Annual Report 2005 - Tenaris
Annual Report 2005 - Tenaris
Annual Report 2005 - Tenaris
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Confab Equipamentos: investments in modernizing the welding process and buying ultra modern instruments<br />
for non-destructive tests, such as TOFD, Phased Array and Digital Radiography.<br />
.<br />
the low levels of recent years due to lack of funding<br />
for infrastructure works and a lack of regulatory<br />
definition in the sector.<br />
In the overseas market, oil and gas prices remained<br />
high, driving prospecting and drilling activities<br />
and leveraging demand for pipes in all markets.<br />
Especially worthy of note among the company's<br />
export activities were the sales to Argentina, where<br />
the existing gas pipeline network infrastructure<br />
was amplified through the construction of loops.<br />
Outlook<br />
At the end of the year there was a downturn in<br />
the demand for pipes for regional products, mainly<br />
due to the delay in the definition of the second<br />
stretch of the GASENE (Cacimbas-Catu) pipeline,<br />
as well as in Gasfor II and the new loops for the<br />
Argentinean gas pipelines.<br />
The outlook for 2006 continue to be good, as<br />
definitions are expected for the GASENE project<br />
in Brazil and the Loops projects in Argentina.<br />
Export sales are expected to account for a larger<br />
proportion of overall welded pipe sales.<br />
The deficit in gas transportation capacity persists<br />
in Brazil, mainly in the northeast of the country,<br />
where there is significant demand from thermoelectric<br />
power stations. In the south of the country,<br />
where gas is in demand for industrial purposes,<br />
amplification of the gas pipeline network is expected<br />
but depends on definitions involving Bolivia.<br />
With respect to petroleum transportation, Petrobras<br />
has initiated the purchase process for the PDET<br />
offshore project in the Campos basin.<br />
In the mining sector, we have received an order<br />
from Samarco for the construction of a new 345 km<br />
31. <strong>Annual</strong> <strong>Report</strong> <strong>2005</strong>