[B-TRAC EVALUATION AND IMPACT STUDY] December 10, 2012<br />

movement of traffic, safer movement of traffic etc., Apart from opinion surveys field<br />

visits has been made to various junctions, TMC etc., to collect the relevant data.<br />

3.2 IMPACT OF B-TRAC BASED ON PLANNED AND ACTUAL IMPLEMENTATION<br />

3.2.1 Junction Improvement<br />

Junction Improvement was proposed to be done <strong>for</strong> a total of 500 junctions as per the Strategic<br />

Operations Plan as given below,<br />

a) 125 Junction Improvements to be done in Phase I and Phase II (2007-08)<br />

b) 101 Junction Improvements to be done in Phase III (2008-09)<br />

c) 101 Junction Improvements to be done in Phase IV (2009-2010)<br />

d) 173 Junction Improvements to be done in Phase v (2010-2011)<br />

But Junction improvement was done only <strong>for</strong> 46 junctions under various packages as shown in<br />

the Table 3.1.<br />

Table 3.1: Junction Improvement Actually Done<br />

Sl. No. Package Name of the Junction<br />

1. Package I-4 Junctions a) Karnataka Bhavan Circle<br />

b) BEL Road – Devasandra Junction<br />

c) Lalbagh West Gate Junction<br />

d) Ramakrishan Ashram Circle<br />

2. Package II-7 Junctions a) Dickenson-Compensation Road Junction<br />

b) Gangadhar Chetty-Compensation Road<br />

Junction<br />

c) Sadanandanagar – NGEF Junction<br />

d) Basaveshwara Circle<br />

e) Janatha Dal Circle<br />

f) RRMR – Vittal Mallya Hospital<br />

<strong>CiSTUP</strong> 28