Ethiopia SOCODEP CE - main report - IFAD
Ethiopia SOCODEP CE - main report - IFAD
Ethiopia SOCODEP CE - main report - IFAD
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
59<br />
A6.3.2 Supervision of rehabilitation<br />
works<br />
O6.4 Heavy <strong>main</strong>tenance on 450 km dry season<br />
roads carried out<br />
A6.4.1 Preparation of heavy and routine<br />
<strong>main</strong>tenance works<br />
A6.4.2 Supervision of heavy and routine<br />
<strong>main</strong>tenance works<br />
O6.5 SCs regularly carrying out routine<br />
<strong>main</strong>tenance on the 700 kms of roads<br />
rehabilitated and heavily <strong>main</strong>tained<br />
A6.5.1 Preparation of routine<br />
<strong>main</strong>tenance works<br />
A6.5.2 Supervision of routine<br />
<strong>main</strong>tenance works<br />
- Number of visits to the works<br />
- Rehab supervision <strong>report</strong>s; BPWUD<br />
- Reporting and feed-back process<br />
<strong>report</strong>s; BPWUD KI*<br />
- Length of roads on which heavy <strong>main</strong>tenance has 450 km - BPWUD <strong>report</strong>s; PPRs; Roads’<br />
been carried out<br />
- Nature of heavy <strong>main</strong>tenance works<br />
actual appearance*<br />
- Plans drawn<br />
- Budget estimated<br />
- Plans and budget documents<br />
- Number of visits to the works<br />
- Rehab supervision <strong>report</strong>s; BPWUD<br />
- Reporting and feed-back process<br />
<strong>report</strong>s; BPWUD KI*<br />
- Actual state of the improved roads<br />
- BPWUD <strong>report</strong>s; PPRs; Roads’<br />
- Regularity and nature of <strong>main</strong>tenance<br />
- Cost of <strong>main</strong>tenance<br />
actual appearance*<br />
- Degree of involvement of SCs in <strong>main</strong>tenance<br />
- CSS*<br />
- Maintenance plans - Plans<br />
- Number of visits to the works<br />
- Reporting and feed-back process<br />
- Rehab supervision <strong>report</strong>s; BPWUD<br />
<strong>report</strong>s; BPWUD KI*<br />
Added components with BSF grant funding since 1999 (as of Grant Agreement):<br />
OVI Targets Data sources (star * means data still<br />
Principal objective: enhance social and economic<br />
standards through improved health and nutritional status<br />
of poor rural households in 8 woredas of the <strong>SOCODEP</strong><br />
area<br />
SO7 Reduce the burden of disease in 8 woredas of the<br />
<strong>SOCODEP</strong> area<br />
- Reduction of water borne disease<br />
- Improved nutritional status<br />
- Improved quality and quantity of assets<br />
- Increased social/human capital through<br />
knowledge and technology transfer<br />
- Increased use of safe water and health<br />
services<br />
- Changes in behaviour due to increased<br />
recognition of good health and hygiene<br />
- Changes in water usage<br />
- Improved institutional capacity to provide<br />
water and health services<br />
to be collected by evaluation team)<br />
- Socio-economic survey (SES)*<br />
- Available government health<br />
figures<br />
- PPRs<br />
- Project M&E<br />
- SES*<br />
- Regional Water, Mines and Energy<br />
Development Bureau (RWMEDB)<br />
figures *