Sr.<br />

No.<br />

<strong>List</strong> <strong>of</strong> <strong>Cases</strong> <strong>to</strong> <strong>be</strong> <strong>submitted</strong> <strong>be</strong>fore <strong>2nd</strong> <strong>Consent</strong> <strong>Appraisal</strong> Committee<br />

Name & Address Capital<br />

Investment<br />

Re<strong>submitted</strong> Agenda<br />

1 M/s. EON Hinjewadi Infrastructure Pvt.<br />

Ltd., Hotel Courty Yard, S. No. 19/2 and<br />

20/1-9, Rajiv Gandhi Infotech Park,<br />

Hinjewadi, Tal. Mulshi, Dist. Pune<br />

2 Hotel Leela Kempiniski Sahar Mumbai--<br />

59, Andheri Kural Road , Andheri Sahar<br />

Mumbai<br />

3 M/s. Wardha Power Ltd., Phase-II <strong>of</strong> 270<br />

MW, MIDC warora, Chandrapur<br />

4 Thyssenkrupp Engine Components India<br />

Pvt. Ltd., G No.392, A/p- Gondhe, Vill-<br />

Wadivarhe, Tal- Igatpuri, Dist - Nashik<br />

5 M/s. Western Coal Fields Ltd., Umred<br />

Open Cast Project, Tal- Umred, Dist -<br />

Nagpur<br />

6 WCL Mungoli Opencast Mine, Po.<br />

Sakhara (Kolgaon), Mungoli Sub Area,<br />

Dist. Yavatmal<br />

7 Mahanidra and Mahindra Ltd., F-1 & 7<br />

MIDC Hingna, Nagpur<br />

8 Gupta Energy Ltd., Kh No.89, Usgaon,<br />

Chandrapur<br />

9 M/s.Posco Maharashtra Steel Pvt. Ltd.,<br />

Plot No. C-1, MIDC Bhagad, Tal-<br />

Mangaon, Dist - Raigad<br />

10 M/s.Posco Maharashtra Steel Pvt. Ltd.,<br />

Plot No. C-1, MIDC Bhagad, Tal-<br />

Mangaon, Dist - Raigad<br />

11 Tata Steel Ltd., (Cold Rolling Coils &<br />

Sheets) Plot No.S-76, MIDC Tarapur,<br />

DistThane<br />

12 M/s. Maharashtra State Power<br />

Generation Co. Ltd., Nashik Thermal<br />

Power Station, P.O. Eklahare, Dist.<br />

Nashik<br />

13 M/s.Balaji Amines(power plant)<br />

Tamalwadi, Osmanabad®<br />

14 M/s. Mumbai International Airport Pvt<br />

Ltd, Chhatrapati Shivaji International<br />

Airport , Terminal 1B, 1st floor ,<br />

Santacruz (E), Mumbai- 400099<br />

15 M/s. Neptune Venture & Developers Pvt<br />

Ltd ( Magnet Mall),<br />

Plot <strong>be</strong>raing CTS no: 372,372/1 <strong>to</strong> 65,<br />

LBS Marag, Village: Kanjur, Tal: Kurla ,<br />

Mumbai<br />

16 Cadbury India Ltd A/p. Induri, Tal- Maval,<br />

Dist- Pune<br />

Applied<br />

For<br />

Section Page No. Remarks<br />

102.08 Crs. 1st Operate AS(T) 1 <strong>to</strong> 23<br />

541.90 Crs. Renewal AS(T) 24-47<br />

1339.0 Crs Renewal JD(APC) 48-62<br />

155.52 Crs 1st operate JD(APC) 63-79<br />

168.43 Crs Renewal JD(APC) 80-104<br />

110.81 Crs. Renewal<br />

(Expansion)<br />

JD(APC) 105-133<br />

114.00 Crs 1st Operate<br />

(Expansion)<br />

JD(APC) 134-142<br />

520.87 Crs 1st Operate JD(APC) 143-156<br />

894.16 Crs 1st operate JD(APC) 157-173<br />

949.58 Crs Amendment JD(APC) 174-194<br />

103.76 Crs Establish<br />

(Expansion)<br />

JD(APC) 195-206<br />

700.89 Crs. Renewal JD(APC) 207-226<br />

118.11 Crs Renewal JD(PAMS) 227-244<br />

447.13 crs 1st Operate RO(HQ) 245-264<br />

455.66 crs 1st Operate RO(HQ) 265-275<br />

270.1 Crs Establish<br />

(Expansion)<br />

JD(WPC)<br />

276-305


17 Cadbury India Ltd A/p. Induri, Tal- Maval,<br />

Dist- Pune<br />

18 Ballarpur Industries ltd, ( Asthi) Tq-<br />

Charmorshi, Dist- Gadchiroli.<br />

19 Brin<strong>to</strong>n Carpet Asia Pvt. Ltd, Vill- Urvade,<br />

Tq- Mulshi, Dist- Pune.<br />

20 Bombay Rayon FashionLtd. Plot No. G-<br />

95,MIDC Tarapur, Tq- Palghar, Dist-<br />

Thane<br />

21 Ruchi Soya industries Ltd. Patalganga.<br />

Sarvoli- Kharpada Road, Isam<strong>be</strong>,<br />

Khalapur, Raigad<br />

22 M/s. Bhima SSK Ltd., Madhukarnagar,<br />

Patas, Tal. Daund, Dist. Pune<br />

23 M/s. B S Ispat ( Sprong Iron Plant) 101 &<br />

190, Vill- Salori Yenasa, Chandrapur<br />

24 M/s. Wockhardt Hospitals Ltd., Plot No.<br />

1877, Dr. Anand Rao Nair Marg, Near<br />

Police Stn. Byculla, Mumbai-<br />

Fresh Agenda<br />

25 Classic Citi Investments Pvt. Ltd. 36/3B,<br />

Vill. Ghorpadi, Tal. Havelli, Koregaon,<br />

Park, Pune -<br />

26 Nirmal Lifestyles Ltd., (Hotel & Shopping<br />

Mall), Vill. Nahur, Mulund-W, Mumbai-<br />

27 M/s. Raddisson Blu ( 5 Star Hotel),<br />

Unit Of Bestech Hospitalities Pvt. Ltd.,<br />

KH. No. 32/2-3, 37/1-C, Mauza-<br />

Somalwada. Tal. Dist. Nagpur -<br />

28 M/s. Western Coal Fields Ltd., Ukni<br />

Deep Open Cast Mine, Vill- Ukho, Po-<br />

Bhallar, Tal- Wani Dist - Yavatmal<br />

29 M/s. Bridges<strong>to</strong>ne India Pvt. Ltd., (Phase-<br />

II), Plot No. A-43, MIDC Chakan Phase-II,<br />

Tal- Khed, Dist -Pune<br />

30 M/s. Precision Au<strong>to</strong>mation & Robotics (I)<br />

Ltd., G No.463 A, 463 B, 464, A/p-<br />

Dhangarwadi. Tal- Khandala, Dist -<br />

Satara<br />

31 AAM India Mfg Coproration Pvt. Ltd., Gat<br />

No. 787 & 788, Hingan, Tal- Parner,<br />

Ahmednagar<br />

32 M/s. JSW Steel Ltd., Plot no. B-6, MIDC<br />

Tarapur, Navapur Road, Boisar, Tal-<br />

Palghar, Thane<br />

33 M/s. Force Mo<strong>to</strong>rs Ltd., Mumbai-Pune<br />

Road, Akurdi, Pune<br />

34 M/s. Bajaj Au<strong>to</strong> Ltd., Plot No. A-1, MIDC<br />

Chakan, Mahalunge, Tal- Khed, Dist<br />

Pune<br />

270.1 Crs Establish<br />

(Expansion)<br />

JD(WPC)<br />

310.2 Crs Renewal JD(WPC) 306-323<br />

110.7 Crs Establish<br />

(Expansion)<br />

JD(WPC) 324-346<br />

263.8 Crs 1st Operate JD(WPC) 347-366<br />

223.81 Crs 1st Operate<br />

(Expansion)<br />

with<br />

Amalgamati<br />

on<br />

JD(WPC) 367-384<br />

147.48 Crs. Renewal JD(WPC) 385-406<br />

158.50 Crs 1st Operate JD(APC) 407-415<br />

208.00 Crs. Establish AS(T) 416-443<br />

271.05 Crs. Renewal AS(T) 444-456<br />

652.25 Crs Establish<br />

(Expansion)<br />

AS(T) 457-472<br />

146.08 Crs. Renewal AS(T) 473-480<br />

319.96 Crs Establish<br />

(Expansion)<br />

JD(APC) 481-489<br />

525.56 Crs Establish JD(APC) 490-497<br />

133.8 Crs Establish<br />

(Expansion)<br />

14072 Crs Establish<br />

(Expansion)<br />

JD(APC) 498-505<br />

JD(APC) 506-513<br />

672.61 Crs Renewal JD(APC) 514-524<br />

670.14 Crs Renewal JD(APC) 525-533<br />

431.16 Crs Renewal JD(APC) 534-544


35 M/s. Apple Sponge and Power Ltd., C-4,<br />

Five Star MIDC Indl. Area, Kagal,<br />

Kolhapur<br />

36 M/s. Can Pack India Pvt. Ltd., H-14/1,<br />

MIDC Waluj, Dist - Aurangabad<br />

37 Lloyds Metals & Energy Ltd., Plot No. A-<br />

1&2, MIDC Ghugus, Dist. Chandrapur<br />

38 Cummins Technologies India Ltd., B-3/1,<br />

Phaltan SEZ Ind. Area, Tal. Phaltan, Dist.<br />

Satara<br />

39 M/s. Mazgaon Dock Ltd, Dock Yard<br />

Road, Mazgaon Mumbai -10<br />

40 M/s. Reliance Infocomm Infrastructure<br />

Pvt Ltd, TTC Industrial Area DAKC<br />

Koparakharine , Navi Mumbai<br />

41 M/s. Adhiraj Construction Pvt Ltd ,<br />

MMRDA ( Rental Housing Scheme)<br />

residential <strong>to</strong>wnship project – Adhiraj<br />

Upscale , Plot Survey no:<br />

64,67,68,69,70,71,72,76,77,86,88,89,90,<br />

91&99, vill: Rohinan , Tal Panvel Dist :<br />

Raigad<br />

42 M/s. Kanhan river Project ( Kochi<br />

Barrage ), Vill: Kochi, Tal: Saoner , Dist:<br />

Nagpur<br />

43 Reliance Industries Ltd, Vill- Dahali, Ta-<br />

Mouda, Dist- Nagpur.<br />

44 Lokmangal Mauli Industries Ltd. Gat<br />

No.67,68,69,70,80,Vill- L0hara ( Khurd),<br />

Tq- Lohara, Dist- Osmanabad<br />

45 Dr. Babasaheb Am<strong>be</strong>dkar SSK Ltd.<br />

Arvindnagar, Post- Keshgaon, Dist-<br />

Osmanabad.<br />

46 Urjankur Shree Tatyasaheb Kore Warana<br />

Power Co. Ltd. Gat No. 630, A/p.<br />

Warananagar, Kolhapur.<br />

47 Eurotex Industries And Exports Limited,<br />

Plot No. E-23,M.I.D.C Gokul Shirgaon,<br />

Dist- Kolhapur.<br />

48 Tessitura Monti India(P) Ltd ,Gat No. -<br />

147, Vill - Tamgaon, Karveer, Dist-<br />

Kolhapur.<br />

49 Raymond Zambaiti Pvit LtdPlot No-T-<br />

1,Five Star M.I.D.C Kagal-Hatkanangale<br />

130.54 Crs Renewal JD(APC) 545-554<br />

425.0 Crs Establish JD(APC) 555-561<br />

498.55 Crs. Renewal<br />

with<br />

Amalgamati<br />

on<br />

JD(APC) 562-586<br />

500.00 Crs. Establish JD(APC) 587-594<br />

169.18 Crs Renewal RO(HQ) 595-603<br />

1886.5035<br />

Crs<br />

Renewal RO(HQ) 604-619<br />

900.00 Crs Establish RO(HQ) 620-632<br />

262.25.Crs Establish RO(HQ) 633-640<br />

225.47 Cr 1st Operate<br />

(Expansion)<br />

JD(WPC) 641-647<br />

282.16 Cr Establish JD(WPC) 648-654<br />

157.75 Cr Establish<br />

(Expansion)<br />

JD(WPC) 655-661<br />

281 Cr 1st Operate JD(WPC) 662-669<br />

176.14 Cr Renewal JD(WPC) 670-676<br />

239.97 Cr Renewal<br />

with<br />

amalgamatio<br />

187.93 Cr Renewal<br />

with 1st<br />

consent <strong>to</strong><br />

operate<br />

(Expansion)<br />

n<br />

JD(WPC) 677-684<br />

JD(WPC) 685-691


50 M/s.Shri Dudhganga Vedganga SSK Ltd,<br />

Bidri(Mouninagar),Tal-Kagal,<br />

Dist- Kolhapur<br />

51 M/s. Lenzing Modi fibres, Plot No-M-1 &<br />

M-2 Additional MIDC Patalganga,Raigad.<br />

52 M/s. Sandoz Pvt Ltd , Plot No-L-1 MIDC<br />

Mahad dist-Raigad.<br />

53 M/s.Jublient Life Sciences,Vill- Nimbhut<br />

Nira,Tal- Baramati,Dist-Pune<br />

Review Items<br />

1 Chevrolet Sales India Pvt. Ltd., Plot No. A-<br />

16, MIDC Talegaon, Nr Floriculture Park,<br />

Tal- Maval, Dist - Pune<br />

2 JSW Steel Ltd., B-7/1, MIDC Tarapur,<br />

Tal. Palghar, Dist. Thane<br />

3 M/s. Mukund Ltd., Thane Belapur Road,<br />

Post <strong>of</strong>fice Kalwa, Thane<br />

4 M/s. Bilt Graphics Paper Products Ltd.,<br />

Po-Ballarpur, Dist - Chandrapur<br />

5 M/s. Lloyds Steel Industries Ltd., (Steel<br />

Division), Bhugaon road, Dist - Wardha<br />

6 M/s. Avantha Power & Infrastructure Ltd.,<br />

Ballarpur , Tal- Ballarpur, Dist -<br />

Chandrapur<br />

7 M/s. Neeljay OCM, WCL, Wani Area, Po-<br />

Bellora, Tal- Wani, Dist - Yavatmal<br />

8 Status <strong>of</strong> revocation <strong>of</strong> consent as on<br />

26.04.2012 - 6 cases<br />

9 Status <strong>of</strong> <strong>Consent</strong> granted under Au<strong>to</strong><br />

Renewal Scheme - 2 cases<br />

184.08 Cr Renewal JD(WPC) 692-698<br />

827 Cr Amendment<br />

(Establish)<br />

JD(PAMS) 699-715<br />

120.0 Cr Establish<br />

(Expansion)<br />

JD(PAMS) 716-725<br />

307.8 Cr Renewal JD(PAMS) 726-739 Resubmiss<br />

with<br />

amalgamatio<br />

n<br />

ion<br />

76.00 Cr 1st Operate<br />

Discussed in<br />

CC<br />

91.64 Crs. Renewal<br />

Discussed in<br />

CC<br />

521.53 Cr Amendemen<br />

- Forfeiture <strong>of</strong><br />

BG<br />

211.59 Cr Forfeiture <strong>of</strong><br />

BG<br />

256.61 Cr Forfeiture <strong>of</strong><br />

BG<br />

t<br />

JD(APC) 740-746<br />

JD(APC) 747-756<br />

JD(APC) 757-772<br />

JD(APC) 773-780<br />

JD(APC) 781-799<br />

JD(APC) 800-809<br />

195.91 Cr Non<br />

submission<br />

<strong>of</strong> Board<br />

Resolution<br />

JD(APC) 810-828<br />

- - JD(APC) 829-833<br />

- - JD(APC) 834


<strong>List</strong> <strong>of</strong> Direction issued in respect <strong>of</strong> CAC cases by respective Regional<br />

Officers as on 21.05.2012<br />

Sr No Regional<br />

Office<br />

1 Nagpur Abhijeet MADC S. No. 22(P) & 23(P),<br />

Nagpur Energy Pvt. SEZ at MIHAN area,<br />

Ltd.<br />

Tal and Dist. Nagpur.<br />

2 Nagpur Dinshaws Dairy<br />

Foods Ltd.<br />

Industry Name Address Directions<br />

K-41,42, MIDC,<br />

Butibori, Dist. Nagpur<br />

Interim Direction<br />

dtd. 19.07.2011<br />

Proposed<br />

Direction dtd.<br />

03.08.2011<br />

3 Nagpur Mahalaxmi TMT Chikni, Dist. Wardha Closure Direction<br />

Pvt. Ltd.<br />

dtd. 18.03.2012<br />

4 Nagpur ERA BUILDSYS D-3 MIDC UMRED Proposed<br />

LTD.,<br />

NAGPUR<br />

Direction dtd.<br />

13.11.2011<br />

5 Nagpur Hindalco Industries Hindalco Industries Closure Direction<br />

Ltd. (Formerly Ltd., Vill. Dahali, Tq. dtd. 19.02.2012<br />

known Pennar Alu. Mauda, Dist. Nagpur<br />

Co. Lt)<br />

6 Nagpur Indo Rama<br />

Synthetics y (I) ( ) Ltd.<br />

power plant<br />

7 Nagpur Indrajit<br />

Infrastructure Pvt.<br />

Ltd. (Phase- I & II),<br />

Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012<br />

CAC Review item No. -10<br />

Indo Rama<br />

Synthetics y (I) ( ) Ltd., , A-<br />

31,A-31P,A-31P/1, A-<br />

40 <strong>to</strong> A-45, MIDC<br />

Butibori Nagpur<br />

Barbadi, Tq. Dist.<br />

Wardha<br />

8 Nagpur Ispat Industries Ltd. Ispat Industries<br />

Ltd.,plot no.A-<br />

10/1,MIDC Indl.<br />

area,kalmeshwar,dist-<br />

Nagpur<br />

9 Nagpur Mahalaxmi TMT<br />

Private Ltd<br />

10 Nagpur Morarjee Textiles<br />

Industries Ltd.<br />

Restart Direction<br />

dtd. 01.02.2011<br />

Proposed<br />

Direction dtd.<br />

15.03.2011<br />

Proposed<br />

Direction dtd.<br />

25.08.2012<br />

C-2, Deoli MIDC, Closure Direction<br />

Wardha,<br />

dtd. 18.03.2012<br />

Plot No. G-2, MIDC, Interim Direction<br />

Butibori, Dist. Nagpur dtd. 11.02.2010<br />

11 Nagpur Reliance Industries Dahali, Tq. Mouda,<br />

Ltd.<br />

Dist. Nagpur<br />

12 Nagpur Shree Virangana Ukerwahi, Tq.Umred,<br />

Steel Ltd., Dist. Nagpur<br />

13 Nagpur Sunflag Iron and<br />

Steel, Tal- Mohadi<br />

14 Nagpur Uttam Galva<br />

Metallics Ltd.<br />

Interim Direction<br />

dtd. 19.12.2011<br />

Interim Direction<br />

dtd. 12.03.2010<br />

Dist - Bhandara Interim Direction<br />

dtd. 07.03.2012<br />

Barbadi,<br />

Interim Direction<br />

Tq. Dist. Wardha dtd. 16.09.2011


15 Nagpur Western Coalfields<br />

Ltd.(WCL)<br />

Umred Open Cast<br />

Project, Tal.Umred,<br />

Dist.Nagpur<br />

16 Chandrapur ACC Ltd P.O-Cement<br />

Nagar,Tq-<br />

Ghugus,Distt-<br />

Chandrapur<br />

Closure Direction<br />

dtd. 19.04.2012<br />

Closure Direction<br />

dtd. 04.12.2010<br />

17 Chandrapur CSTPS Chandrapur Proposed<br />

Direction dtd.<br />

18 Chandrapur Murli Industries Village Naranda,Tq-<br />

Korpana,Distt-<br />

19 Chandrapur SHREE SIDHBALI<br />

ISPAT LTD<br />

20 Chandrapur Bilt Graphics Paper<br />

Product Ltd.<br />

21 Chandrapur Wardha Power<br />

Company Ltd.<br />

22 Mumbai Hindustan<br />

UniLever Ltd.<br />

Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012<br />

Chandrapur<br />

C-2 & 3 MIDC<br />

TADALI,CHANDRAP<br />

UR<br />

Ballarpur,Distt-<br />

Chandrapur<br />

23.08.2010<br />

Interim Direction<br />

dtd. 22.11.2011<br />

Interim Direction<br />

dtd. 15.11.2010<br />

Interim Direction<br />

dtd. 03.01.2012<br />

Tq. Warora, Distt. Interim Direction<br />

Chandrapur<br />

dtd. 20.05.2011<br />

Research Centre Restart Direction<br />

Chakala, Andheri(E), dated 22.2.2012<br />

Mumbai.<br />

23 Mumbai India Bulls Real 612,613,India Bulls Closure Direction<br />

Estate pvt.Ltd. Lower Parel Divisin<br />

Elphsi<strong>to</strong>n Mill<br />

Senapati Bapat<br />

Road marg., Mumbai-<br />

13<br />

dated 6.6.2011<br />

24 Mumbai Mumbai Port Trust Port House,Shoorji Interim Direction<br />

Vallabhdas Marg,<br />

Ballard Estate<br />

dated 1.2.2011<br />

25 Mumbai Magus Estates & 114, Dr. E Moses Interim Direction<br />

Hotels Pvt. Ltd., Road, Worli, Mumbai- dated 27.1.2012<br />

018<br />

26 Mumbai Mumbai<br />

1st floor, terminal 1B, Interim Direction<br />

International Airport santa Cruz, Mumbai<br />

Pvt. Ltd.<br />

Chhatrapati shivaji<br />

international airport<br />

dated 06.1.2012<br />

27 Mumbai CEAT Ltd Off. LBS Marg<br />

Bhandup (W)<br />

28 Nashik Jindal Saw Ltd, A-50 ,60 MIDC<br />

Malegaon Tal-Sinner,<br />

Dist-Nasik<br />

29 Pune Kisanveer SSK , A/p-Kisanveernagar,<br />

Bhuinj, Wai, Dist-<br />

30 Pune Lokmangal Agro<br />

industries<br />

Satara<br />

A/p- Bibi Darphal,<br />

Tal. N.Solapur, Dist.<br />

Solapur<br />

Proposed<br />

Directions dated<br />

19.4.2010<br />

Interm Direction<br />

dtd-30/4/2010<br />

Interm Direction<br />

dtd-31/3/2011<br />

Interm Direction<br />

dtd-19/3/2012


31 Pune Privilege Industries<br />

Limited(Distillery<br />

Division<br />

32 Pune Sona Alloys Pvt.<br />

Ltd.<br />

Plot No.B-1,MIDC<br />

Lonand,Tal-<br />

Khandala,Dist-Satara<br />

Plot No. C-1, MIDC<br />

Area, A/p. Lonand,<br />

Tal. Khandala, Dist.<br />

Satara<br />

33 Pune Atlas Copco (i) Ltd Mumbai Pune Road,<br />

Dapodi, Dist-Pune<br />

34 Pune Cipla Ltd;D-7, MIDC<br />

Ind.Area,Kurkumbh,<br />

Tal.Daund,Dist.Pune<br />

35 Pune Emcure<br />

Pharmaceutical<br />

Ltd,<br />

36 Pune Exide Industries<br />

Ltd.<br />

37 Pune Sahakar Maharshi<br />

Shankarrao Mohite<br />

Patil SSK Ltd.<br />

38 Pune Sahakar Maharshi<br />

Shankarrao Mohite<br />

Patil SSK Ltd.<br />

39 Pune Sahakar Maharshi<br />

Shankarrao Mohite<br />

Patil SSK<br />

Ltd(Distillery).<br />

40 Pune Shree Pandurang<br />

SSK Ltd.<br />

(Distillery)<br />

41 Pune Shree Pandurang<br />

SSK Ltd.<br />

(Distillery)<br />

42 Pune Sidhnath Sugar<br />

Mills Ltd. (Sugar &<br />

Co- Gen Plant)<br />

Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012<br />

Plot No.P-2,IT-BT<br />

Park,Phase-II,MIDC<br />

Hinjewadi,<br />

Tal.Mulshi,Dist.Pune<br />

D-2,MIDC<br />

Chinchwad.<br />

At.Shankarnagar,<br />

Akluj, Tal-Malshiras.<br />

At.Shankarnagar,<br />

Akluj, Tal-Malshiras.<br />

At.Shankarnagar,<br />

Akluj, Tal-Malshiras.<br />

A/P Shreepur, Tal-<br />

Malshiras Dist--<br />

Solapur<br />

A/P Shreepur, Tal-<br />

Malshiras Dist--<br />

Solapur<br />

A/p – Tirhe, Tal.<br />

N.Solapur, Dist.<br />

Solapur<br />

43 Pune SKF India Ltd. S. No. 159 <strong>to</strong> 162,<br />

169,188,<br />

Chinchawad, Dist.<br />

44 Pune Yashwantrao<br />

Mohite Krishna<br />

SSKRethare (Bk),<br />

45 Pune Kirloskar oil<br />

Engines Ltd,<br />

Pune<br />

Tal. Karad, Dist.:<br />

Satara<br />

Laxmanrao Kirloskar<br />

Road Pune<br />

Interm Direction<br />

dtd-30/11/2011<br />

Interm Direction<br />

dtd-30/11/2011<br />

Proposed<br />

Direction<br />

13/03/2012<br />

Proposed<br />

Direction<br />

15/11/2011<br />

Proposed<br />

Direction<br />

15/11/2011<br />

Proposed<br />

Direction<br />

14/03/2012<br />

Proposed<br />

Direction<br />

24/06/2011<br />

Proposed<br />

Direction<br />

24/06/2011<br />

Proposed<br />

Direction<br />

29/02/2012<br />

Proposed<br />

Direction<br />

29/02/2012<br />

Proposed<br />

Direction<br />

29/02/2012<br />

Proposed<br />

Direction<br />

29/02/2012<br />

Proposed<br />

Direction<br />

14/03/2012<br />

Proposed<br />

Direction<br />

29/02/2012<br />

Proposed<br />

Direction<br />

13/03/2012


46 Kolhapur Gharda Chemicals<br />

Ltd<br />

47 Kolhapur JSW Jaigad Port<br />

Ltd<br />

Plot No-D-1/2,B-<br />

1/7,MIDC Lote<br />

Parshuram,Tal-Khed<br />

A/p--<br />

Jaigad,Dhamankhol<br />

Bay,Tal-Dust-<br />

Ratnagiri<br />

48 Kolhapur USV Limited B-1/8,M.I.D.C Lote<br />

Parshuram,Tal-Khed<br />

49 Kolhapur Oswal F.M.<br />

Hammerle Textiles<br />

Ltd<br />

50 Kolhapur Raymond Zambaiti<br />

Kagal -Hatkanangale<br />

Five Star<br />

Closer Direction<br />

28/03/2012<br />

Proposed<br />

Direction<br />

19/04/2012<br />

Proposed<br />

Direction<br />

07/01/2010<br />

Interim Direction<br />

dtd-07/05/2010<br />

M.I.D.C,Kagale<br />

T-1 Five star MIDC Interim Direction<br />

pvt Ltd,<br />

Kagal Kolhapur dtd-30/05/2010<br />

51 Kolhapur Hemarus<br />

gut no. 76, Chenati, Restart Order dtd-<br />

Technologies ltd. Tal-Chandgad, Dist-<br />

Kolhapur<br />

19/01/2011<br />

52 Aurangabad Bajaj Au<strong>to</strong> Limited Plot No. A-1, MIDC Interim Direction<br />

Waluj<br />

dtd. 18.10.2010<br />

53 Aurangabad Balkrishna B-66, MIDC, Waluj, Interim Direction<br />

Industries Ltd. Aurangabad dtd. 19.10.2010<br />

54 Aurangabad Terna SSK Ltd., Vill:- Dhoki, Tal. & Interim Direction<br />

Dist. Osmanabad dtd. 09.02.2011<br />

55 Aurangabad Varroc Engineering Waluj, Dist - Interim Direction<br />

Pvt. Ltd.<br />

Aurangabad dtd. 18.10.2010<br />

56 Aurangabad Videocon<br />

Industries Ltd..<br />

57 Kalyan Gharda<br />

Chemicals,<br />

Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012<br />

14 K.M. S<strong>to</strong>ne,<br />

Paithan Road,<br />

Chitegaon, Tq.<br />

Paithan, Dist:<br />

Aurangabad<br />

B-28,29 ,MIDC<br />

Dombivali, Dist.<br />

Thane<br />

58 Kalyan ASB internations, Plot No. E-9, MIDC<br />

Ambarnath<br />

59 Thane Viraj Pr<strong>of</strong>ile, Plot No. G-2, MIDC<br />

Tarapur<br />

60 Thane Dicitex Exports, Plot No G7/1 ,MIDC<br />

Tarapur<br />

61 Thane Mandhana<br />

Weaving House,<br />

Plot No.C-2<br />

MIDC,Tarapur<br />

Closure Direction<br />

dtd. 07.10.2010<br />

Restart Directions<br />

issued on<br />

06/02/2010<br />

Interim Directions<br />

issued on<br />

08/12/2011<br />

Interim Directions<br />

issued on<br />

07/02/2012<br />

Interim Directions<br />

issued on<br />

24/01/2012<br />

Interim Directions<br />

issued on<br />

24/01/2012<br />

62 Thane Mukand Ltd. Kalwa, Thane Interim Directions<br />

issued on<br />

17/04/2010<br />

Sr. No.<br />

1<br />

2<br />

Abstract <strong>of</strong> Outstanding Directions <strong>of</strong> CAC <strong>List</strong> as on 21.05.2012<br />

Regional Office<br />

No. <strong>of</strong> Directions<br />

Nagpur<br />

Chandrapur<br />

15<br />

6


3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

Nashik<br />

Pune<br />

Kolhapur<br />

Kalyan<br />

Thane<br />

Aurangabad<br />

Amravati<br />

Mumbai<br />

Total<br />

Mrs. Viju/AST/CAC/Outsstanding directions as on 21.05.2012<br />

1<br />

17<br />

6<br />

2<br />

4<br />

5<br />

0<br />

6<br />

62


CAC Item No. 01<br />

Re<strong>submitted</strong> Agenda<br />

Name <strong>of</strong> the Industry: M/s. Court Yard Hotel, (EON Hinjewadi Infrastructure Pvt. Ltd.),<br />

S. No. 19/2 and 20/1-9, Rajiv Gandhi Infotech Park,<br />

Hinjewadi, Tal-Mulshi, Dist. Pune.<br />

HOD Remarks:<br />

1. Applied for grant <strong>of</strong> <strong>Consent</strong> <strong>to</strong> Operate on 19/10/2010 at Regional Office,<br />

Pune.<br />

2. R.O. (Pune) has issued show cause notice on 12/07/2011 for operating hotel<br />

without obtaining <strong>Consent</strong> <strong>to</strong> Operate from the Board, for not providing<br />

ozonisation / UV Treatment in place <strong>of</strong> chlorination for the treatment <strong>of</strong><br />

sewage, and for not submitting B.G. <strong>of</strong> Rs. 5.0 Lakhs as per <strong>Consent</strong> <strong>to</strong><br />

Establish condition No. (13).<br />

3. RO, Pune forwarded the application <strong>to</strong> A.S. (T) Section on 7/10/2011 and<br />

recommended <strong>to</strong> grant <strong>Consent</strong> <strong>to</strong> Operate.<br />

4. Application received at A.S. (Tech.) Section on 18/10/2011.<br />

5. Mem<strong>be</strong>r Secretary has ordered <strong>to</strong> call explanation on 3/02/2012 from R.O.<br />

(Pune) for wrongly processing and forwarding consent application <strong>to</strong> HQ.<br />

6. R.O. (Pune) was instructed on 29/02/2012 <strong>to</strong> submit their explanation for non<br />

taking action against Hotel authority for submitting wrong information in the<br />

Board and for wrongly processing and forwarding consent application <strong>to</strong> HQ.<br />

7. R.O. (Pune) has <strong>submitted</strong> explanation that Hotel Authority has informed vide<br />

letter dtd. 23/01/2012 that they have converted water body meant for<br />

<strong>be</strong>autification purpose in<strong>to</strong> swimming pool. Also, he has issued proposed<br />

directions on 2/03/2012 for operating hotel without obtaining <strong>Consent</strong> <strong>to</strong><br />

Operate from the Board and for submitting wrong information in the Board.<br />

8. RO, Pune has recommended <strong>to</strong> initiate stringent action against the Hotel<br />

Authority.<br />

9. Case was discussed in the CAC meeting on 20/03/2012 and it was decided<br />

<strong>to</strong> issue SCN for refusal <strong>of</strong> <strong>Consent</strong> as the Industry has not <strong>submitted</strong> B.G. <strong>of</strong><br />

Rs. 5.0 Lakhs within stipulated time and not mentioning swimming pool<br />

activity in the application for <strong>Consent</strong> <strong>to</strong> 1 st Operate.<br />

10. Show cause notice was issued on 29/03/2012 <strong>to</strong> which hotel authority has<br />

replied vide letter dtd. 11/04/2012 and <strong>submitted</strong> B.G. <strong>of</strong> Rs. 5.0 Lakhs on<br />

28/04/2012.<br />

11. <strong>Consent</strong> <strong>to</strong> 1 st Operate may <strong>be</strong> granted for the period up<strong>to</strong> 31/10/2013 after<br />

the receipt <strong>of</strong> additional payment <strong>of</strong> Rs. 4,08,320/- as per Env. Dept’s revised<br />

<strong>Consent</strong> Fee G.R. dtd. 25/08/2011.


CAC Item No. 02<br />

Name <strong>of</strong> the Industry: M/s. The Leela Kempinski Sahar,<br />

Plot No. 1407(pt), 1405(pt), 1404(pt),<br />

Sahar, Andheri(E), Mumbai.<br />

HOD Remarks:<br />

a. Applied for grant <strong>of</strong> Renewal <strong>of</strong> consent for hotel activity including 395 rooms<br />

including lodging activity.<br />

b. Application received at SRO on 21.10.2011 and at HQ on 07.01.2012.<br />

c. Previous consent was valid up<strong>to</strong> 31.08.2011.<br />

d. The case was discussed during CAC meeting held on 23.01.2012 and during<br />

the meeting, it was decided <strong>to</strong> issue SCN for refusal <strong>of</strong> consent as industry has<br />

not replied <strong>to</strong> letter issued by the SRO on 11.11.2011. SCN issued on<br />

06.02.2012 and industry has <strong>submitted</strong> the reply on 27.02.2012 & 03.04.2012,<br />

wherein mentioned that C.I. mentioned is found reduced <strong>to</strong> previous year is due<br />

<strong>to</strong> fluctuation <strong>of</strong> the foreign exchange rate <strong>of</strong> the assets purchased under foreign<br />

loans. They are ready <strong>to</strong> pay the requisite consent fees. Current year C.I. is Rs.<br />

318.34 Crs. Therefore, File was referred <strong>to</strong> CAO for verification <strong>of</strong> point no. (a)<br />

& (b) and he remarked that C.I. shown in schedule <strong>of</strong> fixed assets <strong>of</strong> balance<br />

sheet do not match with <strong>to</strong>tal gross block <strong>of</strong> fixed asset shown in CA-certificate.<br />

e. Further, it was discussed during CAC meeting held on 16.04.2012 and decided<br />

<strong>to</strong> grant consent after CI verification by CAO.<br />

f. Accordingly, file was again referred <strong>to</strong> CAO on 20.04.2012 and he asked <strong>to</strong> call<br />

Balance Sheet from industry <strong>to</strong> verify Gross Block <strong>of</strong> Fixed Assets. After<br />

verification <strong>of</strong> CA certificate <strong>of</strong> Multiple unit, it is reflect that C.I. in fixed assets in<br />

particularly building, land and furniture fixture got reduced. Gross block <strong>of</strong> fixed<br />

assets never reduce in value in normal course <strong>of</strong> business. Hence, said details<br />

were called from industry on 27.04.2012 and 03.05.2012, but they have not<br />

<strong>submitted</strong> the reply till date.<br />

g. <strong>Consent</strong> may <strong>be</strong> refused due <strong>to</strong> non-submission <strong>of</strong> Balance Sheet details.


CAC Item No. 03<br />

Name <strong>of</strong> the Industry: M/s. Wardha Power Company Ltd.,<br />

Phase II <strong>of</strong> 270 MW,<br />

MIDC Warora, Dist-Chandrapur.<br />

HOD Remarks:<br />

• Applied for renewal <strong>of</strong> consent for phase II <strong>of</strong> 270 MW capacities (i.e 2 x 135 MW)<br />

with no increase in capacity.<br />

• Gross block investment is increased from Rs 1211.15 crore <strong>to</strong> Rs 1339 crore &<br />

<strong>submitted</strong> additional consent <strong>of</strong> Rs 255700/- as consent <strong>to</strong> establish fee and renewal<br />

fees <strong>of</strong> Rs. 26,78,000/- as per new GR dated 25.8.2011 for the consent period up <strong>to</strong><br />

31.1.2013.<br />

• Domestic effluent generation is 48 m3/day. STP provided. Industrial effluent generation<br />

is 1800 m3/day. ETP consists <strong>of</strong> neutralization tank, aeration tank, RO system, guard<br />

point. This treated effluent is used for cooling makeup. RO reject taken in evaporation<br />

pond for further use in dust suppression.<br />

• Coal consumption -3600 MT/day. ESP Followed by bag house provided <strong>to</strong> boiler. Bag<br />

house provided <strong>to</strong> coal crusher and transfer point.<br />

• Regional Officer, Chandrapur has issued interim direction on dtd 25/05/2011<br />

• Analysis results <strong>of</strong> ambient air quality moni<strong>to</strong>ring and stack moni<strong>to</strong>ring are<br />

exceeding the standards.<br />

Earlier the case was discussed in CAC meeting held on 20.03.2012 and it was decided<br />

<strong>to</strong> issue Show cause notice for refusal <strong>of</strong> consent. Accordingly Board has issued SCN vide letter<br />

dated 2.4.2012. R.O. Chandrapur has <strong>submitted</strong> the compliance report vide letter dated<br />

17.04.2012.<br />

In view <strong>of</strong> the above we may grant renewal <strong>of</strong> <strong>Consent</strong> up <strong>to</strong> 31.1.2013 with condition <strong>of</strong><br />

Encashment <strong>of</strong> Bank Guarantee <strong>of</strong> Rs.10/- Lakhs against exceeding norms and fresh Bank<br />

Guarantee <strong>of</strong> Rs.20/-Lakhs <strong>to</strong> achieve the standards.


CAC Item No. 04<br />

Name <strong>of</strong> the Industry: M/s. Thyssenkrupp Engine Components India Pvt. Ltd.,<br />

G.No.392, A/p Gonde, Vill: Wadivarhe, Tal: Igatpuri,<br />

Dist: Nashik.<br />

HOD Remarks:<br />

1. Applied for 1 st consent <strong>to</strong> operate <strong>Consent</strong> <strong>to</strong> established obtained for production <strong>of</strong><br />

crank shafts – 1,00,000 Nos./Year.<br />

2. Gross block investment is increased from Rs 102.78 crores <strong>to</strong> Rs 155.52 crore. <strong>Consent</strong><br />

fee paid by the industry Rs.2,08,251 & required <strong>to</strong> submit difference in <strong>Consent</strong> fee <strong>of</strong><br />

Rs.2,02,789/- as per new GR dated 25.8.2011 for the consent period up <strong>to</strong> 31.1.2013<br />

3. SRO, Nashik reported that industry has not provided STP, ETP and coolant treatment<br />

plant and industry has started production activity since Novem<strong>be</strong>r, 2011 without valid<br />

consent <strong>to</strong> operate.<br />

4. Warning notice issued by SRO, Nashik. Show cause notice issued by R.O. Nashik vide<br />

letter dated 22.02.2012 .<br />

Earlier the case was discussed in CAC held on 20.03.2012 and it was decided <strong>to</strong> issue<br />

show cause notice for refusal <strong>of</strong> consent. Accordingly Board has issued Show Case Notice vide<br />

letter dated 02.04.2012. Industry has <strong>submitted</strong> the reply <strong>of</strong> SCN vide letter dated 10.04.2012.<br />

R.O. Nashik <strong>submitted</strong> the compliance report vide letter dated 24.04.2012.<br />

We may grant 1 st <strong>Consent</strong> <strong>to</strong> operate for the period up <strong>to</strong> 30.09.2012 with the operation<br />

Bank Guarantee <strong>of</strong> Rs.5/- Lakhs each for ETP operation and STP operation.


CAC Item No. 05<br />

Name <strong>of</strong> the Industry: M/s. Western Coalfields Ltd.,<br />

Umred Open Cast Project,<br />

Tal: Umred, Dist: Nagpur.<br />

HOD Remarks:<br />

1. Applied for plain renewal <strong>of</strong> <strong>Consent</strong>.<br />

2. Earlier consent for mining <strong>of</strong> coal 3.5 MTPA was valid up <strong>to</strong> 31.12.2011.<br />

3. Capital Investment <strong>of</strong> the Industry is Rs.168.43. The investment was in earlier consent<br />

was 201.44 cores. Justification required for decrease in capital investment. Capital<br />

investment Certificate <strong>of</strong> C.A. is not furnished.<br />

4. Industry required <strong>to</strong> submit difference in <strong>Consent</strong> Fee <strong>of</strong> Rs.8,26,266/- for the consent<br />

validity period up <strong>to</strong> 31.12.2012 as per new GR dated 25.08.2011.<br />

5. Mobile Water tanker provided for water sprinkling on road. 7 Nos. rain guns provided at<br />

CHP.<br />

6. Analysis results <strong>of</strong> AAQM are not <strong>submitted</strong>.<br />

7. Analysis results <strong>of</strong> effluent sample from ETP outlet collected on 5.10.2010 and<br />

22.2.2011 shows all the parameters are within the limit.<br />

Earlier the case was discussed in CAC meeting held on 23.01.2012 and it was decided<br />

<strong>to</strong> issue refusal order. Accordingly refusal order was issued on 08.02.2012. The unit vide letter<br />

dated 29.02.2012 has requested for revocation <strong>of</strong> refusal order. The work <strong>of</strong> STP require two<br />

years. Strengthening <strong>of</strong> water sprinkler by June, 13, 2012.<br />

In view <strong>of</strong> above work, we may consider the proposal for withdrawal <strong>of</strong> refusal order<br />

and forfeit the Bank Guarantee <strong>of</strong> Rs.10 Lakhs. Also grant conditional consent <strong>to</strong><br />

complete all the works related <strong>to</strong> pollution control within 1 year.


CAC Item No. 06<br />

Name <strong>of</strong> the Industry: M/s. WCL Mungoli Opencast Mine,<br />

Po-Sakhara(Kolgaon),Mungoli Sub Area,<br />

Dist-Yavatmal.<br />

HOD Remarks:<br />

1. Applied for renewal <strong>of</strong> consent with expansion from 1.5 Million <strong>to</strong>n per year <strong>to</strong><br />

4.0 Million <strong>to</strong>n per year.<br />

2. Obtained Environmental Clearance for coal production 2.5 MTPA <strong>to</strong> 4.0 MTPA from<br />

MoEF GOI vide letter dated 30th March 2011, copy is enclosed.<br />

3. Earlier consent was valid up <strong>to</strong> 31/12/2010, for coal production <strong>of</strong> 1.55 Million <strong>to</strong>n<br />

per year.<br />

4. Regional Office Chandrapur vide letter dated 21/01/2012 demanded additional consent<br />

fee <strong>of</strong> Rs. 34,80,938/- including delay charges and balanced consent fee. Mine authority<br />

vide their letter dated 03/02/2012 has <strong>submitted</strong> that they are in process <strong>of</strong> depositing<br />

additional fee.<br />

5. Coal Production for last three years is enclosed herewith. The Production for the year<br />

2010-11 was 3.058 Million Ton.<br />

6. The Board vide letterMPC/CRO/1366/2010 dated 05/08/2010 has issued interim<br />

directions <strong>to</strong> the mine. But said mine authority is non-complied with respect <strong>to</strong><br />

these points.<br />

a. Active O.B is about 50 meter away from notified Wardha river. The OB<br />

was slide in part and spread up <strong>to</strong> bank <strong>of</strong> river.<br />

b. Operation & maintenance <strong>of</strong> existing air pollution control system, sewage<br />

treatment plant is very poor and thus affecting surrounding environment.<br />

8. From the Ambient Air Moni<strong>to</strong>ring Results carried in Jan/March/Oct, 2011 observed<br />

that results are exceeding.<br />

9. Mine Lease boundary is adjacent <strong>to</strong> notified A-II class Wardha river ( 0.2 Km) and<br />

within two km from Notified A-II Class Penganga river. RRZ not satisfied for<br />

expansion <strong>of</strong> mine near the notified A-II class river.<br />

10. Earlier the case was discussed in CAC meeting dt 16/04/2012 decided <strong>to</strong> refuse the<br />

consent for expansion and SCN for refusal <strong>of</strong> renewal <strong>of</strong> consent <strong>of</strong> existing unit.<br />

Accordingly, Board has issued SCN for refusal on dt 23/04/2012 and refusal order for<br />

expansion is issued on 25/04/2012. Industry has <strong>submitted</strong> the reply <strong>of</strong> SCN vide letter<br />

dt 30/04/2012 received on 05/05/2012.<br />

We may grant the renewal <strong>of</strong> consent for 2.5 Million Ton/Yr capacity by forfeting<br />

the existing BG <strong>of</strong> Rs.5 Lakhs due <strong>to</strong> non compliance <strong>of</strong> consent conditions and by<br />

taking operation BG <strong>of</strong> Rs.5 Lakhs <strong>to</strong>wards pollution control system.


CAC Item No. 07<br />

Name <strong>of</strong> the Industry: Mahindra and Mahindra Ltd.,<br />

F-1 & 7, MIDC Hingna, Nagpur.<br />

HOD Remarks :<br />

• Applied for first consent <strong>to</strong> operate for expansion.<br />

• <strong>Consent</strong> <strong>to</strong> establish for expansion obtained vide letter dated 26.8.2011.<br />

• <strong>Consent</strong> <strong>of</strong> existing unit is valid up <strong>to</strong> 28.2.2014.<br />

• Total Gross block investment <strong>of</strong> the industry is Rs 274 crore (CI <strong>of</strong> existing unit is Rs.<br />

160/- crore and CI <strong>of</strong> expansion is Rs. 114/- crore). <strong>Consent</strong> fee <strong>of</strong> Rs.5, 60,000/- paid<br />

for the period up <strong>to</strong> 31.01.2014 as per new GR.<br />

• Domestic effluent generation is 4.34 m3/day. STP provided. Industrial effluent 130 CMD.<br />

Existing ETP <strong>of</strong> 300 m3 capacity will <strong>be</strong> utilized & addl. 150m3 proposed. Treated<br />

effluent will <strong>be</strong> recycled partly and remaining disposed on land for gardening.<br />

• Paint booth with water scrubbing provided.<br />

• Industry has installed plant and machinery for phosphate and spray painting and also<br />

provided air pollution control system i.e water scrubbing system with exhaust stack for<br />

the same.<br />

• Industry has provided stack for hot water genera<strong>to</strong>r and backing oven.<br />

• Industry has provided pipeline for carrying effluent from new plant <strong>to</strong> existing effluent<br />

treatment plant having capacity 300m3.<br />

• Installation <strong>of</strong> machineries in transmission line section found in progress and fac<strong>to</strong>ry<br />

representative reported that, they have completed work within the month.<br />

• Earlier the case was discussed in CAC meeting held on 20.03.2012 and it was decided<br />

<strong>to</strong> keep the case in a<strong>be</strong>yance till the completion <strong>of</strong> the work and compliance <strong>of</strong> consent<br />

conditions.<br />

• R.O. Nagpur vide letter dated 21.04.2012 has <strong>submitted</strong> the compliance report <strong>of</strong> the<br />

industry.<br />

As reported by R.O. Nagpur, now the unit has completed the remaining works <strong>of</strong><br />

pollution control system and is ready for use. In view <strong>of</strong> the above, we may grant consent <strong>to</strong><br />

operate amalgamating <strong>to</strong> the existing one for period up <strong>to</strong> 31.01.2014.


CAC Item No. 08<br />

Name <strong>of</strong> the Industry: M/s. Gupta Energy Ltd.,<br />

(Formerly known as M/s Gupta Thermal Power Plant)<br />

Khasara No.89, Usgaon-Shengaon, Chandrapur<br />

HOD Remarks :<br />

1. RED/LSI Unit, Applied for first consent <strong>to</strong> operate for the power plant coal based 2 x 60<br />

MW.<br />

2. <strong>Consent</strong> <strong>to</strong> establish granted by Board vide letter dated 29.2.2008 up <strong>to</strong> COU and<br />

amendment in consent for change in name from M/s Gupta Thermal Power Plant <strong>to</strong><br />

M/s Gupta Energy Ltd., granted vide letter dated 27.3.2008.<br />

3. Environment Clearance granted by MoEF,GoI vide letter dated 4.9.2008 under the name<br />

M/s Gupta Coalfields & Washeries Ltd.,. Change in the name in EC required.<br />

4. Capital Investment <strong>of</strong> the industry is Rs.520.87 Crore. Since project cost shown during<br />

the consent <strong>to</strong> establish was Rs. 364 crore and now shown as Rs.520.67 crore,<br />

Difference in consent fee <strong>of</strong> Rs.3,13,740 /- for increased in capital investment <strong>of</strong><br />

Rs.156.87 crore shall <strong>be</strong> <strong>submitted</strong> by the industry.<br />

5. I/c SRO Chandrapur recommended consent <strong>to</strong> operate subject <strong>to</strong> following compliances<br />

• Industry is located in CEPI<br />

• Standard for TPM shall <strong>be</strong> 50 mg/Nm3<br />

• Bot<strong>to</strong>m ash shall <strong>be</strong> disposed as per consent condition.<br />

• Permission <strong>to</strong> carry out bot<strong>to</strong>m ash in container & dump at ash pond may<br />

<strong>be</strong> reviewed.<br />

• Industry shall achieve zero discharge<br />

• Industry shall install three CAAQMS & on line stack moni<strong>to</strong>ring system.<br />

• Industry shall provide conveyor <strong>be</strong>lts for transportation <strong>of</strong> raw material<br />

/waste so as <strong>to</strong> minimize internal truck movement<br />

• Industry shall complete all the balance environmental works <strong>be</strong>fore<br />

commission <strong>of</strong> the power plant.<br />

6. Earlier the case was discussed in CAC meeting held on 23.1.2012 & decided <strong>to</strong> issue<br />

SCN Accordingly SCN issued <strong>to</strong> industry vide letter dated 3.2.2012<br />

7. Industry has <strong>submitted</strong> the reply <strong>of</strong> SCN received on 6.2.2012 & verification report<br />

received from RO/SRO on 14.2.2012.<br />

Earlier the case was discussed in CAC held on 20.03.2012 and it was decided <strong>to</strong><br />

keep the case in a<strong>be</strong>yance. Regional Officer, Chandrapur has <strong>submitted</strong> the compliance report<br />

dated 03.05.2012 and stated that the unit has completed the work <strong>of</strong> requisite pollution control


system. In view <strong>of</strong> above, we may grant <strong>Consent</strong> up <strong>to</strong> 31.03.2013 with conditional operational<br />

Bank guarantee <strong>of</strong> Rs.5/- Lakhs.


CAC Item No. 09<br />

Name <strong>of</strong> the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd.,<br />

Plot No. C-1, MIDC Bhagad,<br />

Tal: Mangaon, Dist –Raigad.<br />

.<br />

HOD Remarks :<br />

1. Applied for grant <strong>of</strong> 1st consent <strong>to</strong> operate.<br />

2. This case was discussed in the CAC meeting held on 16.04.2012.<br />

3. Industry has <strong>submitted</strong> reply <strong>to</strong> the SCN on 26.04.2012.<br />

4. SRO-Mahad has <strong>submitted</strong> report 03.05.2012.<br />

5. Industry has obtained Environmental Clearance from GoM for the same<br />

Product.<br />

6. Industry has paid consent fees Rs. 35, 76,738 /-as per revised<br />

G.R.25.08.2011.<br />

7. RO- Raigad has recommended case for grant <strong>of</strong> consent <strong>to</strong> operate subject <strong>to</strong>,<br />

industry shall provide full-fledged ETP and STP for treatment <strong>of</strong> industrial and<br />

domestic effluent.<br />

8. Industry has provided ETP <strong>to</strong> treat the domestic and industrial effluent.<br />

9. Recommended case for grant <strong>of</strong> consent <strong>to</strong> operate for the period up <strong>to</strong><br />

28.02.2014 subject <strong>to</strong> following conditions<br />

I. Industry shall install STP <strong>of</strong> adequate capacity for domestic<br />

effluent.<br />

II. Industry shall achieve BOD- 5 mg/l standard for treated industrial<br />

effluent .<br />

III. Industry shall provide 3 CAQMS within next 4 months with the B.G.<br />

<strong>of</strong> Rs.5 Lacs.


CAC Item No. 10<br />

Name <strong>of</strong> the Industry : M/s. POSCO Maharashtra Steel Pvt. Ltd.,<br />

CRC plant, Plot No. C-1, MIDC Vile Bhagad,<br />

Tal: Mangaon, Dist –Raigad.<br />

HOD Remarks:<br />

1. Applied for amendment in <strong>Consent</strong> <strong>to</strong> Establish for manufacturing <strong>of</strong> Full Hard Coil<br />

and Cold Rolled Coils.<br />

2. This case was discussed in the CAC meeting held on 16.04.2012.<br />

3. Industry has <strong>submitted</strong> reply letter on 26.04.2012 requested for consideration <strong>of</strong> BOD<br />

limit -30 mg/l<br />

4. Industry has obtained consent <strong>to</strong> establish for the production <strong>of</strong> Galvanized coils in<br />

the same premises.<br />

5. They have obtained Environmental Clearance for manufacturing Galvanizing coils.<br />

6. Industry has informed that they have applied for environmental clearance <strong>to</strong> GoM<br />

[SEAC] on 27.06.2011.<br />

7. Industry has paid consent fees Rs.9,49,580/-.+ Rs.9, 49,580/- as per new GR dated<br />

25.8.2011.<br />

8. <strong>Consent</strong> <strong>to</strong> establish may amend with the condition that industry shall achieve<br />

BOD- 30 mg/l with the incorporation <strong>of</strong> other parameters like Arsenic, Mercury,<br />

Lead, Cadmium etc.


CAC Item No. 11<br />

Name <strong>of</strong> the industry : M/s. Tata Steel Limited<br />

(Cold Rolling Coils & sheets)<br />

Plot No. S-76,MIDC. Tarapur Industrial Area,<br />

Tarapur Dist Thane 401 506<br />

HOD Remarks:<br />

• Applied for f consent <strong>to</strong> establish for expansion<br />

• Application received at SRO-Tarapur on dtd 30/11/2011 and at HQ on 03/03/2012.<br />

• Existing plant consent was valid up <strong>to</strong> 31/12/2011<br />

• Industrial Effluent Generation will <strong>be</strong> NIL (Existing 200 CMD) for which industry has<br />

provided effluent treatment plant .<br />

• Domestic effluent generation will <strong>be</strong> Nil (existing 11 CMD)<br />

• Industry has provided scrub<strong>be</strong>r <strong>to</strong> pickling section<br />

• Industry has provided air pollution control system <strong>to</strong> pickling section, galvanizing<br />

section, steam boiler & patenting line<br />

• SRO Tarapur-I has recommended for grant <strong>of</strong> consent <strong>to</strong> establish after assessment <strong>of</strong><br />

pollution load by education institute IIT/ICT (UDCT)/BATU<br />

• The case was discussed in CAC held on 20/03/2012. it was decided <strong>to</strong> resubmit the<br />

case <strong>be</strong>fore CAC after assessment <strong>of</strong> no increase in pollution Load<br />

• The unit has <strong>submitted</strong> the certificate from IIT Mumbai regarding No Increase in pollution<br />

load due <strong>to</strong> establish <strong>of</strong> above plant.<br />

• We may grant consent <strong>to</strong> establish for expansion<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration


CAC Item No. 12<br />

Name <strong>of</strong> the Industry : M/s. Maharashtra State Power Generation Co. Ltd.,<br />

Nashik Thermal Power Station,<br />

P.O. Eklahare, Dist: Nashik.<br />

HOD Remarks :<br />

1. Applied for renewal <strong>of</strong> consent for electricity generation (125 MW x 2 & 210 MW x 3). SRO,<br />

Nashik reported that Unit No.1 & 2 <strong>of</strong> 125 MW each are decommissioned and only unit<br />

no.3,4,5 <strong>of</strong> 210 Mw each are in operation .<br />

2. Earlier consent for electricity generation- 880 MW was valid up <strong>to</strong> 31.12.2011.<br />

3. Capital investment <strong>of</strong> the industry is increased from Rs.613.09 Crores <strong>to</strong> Rs.700.89 Crores<br />

(i.e. Rs.87.80 Crores.). Industry has paid <strong>Consent</strong> fee <strong>of</strong> Rs.28,03,575/- along with<br />

application. However, industry required <strong>to</strong> submit <strong>Consent</strong> <strong>to</strong> Establish fee <strong>of</strong><br />

Rs.1,25,000/- for increase in capital investment <strong>of</strong> Rs.87.80 crores.<br />

4. Domestic Effluent – 2500 CMD. Industry has provided STP. Industrial Effluent – 37285<br />

CMD. ETP provided. 20% effluent is used for gardening & 80% effluent is used for ash<br />

slurry.<br />

5. ESP provided <strong>to</strong> Unit no.3,4,5. The unit No.1 & 2 are closed.<br />

6. Augmentation <strong>of</strong> ESP is completed for unit no.3 and augmentation <strong>of</strong> ESTP for unit no.4 & 5<br />

is not done.<br />

7. CAAQM Station is not yet installed.<br />

8. Analysis results <strong>of</strong> Stack moni<strong>to</strong>ring are exceeding the standards.<br />

9. Regional Officer, Nashik reported that Board had issued directions vide letter No.<br />

MPCB/APAE/TB-2/B-1884 dated 29.03.2011 and directed the industry <strong>to</strong> comply with these<br />

directions in stipulated period and submit the Bank Guarantee <strong>of</strong> Rs.1.0 Crore <strong>to</strong>wards<br />

compliance <strong>of</strong> these directions (detail report is enclosed herewith). But Industry has failed <strong>to</strong><br />

submit the said Bank Guarantee. In view <strong>of</strong> above the application is <strong>submitted</strong> herewith for<br />

the consideration and further disposal, please.


10. Earlier the case was discussed in 16/04/2012 and it was decided <strong>to</strong> issue SCN for refusal<br />

<strong>of</strong> consent. Accordingly Board has issued SCN dt 23/04/2012. The industry has <strong>submitted</strong><br />

the reply <strong>of</strong> SCN vide letter dated 30/04/2012 received on 10/05/2012.<br />

The unit has not completed most <strong>of</strong> the pollution control works also CAAQMS also not yet<br />

installed.<br />

In view <strong>of</strong> above as decided in interim direction we may grant renewal for one year i.e<br />

31/12/2012 with BG <strong>of</strong> Rs.1/- Cr for compliance <strong>of</strong> above directions dated 29/03/2011.<br />

CAC Item No. 13<br />

Name <strong>of</strong> Industry: M/s. Balaji Amines Ltd (Chemical & Captive power plant),<br />

Gat No-194 <strong>to</strong> 197 Vill:Tamalwadi,<br />

Tq-Tuljapur Dist- Osmanabad<br />

HOD Remarks :<br />

1) Application for renewal <strong>of</strong> <strong>Consent</strong>.(Amalgamation <strong>of</strong> Two <strong>Consent</strong>s)<br />

2) This is Chemical industry with captive power plant.<br />

3) Application received for renewal <strong>of</strong> Captive power plant & Chemical plant.<br />

4) Application received at SRO on 14/01/2011, 16/04/2012 and at HQ on<br />

24/05/2011, 03/05/2012 for Captive power plant & Chemical Plant respectively.<br />

5) Total Industrial effluent generation- 182.43 CMD.<br />

6) Parent Industry is engaged in manufacturing <strong>of</strong> 20 different chemicals for which<br />

the consent is valid up<strong>to</strong> 30/04/2012<br />

7) The captive power plant consent was valid up<strong>to</strong> -31/01/2011.<br />

8) The application received from APC section on 06/03/2012.<br />

9) The case was placed in CAC meeting dtd-20/03/2012 and decided <strong>to</strong> resubmit the case<br />

in next CAC after obtaining report from RO/SRO and required consent fee from industry.<br />

10) Report received from SRO Latur with details <strong>of</strong> fee paid by the industry.<br />

11) Meanwhile the application <strong>of</strong> Chemical plant received from RO for renewal <strong>of</strong><br />

<strong>Consent</strong>.<br />

12) Hence it was decided <strong>to</strong> pace the case <strong>be</strong>fore CAC for Combine Renewal <strong>of</strong><br />

<strong>Consent</strong> with amalgamation <strong>of</strong> two consents (i.e-Chemical plant and Captive<br />

plant).<br />

13) RO Aurangabad had issued direction dtd-07/10/2012 and its Compliance is<br />

reported (Attached). Combine renewal <strong>of</strong> <strong>Consent</strong> may <strong>be</strong> approved.


CAC Item No. 14<br />

Name <strong>of</strong> Industry : M/s. Mumbai International Air Port Pvt. (Phase-I) Ltd.<br />

Chhatrapati Shivaji International Airport<br />

Terminal 1B, 1 st floor, Santacruz (E), Mumbai<br />

HOD Remarks:<br />

• Renewal with Resubmission case, was discussed in CAC <strong>of</strong> 30/04/2011 and<br />

31/01/2012.<br />

• Application <strong>of</strong> resubmission case received at SRO on 12/08/2010, and at HQ on<br />

10/01/2011.The application for renewal <strong>of</strong> consent received at SRO on 26/04/2012 and<br />

HQ on 09/05/2012.<br />

• Water requirement is 4.570MLD<br />

Sewage generation is 4.0 MLD<br />

STP provided - 4 MLD<br />

• Solid waste generation(MSW) is 15 Tons/day<br />

Biodegradable Disposed <strong>to</strong> MCGM<br />

Non Biodegradable sold <strong>to</strong> M/s Janata Scrap Merchant<br />

• The project proponent has obtained EC from MoEF vide No. 10-<br />

5/2007-IA-III dt. 03/04/2007<br />

• RO has recommended the case for grant <strong>of</strong> consent <strong>to</strong> operate<br />

• Renewal <strong>of</strong> consent with amalgamation <strong>of</strong> the consent with 1 st operate, may <strong>be</strong> granted<br />

with Bank guarantee <strong>of</strong> Rs. 5.0 lacs for operation and maintenance <strong>of</strong> STP.


CAC Item No. 15<br />

Name <strong>of</strong> Industry: M/s. Neptune Venture & Developers Pvt. Ltd. (Magnet Mall),<br />

Plot <strong>be</strong>aring CTS No. 372,372/1 <strong>to</strong> 65, LBS Marg,<br />

Village Kanjur, Tal. Kurla, Mumbai - 400078<br />

HOD Remarks:<br />

1. Applications for renewal <strong>of</strong> consent with expansion<br />

2. Application Received at SRO on 02/01/2012 and at HQ on 22/03/2012.<br />

3. Industry has provided STP <strong>of</strong> capacity 600+350 CMD.<br />

4. The firm has <strong>submitted</strong> the details <strong>of</strong> solid waste management, as per MCGM<br />

Certificate firm has provided 3 bins <strong>of</strong> 1.1 MT capacity each for vermi composting <strong>of</strong><br />

solid waste.<br />

5. Environment Statement for year 2010-2011 <strong>submitted</strong>.<br />

6. Industry has <strong>submitted</strong> voluntary payment <strong>of</strong> Rs. 5000/- for Cess payment , Cess<br />

assessment order not received<br />

7. RO has recommended the case for grant <strong>of</strong> consent <strong>to</strong> operate.<br />

8. <strong>Consent</strong> may <strong>be</strong> granted by obtaining lapse period fees and with BG <strong>of</strong> Rs. 10 lacs<br />

for operation <strong>of</strong> STP, MSW plant within 30 days period.


CAC Item No. 16<br />

Name <strong>of</strong> industry : M/s. Cadbury India Ltd.,<br />

G. No. -532, 533, A/p – Induri,<br />

Tal. Maval, Dist. – Pune.<br />

HOD Remarks:<br />

• Applied for the C <strong>to</strong> E for expansion for increase in production <strong>of</strong> Milk Crumb, Chocolate<br />

and confectionary by 717 MT/M and by 2163 MT/M separately.<br />

• Application for expansion by 717 MT/M received at SRO on dt.02/08/2010 and at HQ on<br />

dt. 01/03/2012 and Application for expansion by 2163 MT/M received at SRO on dt.<br />

18/01/2012 and at HQ on dt.01/03/2012.<br />

• Industry type is food additives, nutrients and flavors.<br />

• ETP – ETP <strong>of</strong> capacity 660 CMD consisting <strong>of</strong> primary, secondary and tertiary treatment<br />

provided.<br />

• Unit is located at @ 2.0 Km from river Indrayani.<br />

• Industry was called <strong>to</strong> submit the river distance certificate <strong>of</strong> Executive Engg. Irrigation<br />

Department and combined Pollution Load Assessment Report for all the three<br />

expansions vide letter dt. 16/03/2011.<br />

• The application was discussed in CAC dt.20.03.2012 and it was decided <strong>to</strong> keep the<br />

case in a<strong>be</strong>yance till obtaining No Increase in Pollution Load report <strong>of</strong> the plant and put<br />

up the case in next CAC.<br />

• Industries reply received <strong>to</strong> this <strong>of</strong>fice on dt. 16.04.2012 along with following points.<br />

• Industry has proposed <strong>to</strong> use Sweetened Milk Condensate instead <strong>of</strong> the starting<br />

material as a Milk, due <strong>to</strong> which the water consumption will <strong>be</strong> reduced.<br />

• The <strong>to</strong>tal trade effluent Exiting (500 CMD) and increased due <strong>to</strong> all three expansions is<br />

(69 CMD) i.e Total - 569 CMD.<br />

• The Domestic effluent is (Existing + Expansion) is 32 CMD.<br />

• Industry has proposed <strong>to</strong> install Ultra Filtration / Reverse Osmosis System.<br />

• Performa <strong>of</strong> No Increase in Pollution Load prepared by pr<strong>of</strong>essor UICT recommends that<br />

due <strong>to</strong> expansion there will <strong>be</strong> no increase in Pollution Load.<br />

• We may consider the certificate <strong>of</strong> UICT and Grant C <strong>to</strong> E.<br />

• Board has received two applications, now we may amalgamate & issue one C <strong>to</strong> E.


CAC Item No. 17


CAC Item No. 18<br />

Name <strong>of</strong> the Industry : M/s. Ballarpur Industries Ltd., (Ashti),<br />

Tal. Charmorshi, Dist.- Gadchiroli<br />

HOD Remarks:<br />

• Applied for the Renewal <strong>of</strong> <strong>Consent</strong> for production <strong>of</strong> Writing and printing paper<br />

(White) – 5000 T/M. (based on readymade pulp & without bleaching)<br />

• Application received at SRO <strong>of</strong>fice on dt.09/12/2011 and at HQ on dt. 07/04/2012.<br />

• Capital Investment <strong>of</strong> the Industry is Rs. 310.20 Crs.<br />

• Industrial effluent generation shown is reduced <strong>to</strong> the tune <strong>of</strong> 5500 CMD against<br />

the previous consented quantity <strong>of</strong> 6500 CMD.<br />

• Domestic effluent is 500 CMD <strong>to</strong>wards the previous consented quantity <strong>of</strong> 300<br />

CMD.<br />

• ETP <strong>of</strong> capacity 6000 CMD with secondary treatment is provided.<br />

• JVS results are provided which are within the consented limits.<br />

• ESP is provided as an APCS boiler.<br />

• As per the decision <strong>of</strong> the CAC meeting dt.16.04.2012, SCN was issued vide letter<br />

dt. 27.04.2012 <strong>to</strong> the Industry for Non Submission <strong>of</strong> BG, not providing adequate<br />

APC system and non compliance <strong>of</strong> consent conditions.<br />

• Regional Officer Chandrapur vide letter dt.03.05.2012 reported that<br />

a) The said unit was visited on 26.04.2012.<br />

b) Water sprinklers are provided at coal s<strong>to</strong>ck yard.<br />

c) The work <strong>of</strong> Installation <strong>of</strong> dust collec<strong>to</strong>r at crushing unit, ash siloes were in<br />

progress.<br />

d) Industry has <strong>submitted</strong> BG <strong>of</strong> Rs. 50,000/- valid up<strong>to</strong> 31/03/2013.<br />

• Now Industry has paid / <strong>submitted</strong> BG <strong>of</strong> Rs. 50000 as per the directions issued.<br />

• The dust collec<strong>to</strong>r installation is in progress as per RO report.<br />

• We may grant Renewal with BG <strong>of</strong> Rs. 5.0 Lakhs as per the matrix.


CAC Item No. 19<br />

Name <strong>of</strong> the Industry : M/s. Brin<strong>to</strong>ns Carpets Asia Pvt. Ltd.,<br />

Gat No.- 414/415/416, Vill.- Urawade,<br />

Tal. Mulshi, Dist.- Pune.<br />

HOD Remarks:<br />

• Applied for C <strong>to</strong> E for expansion for Dyed Yarn by 25 MT/M and Carpet production by<br />

25000 Sq. mtrs.<br />

• Application received at SRO on Dt.20.10.2011 and at HQ on 02.03.2012.<br />

• C.I <strong>of</strong> the proposed expansion is Rs. 8.57 Cr. (C.I <strong>of</strong> existing unit is Rs. 102.13 Cr; Total<br />

C.I <strong>of</strong> the Industry is Rs.110.7 Cr.)<br />

• Existing consent for Dyed yarn-150 MT/M, Carpet production -95000 Sq. mtrs. and<br />

spinning <strong>of</strong> yarn 261 MT/M is valid up<strong>to</strong> 31/12/2013.<br />

• Located at 3.00 Km away from Mula river (A-2).<br />

• Industrial effluent generation is <strong>to</strong> the tune <strong>of</strong> 25 CMD and D.E is 5CMD in addition <strong>to</strong><br />

exiting I.E -152 CMD.<br />

• Industry has provided ETP with secondary & Tertiary treatment.<br />

• For the treatment <strong>of</strong> D.E provided 3 packaged STP’s.<br />

• Disposal <strong>of</strong> the treated effluent is on land for gardening, land available is @ 12 Acres.<br />

• Obtained mem<strong>be</strong>rship <strong>of</strong> CHWTSDF, M/s. MEPL, Ranjangaon.<br />

• JVS results are not confirming <strong>to</strong> the consented standards w.r.t BOD.<br />

• RO Pune has recommended for grant <strong>of</strong> C <strong>to</strong> E by imposing appropriate Bank<br />

Guarantee <strong>to</strong>wards O & M <strong>of</strong> ETP.<br />

• As per the decision <strong>of</strong> the CAC dt. 16.04.2012, SCN for refusal <strong>of</strong> consent was issued<br />

vide letter dt. 27.04.2012 as industry has already started the operations and taking trial<br />

runs.<br />

• Industry has <strong>submitted</strong> reply <strong>to</strong> SCN and stated that no commercial production started,<br />

only the machines / operational conditions are checked with British Experts.<br />

• Industry has expressed apology for carrying trial run without C <strong>to</strong> O.<br />

• We may Grant C <strong>to</strong> E subject <strong>to</strong> provide augmentation <strong>of</strong> existing ETP or recycle<br />

effluent.


CAC Item No. 20<br />

Name <strong>of</strong> Industry : M/s. Bombay Rayon Fashion Ltd.,<br />

Plot No. - G-95, MIDC Tarapur,<br />

Tal. – Palghar, Dist. – Thane.<br />

HOD Remarks :-<br />

1. Applied for <strong>Consent</strong> <strong>to</strong> Ist <strong>Consent</strong> <strong>to</strong> Operate.<br />

2. <strong>Consent</strong> was refused in CAC dated 02.03.2012 and refusal was issued on 13.03.2012.<br />

3. The Case was disused in CAC meeting for reconsideration <strong>of</strong> Refusal dated 16.04.2012<br />

4. It was decided <strong>to</strong> obtain report from RO (Thane) along with the justification <strong>to</strong> achieve Zero<br />

discharge & revert back <strong>to</strong> CAC<br />

5. As per Regional Officer, Thane report Industry has made arrangement for utilizing treated<br />

effluent (250 CMD) for <strong>to</strong>ilet flushing, humidification process and cooling <strong>to</strong>wer, which will<br />

resulting Zero discharge.<br />

6. MIDC has not provided any connection <strong>to</strong> the industry for any kind <strong>of</strong> disposal drainage<br />

system.<br />

7. Industry is still engaged in weaving process without Boards permission.


CAC Item No. 21<br />

HOD Remarks :-<br />

Name <strong>of</strong> Industry : M/s. Ruchi Soya Industries Ltd.,<br />

Savroli- Kharpada,<br />

Road Isam<strong>be</strong>, Khalapur,<br />

Dist. – Raigad.<br />

1. Applied for C <strong>to</strong> O for expansion and amalgamation with existing <strong>Consent</strong>.<br />

Patalganaga,<br />

2. Based on details <strong>submitted</strong> and decision <strong>of</strong> CAC dated 02.03.2012, SCN for refusal was<br />

issued.<br />

3. The industry has <strong>submitted</strong> their representation <strong>to</strong> Board on 21.03.2012 and justified that<br />

from expansion no effluent generated except occasional washings <strong>of</strong> floor<br />

4. Case was placed in CAC dated 16.04.2012 and decided <strong>to</strong> call report <strong>of</strong> RO, Raigad in<br />

person on 17.04.201<br />

5. RO, Raigad <strong>submitted</strong> report on 17.04.2012and finding are as <strong>be</strong>low:a.<br />

The ETP <strong>of</strong> existing production was upgraded<br />

b. Seepage from s<strong>to</strong>rage tank <strong>of</strong> ETP finding is way <strong>to</strong> Patalganga River.<br />

c. The upgraded ETP is not yet commissioned.<br />

d. The results <strong>of</strong> treated effluent are exceeding the prescri<strong>be</strong>d standards.<br />

e. The production in C <strong>to</strong> E was equal <strong>to</strong> C <strong>to</strong> O valid consent (i.e. doubled)<br />

f. H.W. quantities are increased<br />

g. Air Pollution / Emission also increased.<br />

6. Grant C <strong>to</strong> O with amalgamation and obtain B.G. <strong>of</strong> Rs. 10 lakh for Nill effluent generation.<br />

Also we may obtain assurance / put condition in C <strong>to</strong> O that there should not <strong>be</strong> increase in<br />

effluent quantity from expansion.<br />

7. We may also obtain B.G. <strong>of</strong> Rs. 5 lakh for O & M <strong>of</strong> ETP (as per matrix)


CAC Item No. 22<br />

Name <strong>of</strong> the Industry : M/s. Bhima SSK Ltd., (Sugar Unit),<br />

Madhukarnagar, -Patas,<br />

Tal. Daund, Dist. Pune<br />

HOD Remarks :<br />

• Applied for <strong>Consent</strong> <strong>to</strong> Operate (Renewal).<br />

• Application received at SRO on 20.03.2012 and at HQ on 02.04.2012.<br />

• Industrial effluent generation is 580 CMD and D.E is 80 CMD.<br />

• ETP provided with secondary treatment and SDB.<br />

• Dust collec<strong>to</strong>r is provided <strong>to</strong> 5 nos. <strong>of</strong> Boilers.<br />

• The application was discussed in the CAC meeting dt. 16.04.2012.<br />

• As per the decision <strong>of</strong> the CAC meeting SCN for the refusal <strong>of</strong> the consent was issued<br />

vide letter dt. 27.04.2012 for discharging the effluent in<strong>to</strong> Bhima River, JVS results are<br />

exceeding the norms and non compliance <strong>of</strong> the directions issued by the Board<br />

• Industry has replied vide letter dt. 06.05.2012 that Industries sugar ETP was old and<br />

aeration tank drain valve failed and hence the effluent went out side the fac<strong>to</strong>ry<br />

premises, S<strong>to</strong>pped the discharge <strong>of</strong> the effluent immediately and replaced the drain<br />

valve, Industry has s<strong>to</strong>pped the production on 04.04.2012, The proposal <strong>of</strong> the up<br />

gradation <strong>of</strong> ETP is received from Vasantdada Sugar Institute, Upgradation <strong>of</strong> the ETP<br />

will <strong>be</strong> done in this <strong>of</strong>f-season.<br />

• Closure was issued on 26.03.2012 and Industry has s<strong>to</strong>pped production on 04.04.2012.<br />

• Sugar ETP was <strong>to</strong>o old and valve was failed and untreated effluent went outside the<br />

premises.<br />

• Industry is regular defaulter.<br />

• We may refuse the <strong>Consent</strong>.


CAC Item No. 23<br />

Name <strong>of</strong> the industry : M/s. B.S. ISPAT LTD.,(sponge Iron Plant)<br />

Vill-Salori Yensa,Tal-Warora, Dist.- Chandrapur.<br />

HOD Remarks :<br />

1. M/s B.S.Ispat Ltd,Salori Yensa, Ta warora, dist Chandrapur, is engaged in<br />

manufacturing <strong>of</strong> sponge iron.<br />

2. Earlier application for first consent <strong>to</strong> operate was refused by the Head<br />

<strong>of</strong>fice vide letter dated 01/02/2012 due <strong>to</strong> non compliance <strong>of</strong> consent <strong>to</strong><br />

establish conditions and accordingly Regional Office vide letter dated<br />

29/02/2012 has issued directions not <strong>to</strong> operate industry unless obtaining<br />

valid consent <strong>to</strong> operate from the Board.<br />

3. Now, the said industry has made fresh application for first consent <strong>to</strong><br />

operate for sponge iron plant for production <strong>of</strong> 60,000 TPA (Phase-I).<br />

4. Capital Investment <strong>of</strong> the Sponge iron plant is Rs. 65.24 crore. Total Capital<br />

Investment <strong>of</strong> integrated project including sponge iron plant as per the<br />

consent <strong>to</strong> establish granted earlier is Rs.158.5/- crore.<br />

5. <strong>Consent</strong> Fees <strong>of</strong> Rs.2,00,000/- had <strong>be</strong>en <strong>submitted</strong> with earlier consent<br />

application which was refused. Hence we may forfeit one term consent fees<br />

<strong>of</strong> Rs.1,00,000/- and consider Rs.1,00,000/- for this consent <strong>to</strong> operate.<br />

6. Obtained Environmental Clearance from the MoEF, GOI, vide letter dated 5th<br />

May 2009 for sponge iron unit with captive power plant , for sponge iron <strong>of</strong><br />

production <strong>of</strong> 64000 TPA & further obtained EC vide letter dated 23 rd<br />

Novem<strong>be</strong>r 2010 for production <strong>of</strong> sponge iron <strong>of</strong> 64000 TPA <strong>to</strong> 184000 TPA,<br />

copy is enclosed.<br />

Now unit has installed necessary pollution control system including<br />

installation <strong>of</strong> CAAQMS & Opacity meter. The compliance is <strong>submitted</strong> by RO<br />

/SRO. We may grant consent <strong>to</strong> operate up <strong>to</strong> 30.4.2013 with operational bank<br />

guarantee <strong>of</strong> Rs.5/- Lakhs <strong>to</strong>wards pollution control system.


CAC Item No. 24<br />

Name <strong>of</strong> the Industry: M/s. Wokhardt Hospitals Pvt. Ltd.,<br />

Dr. Anand Rao Nair Marg,<br />

Byculla, Mumbai.<br />

HOD Remarks:<br />

a. Applied for grant <strong>of</strong> consent <strong>to</strong> Establish for construction <strong>of</strong> Hospital (320 No.<br />

<strong>of</strong> Beds and Cafeteria/canteen).<br />

b. Application received at SRO on 3.11.2011 and at HQ on 17.03.2012.<br />

c. The <strong>to</strong>tal built-up area 25,015.26 sq.m. and <strong>to</strong>tal plot area is 3586.98 sq.m.<br />

d. Applicant requires <strong>to</strong> obtain Environmental Clearance as per EIA Notification,<br />

2006 and obtained the same.<br />

e. Applicant have started construction activity without obtaining consent as<br />

previously they had approved plan for 7,868.06 sq.m. BUA and said does not<br />

require Environmental Clearance. SRO reported that they have completed 21<br />

s<strong>to</strong>rey building <strong>of</strong> hospital with partly plumbing/ flooring. And SRO recommended<br />

<strong>to</strong> issue SCN for the same.<br />

f. The effluent generated from the said activity will <strong>be</strong> sewage – 242 CMD and<br />

proposed <strong>to</strong> provide STP (capacity-325 CMD) and treated effluent will <strong>be</strong> reused<br />

for flushing, cooling purpose and remaining treated effluent is disposed <strong>of</strong>f in<strong>to</strong><br />

the sewer line.<br />

g. The bio-degradable waste generated will <strong>be</strong> segregated and disposed <strong>to</strong> MCGM.<br />

And non-biodegradable waste will <strong>be</strong> send <strong>to</strong> authorized vendor. They have<br />

proposed <strong>to</strong> provide vermin-composting pits for biodegradable waste.<br />

h. RO reported that applicant have proposed rain water harvesting.<br />

i. The C.I. <strong>of</strong> project mentioned in EC is Rs. 100 Crs. and in the application it is<br />

mentioned as Rs. 208 Crs. Applicant have <strong>submitted</strong> the clarification as earlier<br />

medical equipment cost did not included in C.I. and escalation in project cost is<br />

due <strong>to</strong> the time lapsed <strong>be</strong>tween 2008 and now and paid consent fees<br />

accordingly.<br />

j. As this is the construction <strong>of</strong> Hospital with canteen, category <strong>of</strong> consent and<br />

consent granting authority needs <strong>to</strong> <strong>be</strong> defined. As per CPCB revised product<br />

category, Hospital comes under RED category. There are similar activities in<br />

Hospital & Hotel such as laundry activity, canteen, sewage waste, biodegradable<br />

waste. So, we may consider hospital in Red category and Hotel.<br />

k. The case was discussed in CAC dtd. 16.04.2012 and it was decided <strong>to</strong> keep the<br />

case in a<strong>be</strong>yance. It was decided <strong>to</strong> cover the Hospital activity under purview <strong>of</strong>


Water Act, Air Act, etc. <strong>to</strong> grant consent, a separate note shall <strong>be</strong> moved for<br />

discussion in CAC and then a decision <strong>be</strong> taken in this case.<br />

l. <strong>Consent</strong> may <strong>be</strong> granted up<strong>to</strong> commissioning <strong>of</strong> the unit.


CAC Item No. 25<br />

Fresh Agenda<br />

Name <strong>of</strong> the Industry: M/s. Classic City Investments Pvt. Ltd.,<br />

36/3B, Vill. Ghorpadi,<br />

Tal. Haveli, Dist. Pune<br />

HOD Remarks:<br />

a. Applied for grant <strong>of</strong> Renewal <strong>of</strong> consent for hotel activity (Five Star) includes<br />

Lodging & Boarding, Restaurants, Banquates Halls, Club, Lounge Bar Rooms &<br />

Suites, etc.(270 Rooms).<br />

b. Application received at SRO on 21.03.2012 and at HQ on 19.04.2012.<br />

c. The effluent generated (388.5 CMD) is treated in combine STP and the treated<br />

effluent is used for flushing, cooling purpose. JVS Results <strong>of</strong> dtd. 21.02.2012 and<br />

20.03.2012 are within the norms.<br />

d. RO/SRO reported that industry has provided ozonation treatment <strong>to</strong> one <strong>of</strong> the<br />

swimming pool and remaining work <strong>of</strong> the same is in progress, which need<br />

further period <strong>of</strong> three months for completion.<br />

e. The bio-degradable waste generated is <strong>be</strong>ing sent <strong>to</strong> PMC site for treatment and<br />

disposal.<br />

f. RO-Pune recommended the case for grant <strong>of</strong> consent up<strong>to</strong> 31.03.2017 with the<br />

condition <strong>of</strong> obtaining BG <strong>to</strong>wards the installation <strong>of</strong> ozonation treatment within<br />

next three month period.<br />

g. <strong>Consent</strong> may <strong>be</strong> granted with the condition <strong>of</strong> obtaining BG for providing<br />

ozonation treatment within three months period.


CAC Item No. 26<br />

Name <strong>of</strong> the Industry: M/s. Nirmal Lifestyle Ltd., (Hotel & Shopping Mall)<br />

CTS No. 706, 709, 710(pt), 711 <strong>to</strong> 714, 716 <strong>to</strong> 720, 722, 724 &<br />

724/1 <strong>to</strong> 10, 730/A <strong>to</strong> E, 762 & 762 (pt), Vill. Nahur,<br />

Mulund-W, Mumbai<br />

HOD Remarks:<br />

1. Applied for grant <strong>of</strong> consent <strong>to</strong> Establish for Commercial project <strong>of</strong> Hotel (450<br />

rooms) and shopping mall.<br />

2. Application received at SRO on 21.03.2012 and at HQ on 19.04.2012.<br />

3. The <strong>to</strong>tal built-up area 94,475.74 sq.m. and <strong>to</strong>tal plot area is 81,692.15 sq.m.<br />

4. Applicant requires <strong>to</strong> obtain Environmental Clearance as per EIA Notification, 2006<br />

and obtained the same.<br />

5. Applicant have started construction work and completed the RCC work <strong>of</strong><br />

Commercial building up<strong>to</strong> 4 th floor and foundation work <strong>of</strong> three service core area is<br />

under progress.<br />

6. Applicant have obtained CC on 03.01.2007 and IOD on 10.08.2006 for commercial<br />

mall.<br />

7. Applicant have handed over the building no. 1 & 2 <strong>to</strong> society as per the approved<br />

plan (CC).<br />

8. The effluent generated from the said activity will <strong>be</strong> sewage – 681 CMD and<br />

proposed <strong>to</strong> provided STP (capacity-600 CMD) for Hotel and STP (Capacity-450<br />

CMD) for commercial building. Treated effluent will <strong>be</strong> reused for flushing, cooling<br />

purpose, etc.<br />

9. The bio-degradable waste generated will <strong>be</strong> segregated and disposed <strong>to</strong> MCGM.<br />

And non-biodegradable waste will <strong>be</strong> send <strong>to</strong> authorized vendor.<br />

10. RO-Mumbai issued SCN <strong>to</strong> the applicant on 09.03.2012 for starting construction<br />

without obtaining consent, reply not received.<br />

11. <strong>Consent</strong> may <strong>be</strong> granted in RED category after receipt <strong>of</strong> reply <strong>to</strong> SCN issued.


CAC Item No. 27<br />

Name <strong>of</strong> the Industry: M/s Radisson Blu (5 Star Hotel),<br />

Unit <strong>of</strong> Bestech Hospitalities Pvt. Ltd.,<br />

KH. No. 32/2-3, 37/1-C <strong>of</strong> Mauja-Somalwada, Nagpur.<br />

HOD Remarks:<br />

1. Applied for grant <strong>of</strong> <strong>Consent</strong> <strong>to</strong> 1 st Operate for 5 star hotel having 214 nos. <strong>of</strong><br />

rooms on 10/04/2012 at Sub-Regional Office, Nagpur-I.<br />

2. SRO, Nagpur-I forwarded the application <strong>to</strong> A.S. (Tech.) Section on<br />

21.04.2012.<br />

3. Board has granted <strong>Consent</strong> <strong>to</strong> Establish <strong>to</strong> the Hotel vide <strong>Consent</strong> No.<br />

BO/AS(T)/EIC-NG-6312-12/AMND/CAC-365 dtd. 29/03/2012 for 214 Nos. <strong>of</strong><br />

Rooms with Swimming Pool & Laundry having <strong>to</strong>tal built-up area is 27,667.16<br />

sq. mtrs.<br />

4. Applicant has obtained Environmental Clearance for construction <strong>of</strong> the Hotel<br />

Building from the Env. Dept., GoM vide Letter No. SEAC-2011/CR.892/TC.2<br />

dtd. 13/03/2012.<br />

5. SRO, Nagpur-I has recommended grant <strong>of</strong> <strong>Consent</strong> <strong>to</strong> 1 st Operate.<br />

6. <strong>Consent</strong> <strong>to</strong> 1 st Operate may <strong>be</strong> granted after receipt <strong>of</strong> additional <strong>Consent</strong><br />

Fee <strong>of</strong> Rs. 13,400 /- as per Env. Dept., GoM’s revised <strong>Consent</strong> Fee G.R. dtd.<br />

25/08/2011.


CAC Item No. 28<br />

Name <strong>of</strong> the Industry : M/s. Western Coalfields Ltd.,<br />

Ukni (Deep) Opencast Mine,<br />

Village: Ukni, PO: Bhallar,<br />

Tal: Wani, Dist: Yavatmal.<br />

HOD Remarks:<br />

1. Applied for consent <strong>to</strong> Establish for expansion in coal production from 2.20 Million<br />

Ton/Annum <strong>to</strong> 3.50 Million Ton/Annum.<br />

2. Board has granted consent for Existing Coal Mine for production <strong>of</strong> 2.20 Million<br />

Ton/Annum which is valid up <strong>to</strong> 31.10.2014.<br />

3. Sub-Regional Officer, Chandrapur reported that mine lease boundary is about 0.544 km<br />

from notified river Wardha (A-II Class), thus not satisfying RRZ Policy.<br />

4. Public hearing for expansion for 2.20 MTPA <strong>to</strong> 3.5 MTPA was conducted on 10.08.2011.<br />

5. Capital Investment <strong>of</strong> the proposed expansion unit is Rs.319.96 Crores. <strong>Consent</strong> fee <strong>of</strong><br />

Rs.6,39,940/- is paid by the industry. However, industry required <strong>to</strong> submit the <strong>Consent</strong> <strong>to</strong><br />

Establish fee for increase in production <strong>of</strong> mineral 1.3 MTPA Rs. 5,2,000/- as per new GR<br />

dated 25.08.2011.<br />

6. Domestic Effluent-489.67 CMD. STP proposed <strong>to</strong> <strong>be</strong> provided. Treated effluent will <strong>be</strong><br />

disposed in river. Industrial Effluent-17186 CMD. Mine water will <strong>be</strong> discharged in <strong>to</strong> river.<br />

7. Fixed water sprinklers will <strong>be</strong> provided <strong>to</strong> coal handling plant and haul roads.<br />

Notified Wardha river (A-II Class) is about 0.544 km away from the proposed expansion<br />

unit, hence is not satisfying the RRZ Policy. <strong>Consent</strong> <strong>to</strong> Establish for expansion <strong>of</strong> coal mine<br />

may <strong>be</strong> refused.


CAC Item No. 29<br />

Name <strong>of</strong> the industry : M/s. Bridges<strong>to</strong>ne India Private Limited<br />

(Phase-II), Plot No. A-43,<br />

MIDC Chakan, Phase-II,<br />

Tal. Khed, Dist. Pune 410 501<br />

HOD Remarks:<br />

• Applied for consent <strong>to</strong> establish<br />

• Application received at SRO- Pune-II on dtd 13/02/2012 and at HQ on 19/04/2012.<br />

• Industry has obtained consent <strong>to</strong> establish for phase I on dated 04/01/2011<br />

• Industry located @ 3.0 KM away from A-II River Indrayani. Satisfy the distance criteria.<br />

• Generation <strong>of</strong> industrial effluent will <strong>be</strong> 660 CMD from Cooling, DM s<strong>of</strong>tening & boiler<br />

blow down for which proposed <strong>to</strong> provide Effluent treatment plant<br />

• Domestic effluent generation will <strong>be</strong> 105 CMD for which proposed <strong>to</strong> provide Sewage<br />

treatment plant<br />

• Total land available for the use <strong>of</strong> treated effluent is 48366 Sq.Mts<br />

• Industry has proposed <strong>to</strong> provide dust collec<strong>to</strong>r <strong>to</strong> carbon handling/charging section.<br />

• Hazardous will sent <strong>to</strong> CHWTSDF<br />

• RO Pune has recommended the case for grant <strong>of</strong> consent <strong>to</strong> establish by stipulating<br />

stringent condition Viz BOD-20 Mg/lit SS-10 Mg/lit and continuous ambient moni<strong>to</strong>ring<br />

system and at major source emission points<br />

• We may grant the consent <strong>to</strong> Establish for Phase-II with amalgamation <strong>of</strong> <strong>Consent</strong> <strong>to</strong><br />

Establish <strong>of</strong> Phase-I with condition <strong>to</strong> achieve BOD 30 mg/Ltr., 3 CAAQMS and 50 %<br />

effluent reused in the process.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 30<br />

Name <strong>of</strong> the industry : M/s. Precision Au<strong>to</strong>mation & Robotics (I) Ltd.,<br />

Gat No. 463 A, 463 B, 464, A/p. Dhangarwadi,<br />

Tal. Khandala, Dist. Satara.<br />

HOD Remarks:<br />

• Applied for consent <strong>to</strong> establish for expansion<br />

• Application received at SRO- Satara on dtd 05/12/2011 and at HQ on 02/04/2012.<br />

• Existing plant consent is valid up <strong>to</strong> 31/07/2012<br />

• Industry located @ 2.5 KM from AII River Nira. Satisfy the distance criteria.<br />

• Generation <strong>of</strong> industrial effluent will <strong>be</strong> 8 CMD (Existing 3.5 CMD). Industry proposed <strong>to</strong><br />

provide ETP.<br />

• SRO Satara reported that industry has discontinued the industrial effluent till expansion<br />

in completed<br />

• Generation <strong>of</strong> industrial effluent will <strong>be</strong> 4 CMD (existing 28 CMD ) for which industry has<br />

provided 80 CMD capacity STP in the existing unit<br />

• JVS result <strong>of</strong> not <strong>submitted</strong> by the industry <strong>of</strong> existing plant<br />

• Industry has proposed <strong>to</strong> provide dust collecting system with bag filter and a stack <strong>of</strong> 11<br />

mtr height <strong>to</strong> the powder coating booth, Stack <strong>of</strong> 4 meter height <strong>to</strong> the heat treatment<br />

section & stack <strong>to</strong> the D.G. Sets (4 Nos)<br />

• RO Pune recommended the case for grant <strong>of</strong> consent <strong>to</strong> establish for expansion by<br />

imposing condition <strong>to</strong>wards provision <strong>of</strong> VOC control System for paint booth section<br />

• We may grant consent <strong>to</strong> establish for expansion with condition <strong>of</strong> company Board<br />

Resolution as they have completed activity <strong>be</strong>fore C <strong>to</strong> E<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 31<br />

Name <strong>of</strong> the Industry: M/s. AAM India Manufacturing Corporation Pvt. Ltd.,<br />

Gat No. 787 & 788 Hanga, Tal: Parner,<br />

Dist: Ahmednagar.<br />

HOD Remarks:<br />

1. Existing unit having consent for production <strong>of</strong> Drive Heads 1901 Nos./Month & Gears-1088<br />

Nos./Month which was valid up <strong>to</strong> 31.03.2012.<br />

2. Now applied for consent <strong>to</strong> establish for expansion for the production <strong>of</strong> Drive Heads – 1100<br />

Nos./Month, Gears – 9900 Nos./Month, Axle – 8000 Nos./Month & Banjo – 8000<br />

Nos/Month.<br />

3. Total Capital investment <strong>of</strong> the industry is Rs.203.03 Crores (Existing Unit Capital<br />

Investment is Rs.63.11 Crores & Capital Investment <strong>of</strong> proposed expansion is Rs.140.72<br />

Crore). Industry has paid <strong>Consent</strong> <strong>to</strong> Establish fee <strong>of</strong> Rs.2,81,540/- as per new <strong>Consent</strong> fee<br />

GR dated 25.08.2012.<br />

4. Domestic Effluent – 6.0 CMD. Industry has Soak pit and Septic Tank Provided. Disposal on<br />

land for gardening. Industrial Effluent – 1.0 CMD, After primary treatment disposed on land<br />

for gardening.<br />

5. The proposed expansion unit in existing plant is located at 2.0 km from river Hanga.<br />

The Honga river is not notified. <strong>Consent</strong> <strong>to</strong> Establish for expansion <strong>to</strong> the said unit.


CAC Item No. 32<br />

Name <strong>of</strong> the industry : M/s. JSW Steel Ltd.<br />

Plot No. B-6, MIDC Tarapur,<br />

Navapur Road Boisar,<br />

Tal. Palghar, Dist. Thane<br />

HOD Remarks:<br />

• Applied for renewal <strong>of</strong> consent<br />

• Application received at SRO- Tarapur on dtd 29/02/2012 and at HQ on 26/04/2012.<br />

• Previous consent was valid up <strong>to</strong> 30/04/2012<br />

• Industry generating 450 M3/d <strong>of</strong> effluent for which Industry has provided effluent<br />

treatment plant with RO system<br />

• Sewage treatment Plant provided by industry for 92.0 CMD domestic effluent.<br />

• Fume extraction system followed by 2 nos <strong>of</strong> scrub<strong>be</strong>rs provided at pickling section<br />

• Fume extraction system followed by dust collec<strong>to</strong>r system attached <strong>to</strong> adequate height<br />

<strong>of</strong> stack provided <strong>to</strong> the furnace<br />

• Industry has <strong>submitted</strong> JVS analysis report dated 09/08/2011, 07/12/2011 & 15/03/2012.<br />

Which is under consented limit<br />

• Industry <strong>submitted</strong> the letter on dated 23/04/2012 & reported that they have<br />

commissioned operation <strong>of</strong> MEE on 22/04/2012<br />

• SRO-Tarapur-I recommended the case for renewal <strong>of</strong> consent.<br />

• The unit has installed MEE & commissioned on 23/04/2012. The JVS results are within<br />

consented limits. We may grant renewal <strong>of</strong> consent up<strong>to</strong> 30/04/2015.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 33<br />

Name <strong>of</strong> the industry : M/s. Force Mo<strong>to</strong>rs Ltd.,<br />

Mumbai-Pune Road, Akurdi,<br />

Pune 35<br />

HOD Remarks:<br />

• Applied for renewal <strong>of</strong> consent<br />

• Application received at SRO- Pune on dtd 31/01/2012 and at HQ on 12/04/2012<br />

• Previous consent was valid up <strong>to</strong> 31/03/2012<br />

• Industrial Effluent Generation is 200 CMD for which industry has provided 2 Nos effluent<br />

treatment plant<br />

• Domestic effluent generation is 720 CMD for which provided sewage treatment plant.<br />

• JVS analysis result on dated 24/01/2011,22/02/2012,23/03/2011, & 30/09/2011is under<br />

prescri<strong>be</strong>d limit<br />

• Total Land available for disposal <strong>of</strong> treated effluent is 9.65 hectares<br />

• Industry has provided double cham<strong>be</strong>red captive incinera<strong>to</strong>r, Wet scrub<strong>be</strong>r followed by<br />

stack <strong>of</strong> height 30 mtrs.<br />

• RO Pune reported that incinera<strong>to</strong>r provided for disposal <strong>of</strong> paint sludge need <strong>to</strong> <strong>be</strong><br />

s<strong>to</strong>pped <strong>be</strong>ing proximately <strong>to</strong> residential area.<br />

• SRO- PC issued letter <strong>to</strong> industry on dated 09/02/2012 for various non compliances<br />

observed.<br />

• RO Pune has recommended the case for grant <strong>of</strong> renewal <strong>of</strong> consent after receipt <strong>of</strong> the<br />

satisfac<strong>to</strong>ry reply <strong>of</strong> the letter issued by SRO<br />

• Industry not <strong>submitted</strong> the reply <strong>of</strong> the same<br />

• The industry has provided APC for paint booth. The land available for disposal <strong>of</strong><br />

effluent 920 M3/D is <strong>to</strong>tally inadequate. The incinera<strong>to</strong>r is not as per CPCB guidelines.<br />

We may issued SCN for refusal for non compliance.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 34<br />

Name <strong>of</strong> the industry : M/s. Bajaj Au<strong>to</strong> Ltd.,<br />

Plot No. A-1, MIDC Chakan,<br />

Mahalunge,Gaon, Tal. Khed, Dist. Pune<br />

HOD Remarks:<br />

• Applied for renewal <strong>of</strong> consent<br />

• Application received at SRO- Pune on dtd 04/02/2012 and at HQ on 02/04/2012<br />

• Previous consent was valid up <strong>to</strong> 31/03/2012<br />

• Industrial Effluent Generation is 440 CMD for which industry has provided 2 Nos effluent<br />

treatment plant<br />

• Domestic effluent generation is 480 CMD for which provided sewage treatment plant.<br />

• JVS analysis result on dated 16/06/2011,16/09/2011,20/10/2011,11/11/2011 is generally<br />

under prescri<strong>be</strong>d limit<br />

• Industry has provided air pollution control system <strong>to</strong> Boiler & PTCED Boiler & furnace<br />

• Industry provided 35 Stack <strong>to</strong> D.G. Set (Capacity 3187 KVAx2 Nos)<br />

• Scrub<strong>be</strong>r provided <strong>to</strong> paint Booth<br />

• Industry <strong>submitted</strong> B.G. <strong>of</strong> 5 Lakhs <strong>to</strong>wards operation & maintenance <strong>of</strong> ETP valid up <strong>to</strong><br />

23/01/2013.<br />

• RO Pune has recommended the case for grant <strong>of</strong> renewal <strong>of</strong> consent for period up <strong>to</strong><br />

31/03/2015 by Stipulating condition <strong>to</strong>wards provision <strong>of</strong> online moni<strong>to</strong>ring system at<br />

major source emission points and including CAQMS <strong>be</strong>ing located proximity <strong>to</strong><br />

residential area<br />

• We may grant the consent up<strong>to</strong> 31/013/2015 with condition <strong>of</strong> encashing Bank<br />

Guarantee as ETP standards are not achieved consistently and also take fresh BG <strong>of</strong><br />

Rs.5/- Lakhs.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 35<br />

Name <strong>of</strong> the industry: M/s. Apple Sponge And Power Ltd.,<br />

C-4, Five Star MIDC Industrial Area,<br />

Kagal, Kolhapur.<br />

HOD Remarks :<br />

• Applied for Renewal <strong>of</strong> consent for Sponge iron plant (existing)and <strong>Consent</strong> <strong>to</strong> first<br />

operate for Rolling Mill & Captive Power Plant.<br />

• Total C. I. is Rs. 130.54 crores. (Existing Sponge Iron plant Rs. 43.08 cr and Rolling<br />

mill & CPP Rs.87.46 cr).<br />

• Manufacturing :- I} Existing Plant<br />

• 1) Sponge Iron:- 6000 MT/M.<br />

2) MS Billets :- 3600 MT/M.<br />

II} First Operate<br />

1) Rolling Mill :- 6000 MT/M<br />

2) Captive Power Plant: 10 MW (WHRB- 4 MW & AFBC- 6 MW)<br />

• Obtained the Environmental Clearance for additional qty <strong>of</strong> Sponge iron plant,<br />

Induction furnace /Arc furnace, Rolling Mill and captive power plant-10 MW.<br />

• Provided ESP <strong>to</strong> rotary klin <strong>of</strong> sponge iron plant, Wet scrub<strong>be</strong>r <strong>to</strong> induction furnace<br />

and bag filters <strong>to</strong> s<strong>to</strong>ck house, collar discharge, iron ore crusher, coal crusher,<br />

product separation house.<br />

• Water sprinkling system near production area and internal roads.<br />

• Provided Continuous online moni<strong>to</strong>ring system for stack .<br />

• Provided CAAQMS in the fac<strong>to</strong>ry premises.<br />

• JVS results <strong>of</strong> AAQM for the parameter SPM are exceeding the prescri<strong>be</strong>d limits.<br />

And JVS results <strong>of</strong> Stack air moni<strong>to</strong>ring are within limit except parameter TPM in the<br />

month <strong>of</strong> July.<br />

• Submitted Environment Audit Statement for the year 2010-2011and cess returns are<br />

<strong>submitted</strong> Feb-2012.<br />

• Have <strong>submitted</strong> the BG <strong>of</strong> Rs. 3.0 lac as per last consent condition, which is valid<br />

up<strong>to</strong> 31/5/2012.<br />

• Rolling mill furnace is provided with dust collec<strong>to</strong>r.<br />

• Captive Power Plant is <strong>of</strong> 10 MW capacity,( from WHRB :- 4 MW & AFBC:- 6 MW).<br />

• Provided ESP <strong>to</strong> the AFBC with stack height <strong>of</strong> 60 mtrs.<br />

• D. M. plant waste water & cooling waste water, treated in collection cum<br />

neutralization tank & same recycled back.<br />

• SRO recommended the grant <strong>of</strong> Renewal <strong>of</strong> consent and first consent <strong>to</strong> operate.<br />

• We may place the case <strong>be</strong>fore CAC for approval.


CAC Item No. 36<br />

Name <strong>of</strong> the industry : M/s. Can Pack India Pvt. Ltd.<br />

H 14/1, MIDC,Waluj,<br />

Dist –Aurangabad.<br />

HOD Remarks :<br />

• Applied for consent <strong>to</strong> Establish.<br />

• Will manufacture glass bottles <strong>of</strong> various size for <strong>be</strong>verage industries.<br />

• Capital Investment is Rs.425.00 crores.<br />

• Industrial effluent will <strong>be</strong> 46 CMD, ETP will <strong>be</strong> provided. Proposal <strong>submitted</strong>. Further<br />

will <strong>be</strong> dispose <strong>to</strong> CETP.<br />

• Domestic effluent will <strong>be</strong> 48 CMD, STP will <strong>be</strong> provided, proposal <strong>submitted</strong>.<br />

• Will provide Furnace oil fired Furnaces 2 Nos.<br />

• 5 no <strong>of</strong> D. G. sets will amount <strong>to</strong> 1 MW generation.<br />

• Paid fees <strong>of</strong> Rs. 850000/- as per the new fees schedule.<br />

• RO Aurangabad has recommended the grant <strong>of</strong> consent <strong>to</strong> Establish.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 37<br />

Name <strong>of</strong> the Industry: M/s. Lloyds Metals & Energy Ltd.,<br />

Plot No.A 1 & 2, MIDC Ghugus,,<br />

Dist: Chandrapur.<br />

HOD Remarks:<br />

1. Industry is having two consent in the same premises. First is for 4 x 100 TPD Kiln which is<br />

valid up <strong>to</strong> 18.10.2011. Second one is for 500 TPD Kiln, Coal Washery and 25 MW Power<br />

generation which is valid u <strong>to</strong> 28.2.2012. Plain renewal with amalgamation <strong>of</strong> both consents.<br />

2. Total Capital investment <strong>of</strong> the industry is Rs.498.55 Crores. <strong>Consent</strong> fee <strong>of</strong> Rs.9,97,109/is<br />

paid for one year period as per new G.R. dated 25.08.2011.<br />

3. Regional Officer, Chandrapur reported that the industry has complied majority <strong>of</strong> directions<br />

except point no.4 & 7 i.e. installation <strong>of</strong> Ash Silo and disposal <strong>of</strong> solid waste. Hence, R.O.<br />

has forfeited the bank guarantee <strong>of</strong> Rs.5.0 Lakhs in the month <strong>of</strong> Decem<strong>be</strong>r, 2011.<br />

4. Regional Officer, Chandrapur reported that;<br />

i) Industry has installation one CAAQM station within premises in January, 2008.<br />

ii) Continuous Moni<strong>to</strong>ring Station (CMS) is also provided Sponge Iron stack and 25 MW<br />

Power Plant.<br />

iii) Construction <strong>of</strong> new ash silo is expected <strong>to</strong> complete by March, 2012.<br />

iv) Industry has improved housekeeping since previous visit.<br />

v) Industry has paid Cess payment <strong>of</strong> Rs.22,856/- on 17.1.2012 and Cess Return filed up<br />

<strong>to</strong> 31.1.2012.<br />

vi) Online environment statement for the year 2010-11 <strong>submitted</strong> by the industry.<br />

vii) From the analysis reports stack emission and ambient air quality levels are fluctuating<br />

and some time on higher side and hence industry shall improve operation and<br />

maintenance <strong>of</strong> pollution control system.<br />

viii) Char <strong>be</strong>neficiation plant is commissioned on January, 2011 and it is used as<br />

secondary fuel in AFBC boiler and hence conditions regarding use <strong>of</strong> char as fule may<br />

<strong>be</strong> incorporated.<br />

ix) Industry shall submit proposal for one additional CAAQMS as per consent condition.<br />

5. Legal Action: Writ Petition No.3501/2006 in Mumbai High Court, Nagpur Bench. The writ<br />

petition is pending for hearing.<br />

We may consider renewal <strong>of</strong> consent <strong>to</strong> operate with amalgamation <strong>of</strong> both consent for<br />

the period up<strong>to</strong> 31/10/2012.


CAC Item No. 38<br />

Name <strong>of</strong> the industry : M/s. Cummins Technologies India Ltd.,<br />

Plot No. B-3/1, Phaltan SEZ Industrial Area,<br />

Tal. Phaltan, Dist Satara<br />

HOD Remarks :<br />

• Applied for consent <strong>to</strong> establish<br />

• Application received at SRO- Satara on dtd 22/02/2012 and at HQ on 26/04/2012.<br />

• Industry located @ 4.0 KM away from A-II River Nira. Satisfy the distance criteria.<br />

• Generation <strong>of</strong> industrial effluent will <strong>be</strong> 15 CMD for which proposed <strong>to</strong> provide 30 CMD<br />

capacity Effluent treatment plant<br />

• Domestic effluent generation will <strong>be</strong> 130 CMD for which proposed <strong>to</strong> provide 210 CMD<br />

Capacity Sewage treatment plant<br />

• Total land available for the use <strong>of</strong> treated effluent is 52800 Sq.Mts<br />

• Industry has proposed <strong>to</strong> provide chimney <strong>of</strong> height 3.5 mtr each <strong>to</strong> 4 nos. <strong>of</strong> test cell &<br />

18 mtr chimney <strong>to</strong> paint boot & adequate height <strong>of</strong> chimney <strong>to</strong> D.G. sets with acoustic<br />

enclosures<br />

• Industry obtained Mem<strong>be</strong>rship <strong>of</strong> CHWTSDF Ranjangaon<br />

• RO Pune has recommended the case for grant <strong>of</strong> consent <strong>to</strong> establish by imposing the<br />

condition <strong>to</strong>wards provision <strong>of</strong> APC <strong>to</strong> the test cells, Voc control system for paint booth &<br />

required modification in STP & ETP design due <strong>to</strong> over design capacity by imposing<br />

appropriate Bank guarantee<br />

• We may grant <strong>of</strong> consent <strong>to</strong> establish<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.


CAC Item No. 39<br />

Name <strong>of</strong> industry: M/s. Mazgaon Dock Ltd. ,<br />

Dock Yard Road, Mazgaon Mumbai.<br />

HOD Remarks :<br />

• Applied for renewal <strong>of</strong> <strong>Consent</strong> <strong>to</strong> operate with expansion.<br />

• Application received at SRO on 27/02/2012 and at HQ on 07/05/2012<br />

• Capital investment <strong>of</strong> the industry is 169.18 Crs.<br />

• Industry has provided ETP consisting <strong>of</strong> primary treatment followed by tertiary treatment,<br />

which is inadequate considering physical segregation <strong>of</strong> high COD & metal <strong>be</strong>aring<br />

system, which requires up gradation <strong>of</strong> existing <strong>of</strong> ETP.<br />

• Industry has provided Air Pollution Control System in form <strong>of</strong> suction hood.<br />

• JVS analysis results dated 28/06/2011, & 22/09/2011 are exceeding consent limit.<br />

• RO Mumbai, recommended renewal <strong>of</strong> consent <strong>to</strong> operate with Bank Guarantee for up<br />

gradation <strong>of</strong> ETP, STP & Air Pollution Control System.<br />

• ETP is not operated regularly.<br />

• Dry & wet Dock construction started without CRZ clearance & C <strong>to</strong> E from MPC Board.<br />

• More than 10% increase in investment made without permission i.e C.I. Increased from<br />

143.27 Crs <strong>to</strong> 169.18 Crs.<br />

• Recommended for SCN for refusal <strong>of</strong> consent application.


CAC Item No. 40<br />

Name <strong>of</strong> industry : M/s. Reliance Infocomm Infrastructure Pvt. Ltd.,<br />

TTC Industrial Area DAKC Koparakharine<br />

HOD Remarks:<br />

• Applied for renewal <strong>of</strong> <strong>Consent</strong> <strong>to</strong> operate.<br />

• Application received at SRO on 30/01/2012 and at HQ on 08/05/2012<br />

• <strong>submitted</strong> application for renewal <strong>of</strong> consent for IT Project, on plot area 5,39,349 sq mtrs<br />

& <strong>to</strong>tal built up area <strong>of</strong> 2,36,195 sq. mtrs including utilities <strong>of</strong> residential project &<br />

services as occupancy certificate <strong>of</strong> local body.<br />

• Capital investment <strong>of</strong> the industry is 1886.5035646 Crs. Earlier capital <strong>of</strong> investment<br />

<strong>of</strong> industry was 1836.038 Crs. Industry has increased its capital investment by 50 Crs.<br />

• Industry has applied for change in domestic effluent quantity from 744 CMD <strong>to</strong> 930<br />

CMD, RO Navi Mumbai reported <strong>to</strong> update /amend the figure <strong>of</strong> Domestic effluent<br />

quantity 930 CMD.<br />

• As reported by RO Navi Mumbai, industry has provided STP <strong>of</strong> the Capacity 2000 CMD<br />

for treatment <strong>of</strong> domestic effluent qty 930 CMD.<br />

• SRO NM-I has collected JVS samples <strong>of</strong> STP outlet, as per analysis reports <strong>of</strong> STP<br />

samples all parameters are within consented limits.<br />

• Industry has <strong>submitted</strong> Environmental Statement in Form V <strong>to</strong> MPC Board.<br />

• Industry has <strong>submitted</strong> Water Cess paid up <strong>to</strong> April 2011 & return filed up <strong>to</strong> Sep 2011.<br />

• RO , Navi Mumbai recommended case for grant <strong>of</strong> renewal <strong>of</strong> consent with correction in<br />

domestic effluent quantity <strong>to</strong> 930 CMD, up <strong>to</strong> period 31/03/2014<br />

• Recommended for renewal <strong>of</strong> consent after confirmation on Capital investment.


CAC Item No. 41<br />

Name <strong>of</strong> industry : M/s. Adhiraj Construction Pvt. Ltd.,<br />

MMRDA ( Rental Housing Scheme) residential <strong>to</strong>wnship project – Adhiraj<br />

Upscale , Plot Survey no: 64,67,68,69,70,71,72,76,77,86,<br />

88,89,90,91&99, vill: Rohinan , Tal Panvel Dist : Raigad<br />

HOD Remarks:<br />

• Applied for consent <strong>to</strong> establish<br />

• Application received at SRO on 13/02/2012 and at HQ on 24/04/2012<br />

• <strong>submitted</strong> application for C <strong>to</strong> E for residential <strong>to</strong>wnship project<br />

• Capital investment <strong>of</strong> the industry is Rs. 900 Crs<br />

• Plot Area : 11,47,700 M 2 & Total Construction Area : 7,21,399 M 2<br />

• Project proponent has obtained EC vide No: SEAC 2010/CR.698/TC.2 date:<br />

28/06/2011 & amended EC dt 03/04/2012 for :- Plot Area : 11,47,700 M 2 & Total<br />

Construction Area : 7,21,399 M 2<br />

• RO Raigad recommended case for grant for C <strong>to</strong> E .<br />

• Recommended for grant <strong>of</strong> <strong>Consent</strong> <strong>to</strong> Establish up <strong>to</strong> commissioning <strong>of</strong> project.


CAC Item No. 42<br />

Name <strong>of</strong> the industry: M/s. Kanhan River Project (Kochi Barrage),<br />

Viil: Kochi, Tal: Saoner, Dist. Nagpur<br />

HOD Remarks:<br />

• Applied for consent <strong>to</strong> establish<br />

• Submitted application for C <strong>to</strong> E for construction <strong>of</strong> Conreate Barrgae, across Kanhan<br />

River.<br />

• Capital investment <strong>of</strong> the industry is Rs. 26225.3 lacs<br />

• Waste water generation: 4.5 m3/day, septic tank soak pit proposed.<br />

• Solid waste generation: Nil<br />

• Project proponent has obtained Environmental Clearance from MoEF vide no: J-<br />

1201/15/2008-iA-I dt: 09/02/2012<br />

• The project does not attract Provisions <strong>of</strong> the RRZ Policy 2009.<br />

• SRO Nagpur recommended case for grant for C <strong>to</strong> E.<br />

• Recommended for grant <strong>of</strong> <strong>Consent</strong> <strong>to</strong> Establish up <strong>to</strong> commissioning <strong>of</strong> project or 5<br />

five years Period with BG <strong>of</strong> 10 lakhs for compliance <strong>of</strong> consent conditions.


CAC Item No. 43<br />

Name <strong>of</strong> Industry : M/s. Reliance Industries Ltd. (Expansion),<br />

HOD Remarks :-<br />

1. Applied 1 st <strong>Consent</strong> <strong>to</strong> Operate for Expansion.<br />

Village Dahali, Tal. – Mouda, Dist. Nagpur<br />

2. Drawing <strong>of</strong> Textured Yarn from POY Intermediate<br />

3. Existing consent tis valid up <strong>to</strong> 31.05.2013 & <strong>Consent</strong> <strong>to</strong> Establish for expansion was<br />

granted on 13.03.2012.<br />

4. Total C.I. is 225.45 Cr. (Existing – 218 Cr. + Proposed – 7.45 Cr.)<br />

5. We may grant consent <strong>to</strong> 1 st Operate for Expansion.


CAC Item No. 44<br />

Name <strong>of</strong> Industry : M/s. Lokmangal Mauli SSK Ltd.,<br />

Village Lihara (Khurd), Tq. Lohara,<br />

Dist. Osmanabad.<br />

HOD Remarks :<br />

1. Applied for <strong>Consent</strong> <strong>to</strong> Establish Sugar and Co-gen.<br />

2. Sugar industry <strong>of</strong> 6000 TCD and Co-Gen 30 MW.<br />

3. Environmental clearance is required.<br />

4. SCN was issued <strong>to</strong> industry as the project proponent had started work <strong>of</strong> development<br />

activity <strong>be</strong>fore obtaining <strong>Consent</strong> <strong>to</strong> Establish.<br />

5. RO reported that industry have s<strong>to</strong>pped the development activity.<br />

6. RO Recommended for grant <strong>of</strong> consent <strong>to</strong> Establish with subject <strong>to</strong> obtain Environmental<br />

Clearance from MoEF.<br />

7. We may Grant <strong>Consent</strong> <strong>to</strong> Establish.


CAC Item No. 45<br />

Name <strong>of</strong> Industry : M/s. Dr. Babasaheb Am<strong>be</strong>dkar SSK Ltd.,<br />

HOD Remarks :<br />

Arvind nagar, Post Keshgaon, Dist. Osmanabad.<br />

1. Applied for <strong>Consent</strong> <strong>to</strong> Establish Sugar and Co-gen.<br />

2. Sugar industry <strong>of</strong> 2500 TCD and Co-Gen 16 MW.<br />

3. Environmental clearance is required for Expansion.<br />

4. Total C.I. including expansion is 157.75 Cr. ( Sugar - 43.18 Cr. +Co-gen- 30.03 & Distillery<br />

– 21.44 Cr. & Proposed – 63.10 Cr. )<br />

5. Effluent generation is 120 CMD including cooling <strong>to</strong>wer blow down for expansion.<br />

6. Proposed Secondary & Tertiary treatment <strong>to</strong> effluent generated. Treated effluent is used for<br />

gardening. Land available 223 acres.<br />

7. Recommended for grant <strong>of</strong> consent <strong>to</strong> Establish with Expansion, subject <strong>to</strong> obtain<br />

Environmental Clearance from MoEF.<br />

8. We may Grant <strong>Consent</strong> <strong>to</strong> Establish.


CAC Item No. 46<br />

Name <strong>of</strong> industry : M/s. Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd.<br />

Gat No. 630, A/p. Warananagar,<br />

Tal: Panhala, Dist: Kolhapur.<br />

HOD Remarks :<br />

• Applied for <strong>Consent</strong> <strong>to</strong> operate.<br />

• It is power generating Plants.<br />

• Application received at SRO on 14.03.2012 and at HQ on 19.04.2012.<br />

• Industry has applied for C <strong>to</strong> O for electricity- 44 MW.<br />

• Domestic effluent generation is 7 CMD. I.E. generation is 640 CMD<br />

• Industry has provided ETP comprising primary & Secondary treatment treated effluent<br />

use on land for gardening<br />

• Industry has provided 02 Nos. ESP <strong>to</strong> Boiler as a APC<br />

• Industry has obtained Environmental Clearance from Govt. <strong>of</strong> Maharashtra dated<br />

10.06.2009 for Electricity- 44 MW<br />

• The industry has not installed continuous online stack moni<strong>to</strong>ring system<br />

• SRO recommended the case for grant <strong>of</strong> consent <strong>to</strong> operate with Bank Guarantee<br />

• Recommended for grant <strong>of</strong> consent <strong>to</strong> operate with Bank Guarantee <strong>of</strong> Rs. 5 Lakh for<br />

providing continuous online moni<strong>to</strong>ring system in 4 month.


CAC Item No. 47<br />

Name <strong>of</strong> industry : M/s. Eurotex Industries & Exports Ltd<br />

Plot No. E-23, MIDC Gokul Shirgaon,<br />

Dist- Kolhapur<br />

HOD Remarks :<br />

• Applied for Renewal <strong>of</strong> consent<br />

• Application received at SRO on 26.3.2012 and at HQ on 21.4.2012.<br />

• Domestic effluent generation is 70 CMD. I.E. generation is 50 CMD<br />

• Industry has provided upflow anaerobic filter unit<br />

• The treated industrial effluent Partly recycle & remaining used on land for<br />

gardening/irrigation.<br />

• Industry has provided dust collection system <strong>to</strong> the carding & combing section<br />

• For domestic effluent industry has provided STP<br />

• Previous consent granted with industrial effluent 320 CMD. Industry has <strong>submitted</strong><br />

revised water budget. As per this the industrial effluent is reduce i.e. 50 CMD<br />

• SRO Kolhapur has recommended for renewal <strong>of</strong> consent up<strong>to</strong> 31.03.2014<br />

• Recommended for renewal <strong>of</strong> consent.


CAC Item No. 48<br />

Name <strong>of</strong> industry : M/s. Tessitura Monti India (P) Ltd.,<br />

Gat No-147, Vill- Tamgaon,<br />

Karveer, Dist- Kolhapur<br />

HOD Remarks :<br />

• Applied for Renewal <strong>of</strong> two consent with amalgamation for 6 MW Electricity.<br />

• It is power generating Plants.<br />

• Application received at SRO on 02.03.2012 and at HQ on 12.04.2012.<br />

• Industry has applied for C <strong>to</strong> R for electricity- 06 MW.<br />

• Domestic effluent generation is Nil CMD. I.E. generation is 68 CMD<br />

• Industry has provided Primary ,Secondary & tertiary treatment ETP ( Existing textile unit<br />

ETP)<br />

• The treated industrial effluent is use for gardening/Irrigation. Total land available is 126<br />

Acre.<br />

• Industry has obtained Environmental Clearance for 3 MW & 5 MW Electricity<br />

• Industry is a mem<strong>be</strong>r <strong>of</strong> CHWTSDF for disposal <strong>of</strong> Hazardous waste<br />

• SRO Kolhapur has recommended for renewal <strong>of</strong> consent <strong>to</strong> operate with amalgamation<br />

• Recommended for consent <strong>to</strong> renewal with amalgamation with earlier textile consent<br />

which is valid up<strong>to</strong> 31.12.2012.


CAC Item No. 49<br />

Name <strong>of</strong> industry : M/s. Raymond Zambaiti Ltd.,<br />

Plot No. T-1, Five Star Indl. Estate,<br />

Kagal, Dist- Kolhapur<br />

HOD Remarks :<br />

• Applied for Renewal <strong>of</strong> consent with 1 st consent <strong>to</strong> operate ( Expansion)<br />

• It is Yarn & Textile Processing Unir<br />

• Application received at SRO on 26.03.2012 and at HQ on 21.04.2012.<br />

• Domestic effluent generation is 130 CMD. I.E. generation is 2800 CMD<br />

• Industry has provided Primary ,Secondary treatment ETP<br />

• The treated industrial effluent is send <strong>to</strong> CETP for further treatment.<br />

• The JVS results dated 20.09.2011except TDS, 20.10.2011 are within limit & 30.11.2011<br />

& 30.12.2011 are marginally exceeding in respect <strong>of</strong> BOD & COD<br />

• Industry has provided mechanical dust collec<strong>to</strong>r & Bag Filter <strong>to</strong> Boiler & Thermopack as<br />

a APC.<br />

• Industry is mem<strong>be</strong>r <strong>of</strong> CHWTSDF for disposal <strong>of</strong> Hazardous waste<br />

• Industry has <strong>submitted</strong> Environment Statement for Year 2010-2011<br />

• Industry has change name fro. Raymond Zambaiti Pvt Ltd <strong>to</strong> Raymond Zambaiti Ltd for<br />

which industry has <strong>submitted</strong> certificate <strong>of</strong> Registrar <strong>of</strong> Companies. Mumbai<br />

• Industry has <strong>submitted</strong> Bank Guarantee <strong>of</strong> Rs. 05 Lakh <strong>to</strong>wards O & M <strong>of</strong> ETP valid up<strong>to</strong><br />

April-2011.<br />

• Industry has paid Cess return up<strong>to</strong> Feb -2012<br />

• SRO, Kolhapur has recommended for grant <strong>of</strong> consent up<strong>to</strong> 31.03.2015<br />

• Recommended for grant <strong>of</strong> consent with expansion with encash the previous Bank<br />

Guarantee <strong>of</strong> Rs. 05 Lakh & taking fresh Bank Guarantee <strong>of</strong> RS. 10 Lakh.


CAC Item No. 50<br />

Name <strong>of</strong> industry : M/s.Shri Dudhganga Vedganga SSK Ltd,<br />

Bidri(Mouninagar),Tal-Kagal,<br />

Dist- Kolhapur<br />

HOD Remarks :<br />

• Applied for Renewal <strong>of</strong> consent<br />

• It is Sugar Unit<br />

• Application received at SRO on 11.4.2012 and at HQ on 04.05.2012.<br />

• Domestic effluent generation is 60 CMD. I.E. generation is 450 CMD<br />

• Industry has provided Primary ,Secondary treatment ETP<br />

• The treated industrial effluent is used on land for irrigation. Land available for disposal <strong>of</strong><br />

treated effluent is 88 Acres.<br />

• Industry has provided 5 Nos. <strong>of</strong> boiler with Multi Cyclone type <strong>of</strong> fly ash arres<strong>to</strong>r with 2<br />

Nos. <strong>of</strong> common stack <strong>of</strong> height 32 Mtrs<br />

• The industry has not provided 30 days s<strong>to</strong>rage tank as per CREP guidelines<br />

• Industry has not dismantled the Kachha lagoons<br />

• JVS results dated 12.1.2012 are exceeding the limit as per consented parameter<br />

• SRO has recommended for grant <strong>of</strong> renewal <strong>of</strong> consent <strong>to</strong> operate up<strong>to</strong> 31.12.2011<br />

obtaining appropriate Bank Guarantee<br />

• Recommended for SCN for refusal as industry does not comply with CREP norms


CAC Item No. 51<br />

Name <strong>of</strong> Industry : M/s. Lenzing Modi Fi<strong>be</strong>rs India Pvt Ltd.<br />

Plot No M-1 & M-2, Additional MIDC ,<br />

Patalganga, Dist – Raigad<br />

HOD Remarks :<br />

1. Application received at RO Raigad 07/04/2012<br />

2. Industry representation made on dated 17/04/2012 <strong>be</strong>fore Hon’ble<br />

Chairman <strong>of</strong> the Board.<br />

3. Application recd at HQ 07/05/2012<br />

4. Product- Viscose Staple fi<strong>be</strong>r, Qty- 6667 MT/M<br />

5. C <strong>to</strong> E given in Oct 2005, exempting EC as earlier NOC was given prior <strong>to</strong> 1994<br />

notification.<br />

6. Subsequently, C <strong>to</strong> E was given in June 2009 & Oct 2011 for change in name /<br />

plot addition.<br />

7. There was no expiry clause in C To E or Amendment. Industry has now applied<br />

for EC.<br />

8. SRO has issued notice <strong>to</strong> the industry for fresh application as 5 yrs <strong>of</strong> validity <strong>of</strong><br />

first C <strong>to</strong> E i.e. 2005 is over.<br />

9. Industry has represented against that and mentioned that, this 5 yrs conditions<br />

has not <strong>be</strong>en mentioned in C To E or amendment granted <strong>to</strong> them.<br />

10. Now industry has <strong>submitted</strong> a fresh application for C <strong>to</strong> E & also requested <strong>to</strong><br />

withdrawal and return <strong>of</strong> fees.<br />

11. SRO has reported only leveling and compound wall work is in progress.<br />

12. SRO has remarked that suitable decision may <strong>be</strong> taken at HQ.<br />

This may <strong>be</strong> placed <strong>be</strong>fore CAC for policy decision regarding refund <strong>of</strong> consent<br />

fees and validity <strong>of</strong> C <strong>to</strong> E.


CAC Item No. 52<br />

Name <strong>of</strong> the Industry : M/s. Sandoz Pvt. Ltd.,<br />

Plot No L-1, Addl.MIDC,<br />

Mahad Dist Raigad.<br />

HOD Remarks :<br />

• Application recd <strong>to</strong> RO Raigad 12/03/2012.<br />

• Application recd at HQ on 07/04/2012.<br />

• Existing unit, Mfg <strong>of</strong> Bulk drugs. Valid consent up<strong>to</strong> 30/06/2015.<br />

• Now applied for additional four products with reduction in existing products quantity &<br />

maintaining no increase in <strong>to</strong>tal production quantity & effluent quantity.<br />

• Existing I.E. – 877 CMD, proposed Nil. D.E. – 50 CMD. Primary, secondary & Tertitary<br />

treatment provided. Disposal – Reuse/ CETP.<br />

• Industry has not <strong>submitted</strong>, “No increase in pollution load” certificate from reputed<br />

institute.<br />

• Capital investment certificate is not certified by C.A. Envt statement,HW return in Form<br />

IV, latest JVS reports are not <strong>submitted</strong>.<br />

• RO Raigad has recommended for grant <strong>of</strong> consent for addl four products subject <strong>to</strong> pay<br />

consent fee on <strong>to</strong>tal investment & nil discharge <strong>to</strong> CETP.<br />

We may call “no increase in pollution load” certificate/ self assessment pr<strong>of</strong>orma<br />

& C.A certificate, Envt statement, JVS reports.


CAC Item No. 53<br />

Name <strong>of</strong> the Industry: M/s. Jubilant Life Science Ltd.,<br />

Village Nimbut-Nira, Tal-Baramati,<br />

Dist-Pune<br />

HOD Remarks :<br />

• Application recd <strong>to</strong> RO Pune 02/01/2012.<br />

• Application recd at HQ on 03/03/2012.<br />

• Mfg <strong>of</strong> chemicals.<br />

• The industry location is in RRZ restricted area (Nira river A-IV Zone)<br />

• In the same premises industry has holding 5 consents for various products Existing I.E.<br />

– 1804 CMD, proposed IE-163. Total I.E. 1967 CMD.<br />

• Earlier board has granted consent <strong>to</strong> establish in 22/08/2008 and accordingly industry<br />

has obtained EC from MoEF. Now Industry has applied Phase-wise consent <strong>to</strong> 1 st<br />

Operate only for the mfg <strong>of</strong> acetic anhydride 125 MT/Day with IE 163 CMD.<br />

• RO Pune has reported compliance <strong>of</strong> existing industries and recommended for 1 st<br />

Operate with amalgamation <strong>of</strong> existing consent.<br />

• Board has already granted C <strong>to</strong> E and now the application is for consent <strong>to</strong> 1 st operate.<br />

• Case was discussed in CAC meeting held on 16/04/2012 and it was decided <strong>to</strong> verify the<br />

pollution load, applicability <strong>of</strong> RRZ policy reverts back <strong>to</strong> CAC.<br />

• Accordingly, industry has <strong>submitted</strong> details about effluent treatment and its disposal<br />

method for achieving ZERO discharge for proposed products, which seems <strong>to</strong> <strong>be</strong> in<br />

order.<br />

We may consider the case for short period for verification <strong>of</strong> industry say about<br />

achieving ZERO discharge with amalgamation <strong>of</strong> existing consent issued for chemical<br />

plant.