belgrade - with a foot on the north and an open hand ... - Koha Ditore
belgrade - with a foot on the north and an open hand ... - Koha Ditore
belgrade - with a foot on the north and an open hand ... - Koha Ditore
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
VI. Parallel local government system<br />
Coordinator’s office for <strong>the</strong> Strategy of North<br />
Four <strong>north</strong> municipalities of Kosovo operate in a complex reality described in this report.<br />
Three previous <strong>north</strong> municipalities Zvec<strong>an</strong>, Zubin Potok <strong><strong>an</strong>d</strong> Leposavic were under <strong>the</strong><br />
entire system of Kosovo, under UNMIK, as well as prior to 1999. After <strong>the</strong> declarati<strong>on</strong> of<br />
independence, <strong>the</strong> m<strong><strong>an</strong>d</strong>ate of <strong>the</strong>se three municipalities was extended by <strong>the</strong> president of<br />
Kosovo in cooperati<strong>on</strong> <str<strong>on</strong>g>with</str<strong>on</strong>g> UNMIK. This situati<strong>on</strong> temporary eliminated <strong>the</strong> created vacuum<br />
as a result of <strong>the</strong> new reality <strong><strong>an</strong>d</strong> <strong>the</strong> fact that <strong>the</strong> electi<strong>on</strong>s were not held <strong>the</strong>re. Although, it<br />
seams that such a rule was not regarded in <strong>the</strong> same was during <strong>the</strong> entire time.<br />
On <strong>the</strong> o<strong>the</strong>r h<strong><strong>an</strong>d</strong>, municipality of <strong>north</strong> Mitrovica created according to Ahtisary Package<br />
was not legitimated by free electi<strong>on</strong>s org<strong>an</strong>ized according to <strong>the</strong> kosovar legislati<strong>on</strong>. In fact,<br />
such electi<strong>on</strong>s were org<strong>an</strong>ized by Serb legislati<strong>on</strong>, at <strong>the</strong> time when internati<strong>on</strong>al instituti<strong>on</strong>s,<br />
especially <strong>the</strong> <strong>on</strong>es in Brussels, looked aside hoping that this will bring <strong>the</strong> Tadic’s DS<br />
formati<strong>on</strong> in local government, <str<strong>on</strong>g>with</str<strong>on</strong>g> hope that this could break <strong>the</strong> ice in <strong>north</strong> Mitrovica.<br />
On <strong>the</strong> o<strong>the</strong>r side, <strong>the</strong> electi<strong>on</strong>s <strong>an</strong>nounced several times by ICO <strong><strong>an</strong>d</strong> Ministry of Local<br />
Government were never implemented. ICO’s effort to create <strong>the</strong> so-called preparati<strong>on</strong> groups<br />
for <strong>the</strong> new MPT municipality was a huge failure. This group, first afraid by <strong>the</strong> parallel Serb<br />
structures, <strong><strong>an</strong>d</strong> <strong>the</strong>n due to <strong>the</strong> lack of org<strong>an</strong>izati<strong>on</strong> of free electi<strong>on</strong>s <strong><strong>an</strong>d</strong> <strong>the</strong> impossibility of<br />
<strong>the</strong>ir acting or <strong>an</strong>y activity that would etable <strong>the</strong>m in <strong>an</strong>y kind of authority, make this project<br />
to have no hope for acting in <strong>the</strong> future. On <strong>the</strong> c<strong>on</strong>trary, <strong>the</strong> activity of this group for<br />
decorating <strong>the</strong> Christmas tree for end of year celebrati<strong>on</strong>s in <strong>the</strong> municipality of Zvec<strong>an</strong><br />
raised more <strong>the</strong> reacti<strong>on</strong> of cynics realizing that a single tree cost around 5000 EUR.<br />
In this respect, <strong>the</strong> UAM operati<strong>on</strong> in <strong>north</strong> Mitrovica, fin<strong>an</strong>ced by <strong>the</strong> budget of Kosovo<br />
<str<strong>on</strong>g>with</str<strong>on</strong>g> a sum of 2.7 milli<strong>on</strong> EUR added <strong>an</strong>o<strong>the</strong>r element to <strong>the</strong> administrative complexity of<br />
<strong>north</strong> Mitrovica. Thus, in <strong>north</strong> Mitrovica, municipality electi<strong>on</strong>s according to Ahtisary were<br />
held, but three systems functi<strong>on</strong> <strong>the</strong>re: <strong>the</strong> municipality <strong>on</strong>e according to Serb electi<strong>on</strong>s,<br />
UAM as a combined way of UNMIK <str<strong>on</strong>g>with</str<strong>on</strong>g> permissi<strong>on</strong> of kosovar budget, <strong><strong>an</strong>d</strong> Kosovo<br />
instituti<strong>on</strong>s, if we take into account <strong>the</strong> <strong>open</strong> Office in Bosniak Mahala.<br />
Even though local government functi<strong>on</strong>s in this m<strong>an</strong>ner, sometimes linked <str<strong>on</strong>g>with</str<strong>on</strong>g> <strong>the</strong> system in<br />
Kosovo, <strong><strong>an</strong>d</strong> sometimes cooperating <str<strong>on</strong>g>with</str<strong>on</strong>g> a part of internati<strong>on</strong>als, relati<strong>on</strong> of local<br />
government <str<strong>on</strong>g>with</str<strong>on</strong>g> <strong>the</strong> mayor of <strong>the</strong> “<strong>north</strong> district” Radenko Nedelkovic is quite clear,<br />
sometimes even publicly dem<strong>on</strong>strated. Nedelkovic, ex-member of MUP, currently<br />
politically related to DS structures, tried to play <strong>the</strong> role of central facilitator regarding <strong>north</strong><br />
in <strong>the</strong> communicati<strong>on</strong> <strong>north</strong>-Belgrade-internati<strong>on</strong>al presence.<br />
31