Ethiopia SOCODEP CE - main report - IFAD
Ethiopia SOCODEP CE - main report - IFAD
Ethiopia SOCODEP CE - main report - IFAD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
58<br />
SO5 Relief of livestock health constraints, particularly<br />
with respect to draught animals, trough provision<br />
of veterinary drugs.<br />
- Animal heath situation in the project area - SES*<br />
O5.1 Access to veterinary drugs improved - Availability of veterinary drugs in the project area<br />
- Access to veterinary drugs by animal breeders<br />
- Use of veterinary drugs<br />
- SES*<br />
A5.1.1 Preparation of annual demand - Survey design<br />
- Survey design documents<br />
estimates<br />
- Survey results (data collected and analyzed)<br />
- Survey <strong>report</strong><br />
A5.1.2 Establishment of revolving fund - Volume of the fund established<br />
- PPRs; NBE KI*; CSS*<br />
account held by NBE<br />
- Functioning of the fund<br />
A5.1.3 Distribution of drugs. - Volume and nature of drugs distributed - PPRs; CSS*<br />
SO6 Improve access of rural families to services and<br />
markets by rehabilitating and <strong>main</strong>taining rural<br />
roads.<br />
- Number of SCs benefiting from rehabilitated roads<br />
- Number of SCs benefiting from heavy <strong>main</strong>tenance<br />
on roads<br />
- Cost of road improvement works<br />
- Sustainability of road improvements<br />
45<br />
100<br />
- CSS*; PPRs<br />
- Idem<br />
- Project financial <strong>report</strong>s; BPWUD<br />
financial <strong>report</strong>s<br />
- Roads’ actual appearance*<br />
O6.1 Road construction equipment provided to<br />
BPWUD<br />
- Type and number of equipment provided - Equipment*; PPRs<br />
A6.1.1 Preparation of specifications for<br />
procurement of road construction<br />
equipment<br />
- Tender and procurement documents - Tender and procurement documents<br />
A6.1.2 Procurement of equipment - Number of replies from sellers<br />
- Procurement files<br />
- Selection process<br />
- Procurement manual; BPWUD KI*<br />
- Timely delivery of equipment<br />
- BPWUD KI*; PPRs<br />
O6.2 Improvement of rural road network and - Correspondence of plans with project objectives<br />
- BPWUD KI*<br />
access roads to SCs is properly planned - Feasibility of plans<br />
A6.2.1 Preparation of the roads<br />
- Programming approach<br />
- Programme preparatory documents;<br />
rehabilitation and <strong>main</strong>tenance<br />
programme<br />
- Roads rehabilitation and <strong>main</strong>tenance programme<br />
BPWUD KI*<br />
- Programme<br />
O6.3 250 km of the existing dry season roads - Length of dry season roads rehabilitated<br />
250 km - BPWUD <strong>report</strong>s; PPRs; Roads’<br />
rehabilitated to RR-30 standard<br />
- Nature of rehabilitation work<br />
actual appearance*<br />
A6.3.1 Preparation of the rehabilitation - Plans drawn<br />
- Plans and budget documents<br />
works<br />
- Budget estimated