[B-TRAC EVALUATION AND IMPACT STUDY] December 10, 2012<br />
pedestrian barriers etc.,<br />
Phase IV: Seventy kilometers of arterial roads,<br />
fifty kilometers of sub-arterial roads and eighty<br />
kilometers of collector streets will be improved<br />
with road markings, sign boards, pedestrian<br />
barriers etc.,<br />
Phase V: Seventy kilometers of arterial roads, fifty<br />
eight kilometers of sub-arterial roads and eighty<br />
kilometers of collector streets will be improved<br />
with road markings, sign boards, pedestrian<br />
barriers etc.,<br />
The road marking has helped in systematic movement of traffic as given below,<br />
1) The lane markings have helped the traffic to move in proper lanes.<br />
2) The centerline marking with cats eye has helped the drivers to see the centerline during<br />
night times.<br />
3) The edge line markings have helped the traffic to clearly see the edge of the road.<br />
4) The pedestrian markings have helped in the safe crossing of pedestrians.<br />
But still a lot of road markings needs to be done because there are many roads where there are<br />
no markings in different parts of the Bangalore and it is very dangerous. In order to effectively<br />
en<strong>for</strong>ce lane discipline, we need to make sure that all our roads have proper lane markings.<br />
Nil<br />