<br />
IT IT<br />
Replace classroom PCs Completed 06/04<br />
12 teacher PCs installed in new<br />
IT<br />
EHS Addition<br />
classrooms Completed 06/04 Construction Funds<br />
IT<br />
Laptops<br />
90 laptops/3 carts for new addition Completed 06/04 Construction Funds<br />
Replace desktops with laptops for<br />
MS & Elem. H/W/F teachers<br />
IT IT<br />
Carol White Grant Completed 06/04<br />
New classroom technology following<br />
IT<br />
Alburtis Elementary<br />
construction Completed 09/04 Construction Funds<br />
New classroom technology following<br />
IT<br />
Shoemaker Elementary<br />
reconstruction Scheduled for 08/04 to 05/05 Construction Funds<br />
Jefferson Elementary<br />
Replace classroom PCs Summer 2005 IT IT<br />
LMMS Library<br />
Replace library PCs Summer 2004 IT IT<br />
Replace irreparable television sets Sets replaced throughout Macungie Completed 05/04 IT IT<br />
Elem. And in other schools as<br />
needed.<br />
Videoconferencing<br />
Funds available beginning IT<br />
IT<br />
Budgeted funds for line charges 07/04<br />
eBoard<br />
Renewed license Completed IT IT<br />
Nettrekker<br />
Renewed license Completed IT IT<br />
Schedule wiring project Completed 09/04 IT IT<br />
Additional data wiring to support<br />
networkable copiers, portable labs,<br />
individual laptops, classroom/office moves,<br />
etc.<br />
In-house web hosting<br />
To be operational by Spring IT<br />
IT<br />
Implement web server; design portal 2005<br />
Address remaining approved requests in<br />
IT<br />
IT<br />
2004-05 Technology Integration Plan<br />
Address individual requests On-going through 2004-05<br />
Building Tech Requests<br />
EPSD Technology Integration Plan<br />
Page 38