21.06.2013 Views

Ethiopia SOCODEP CE - main report - IFAD

Ethiopia SOCODEP CE - main report - IFAD

Ethiopia SOCODEP CE - main report - IFAD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

58<br />

SO5 Relief of livestock health constraints, particularly<br />

with respect to draught animals, trough provision<br />

of veterinary drugs.<br />

- Animal heath situation in the project area - SES*<br />

O5.1 Access to veterinary drugs improved - Availability of veterinary drugs in the project area<br />

- Access to veterinary drugs by animal breeders<br />

- Use of veterinary drugs<br />

- SES*<br />

A5.1.1 Preparation of annual demand - Survey design<br />

- Survey design documents<br />

estimates<br />

- Survey results (data collected and analyzed)<br />

- Survey <strong>report</strong><br />

A5.1.2 Establishment of revolving fund - Volume of the fund established<br />

- PPRs; NBE KI*; CSS*<br />

account held by NBE<br />

- Functioning of the fund<br />

A5.1.3 Distribution of drugs. - Volume and nature of drugs distributed - PPRs; CSS*<br />

SO6 Improve access of rural families to services and<br />

markets by rehabilitating and <strong>main</strong>taining rural<br />

roads.<br />

- Number of SCs benefiting from rehabilitated roads<br />

- Number of SCs benefiting from heavy <strong>main</strong>tenance<br />

on roads<br />

- Cost of road improvement works<br />

- Sustainability of road improvements<br />

45<br />

100<br />

- CSS*; PPRs<br />

- Idem<br />

- Project financial <strong>report</strong>s; BPWUD<br />

financial <strong>report</strong>s<br />

- Roads’ actual appearance*<br />

O6.1 Road construction equipment provided to<br />

BPWUD<br />

- Type and number of equipment provided - Equipment*; PPRs<br />

A6.1.1 Preparation of specifications for<br />

procurement of road construction<br />

equipment<br />

- Tender and procurement documents - Tender and procurement documents<br />

A6.1.2 Procurement of equipment - Number of replies from sellers<br />

- Procurement files<br />

- Selection process<br />

- Procurement manual; BPWUD KI*<br />

- Timely delivery of equipment<br />

- BPWUD KI*; PPRs<br />

O6.2 Improvement of rural road network and - Correspondence of plans with project objectives<br />

- BPWUD KI*<br />

access roads to SCs is properly planned - Feasibility of plans<br />

A6.2.1 Preparation of the roads<br />

- Programming approach<br />

- Programme preparatory documents;<br />

rehabilitation and <strong>main</strong>tenance<br />

programme<br />

- Roads rehabilitation and <strong>main</strong>tenance programme<br />

BPWUD KI*<br />

- Programme<br />

O6.3 250 km of the existing dry season roads - Length of dry season roads rehabilitated<br />

250 km - BPWUD <strong>report</strong>s; PPRs; Roads’<br />

rehabilitated to RR-30 standard<br />

- Nature of rehabilitation work<br />

actual appearance*<br />

A6.3.1 Preparation of the rehabilitation - Plans drawn<br />

- Plans and budget documents<br />

works<br />

- Budget estimated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!