[B-TRAC EVALUATION AND IMPACT STUDY] December 10, 2012<br />
movement of traffic, safer movement of traffic etc., Apart from opinion surveys field<br />
visits has been made to various junctions, TMC etc., to collect the relevant data.<br />
3.2 IMPACT OF B-TRAC BASED ON PLANNED AND ACTUAL IMPLEMENTATION<br />
3.2.1 Junction Improvement<br />
Junction Improvement was proposed to be done <strong>for</strong> a total of 500 junctions as per the Strategic<br />
Operations Plan as given below,<br />
a) 125 Junction Improvements to be done in Phase I and Phase II (2007-08)<br />
b) 101 Junction Improvements to be done in Phase III (2008-09)<br />
c) 101 Junction Improvements to be done in Phase IV (2009-2010)<br />
d) 173 Junction Improvements to be done in Phase v (2010-2011)<br />
But Junction improvement was done only <strong>for</strong> 46 junctions under various packages as shown in<br />
the Table 3.1.<br />
Table 3.1: Junction Improvement Actually Done<br />
Sl. No. Package Name of the Junction<br />
1. Package I-4 Junctions a) Karnataka Bhavan Circle<br />
b) BEL Road – Devasandra Junction<br />
c) Lalbagh West Gate Junction<br />
d) Ramakrishan Ashram Circle<br />
2. Package II-7 Junctions a) Dickenson-Compensation Road Junction<br />
b) Gangadhar Chetty-Compensation Road<br />
Junction<br />
c) Sadanandanagar – NGEF Junction<br />
d) Basaveshwara Circle<br />
e) Janatha Dal Circle<br />
f) RRMR – Vittal Mallya Hospital<br />