Annual Report 2005 - Tenaris
Annual Report 2005 - Tenaris
Annual Report 2005 - Tenaris
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PRA-1 is a Petrobras project aimed<br />
at making Brazil self-sufficient in<br />
petroleum. Confab Equipamentos<br />
participated in this challenge with<br />
the production of jacketed components<br />
for the PRA-1 petroleum<br />
exploration platform, projected to<br />
increase deep water production,<br />
a part of the Campos Basin Petroleum<br />
Flow and Treatment plan (PDET).<br />
Confab Equipamentos was subcontracted<br />
by Techint Engineering,<br />
responsible for detail engineering,<br />
building and assembly, and for manufacturing<br />
knots, piping, casing and<br />
supports, among other accessories.<br />
7 thousand<br />
tons for PRA-1 .<br />
34. <strong>Tenaris</strong>Confab<br />
The Autonomous Pumping Platform,<br />
known as PRA-1, will enable the<br />
transportation of the oil and natural<br />
gas produced by platforms located<br />
at a depth of more than 1000<br />
meters. It is a fixed platform that<br />
will be installed 115 km from<br />
the Rio de Janeiro coast at a depth<br />
of 105 meters. It will have a daily<br />
capacity to pump and transfer<br />
818,000 barrels of petroleum and 1.9<br />
million cubic meters of natural gas.<br />
Project PRA-01<br />
Bacia de Campos<br />
Petrobras<br />
Confab Equipamentos supplied 7 thousand tons for the PRA-1<br />
Location<br />
. Customer<br />
. Project description<br />
Autonomous Pumping Platform.