[B-TRAC EVALUATION AND IMPACT STUDY] December 10, 2012<br />
6. Package VI – 5 Junctions a) JD Mara Junction<br />
b) Bilekhalli Junction<br />
c) Arakere Junction<br />
d) Wilson Garden 10 th Garden Junction<br />
e) Madhu Petrol Bank Junction<br />
7. Package VII – 7 Junctions a) St. Johns Junction<br />
b) R.T. Nagar Junction<br />
c) Saunders Road Junction<br />
d) Haines Junction<br />
e) MM Road and Tannery Road Junction<br />
f) Place Cunningham Junction<br />
g) Miller Cunningham Junction<br />
If junction improvements had been done <strong>for</strong> all the 500 junctions as identified in the Strategic<br />
Operations Plan, the movement of traffic would have been smoother in these junctions. Figure<br />
3.1 and Figure 3.2 shows some of the junctions where junction improvement was done. Still<br />
more work needs to be done under junction improvement and more junctions which are<br />
unchannelized should be channelized.<br />