[B-TRAC EVALUATION AND IMPACT STUDY] December 10, 2012<br />
3) Two hundred surveillance/monitoring cameras and seven en<strong>for</strong>cement cameras will be<br />
installed at selected junctions and road stretches. Two interceptors and three crashlabs<br />
will be acquired.<br />
4) Signal improvements with appropriate detectors, control boxes, software etc., will be<br />
installed at <strong>for</strong>ty five junctions. Out of these, five are existing signals.<br />
5) Five corridors will be taken up <strong>for</strong> improvements which will include signal interlinking<br />
<strong>for</strong> minimizing journey times.<br />
6) Forty five pedestrian actuated light signals are proposed. Traffic police will identify the<br />
areas where they have to be installed.<br />
7) Variable Message Signs (VMS) are proposed to be installed in fifteen locations.<br />
8) The construction work and equipping of the TMC will be continued.<br />
9) The works on the construction of a new permanent traffic training institute will be<br />
completed and equipping the TTI will commence.<br />
10) A total sum of Rs. 88.59 crores have been earmarked <strong>for</strong> this Phase 4.<br />
Phase 5 Improvements<br />
1) A total of 173 junctions are to be improved by providing better geometrics, providing<br />
channelizing islands, intersection markings etc., Out of these 62 junctions have already<br />
existing signal systems.<br />
2) Seventy kilometers of arterial roads, fifty eight kilometers of sub-arterial roads and<br />
eighty kilometers of collector streets will be improved with road markings, sign boards,<br />
pedestrian barriers etc.,<br />
3) Two hundred surveillance/monitoring and seven en<strong>for</strong>cement cameras will be installed<br />
at selected junctions and road stretches.<br />
4) Signal improvements with appropriate detectors, control boxes, software etc., will be<br />
installed at fifty junctions.<br />
5) The remaining six corridors will be taken up <strong>for</strong> improvements which will include signal<br />
interlinking <strong>for</strong> minimizing journey times.<br />
6) Vidhana Soudha area will be taken up <strong>for</strong> installing Area Traffic Control System.<br />
<strong>CiSTUP</strong> 6