CAC Item No. 18<br />

Name <strong>of</strong> the Industry : M/s. Ballarpur Industries Ltd., (Ashti),<br />

Tal. Charmorshi, Dist.- Gadchiroli<br />

HOD Remarks:<br />

• Applied for the Renewal <strong>of</strong> <strong>Consent</strong> for production <strong>of</strong> Writing and printing paper<br />

(White) – 5000 T/M. (based on readymade pulp & without bleaching)<br />

• Application received at SRO <strong>of</strong>fice on dt.09/12/2011 and at HQ on dt. 07/04/2012.<br />

• Capital Investment <strong>of</strong> the Industry is Rs. 310.20 Crs.<br />

• Industrial effluent generation shown is reduced <strong>to</strong> the tune <strong>of</strong> 5500 CMD against<br />

the previous consented quantity <strong>of</strong> 6500 CMD.<br />

• Domestic effluent is 500 CMD <strong>to</strong>wards the previous consented quantity <strong>of</strong> 300<br />

CMD.<br />

• ETP <strong>of</strong> capacity 6000 CMD with secondary treatment is provided.<br />

• JVS results are provided which are within the consented limits.<br />

• ESP is provided as an APCS boiler.<br />

• As per the decision <strong>of</strong> the CAC meeting dt.16.04.2012, SCN was issued vide letter<br />

dt. 27.04.2012 <strong>to</strong> the Industry for Non Submission <strong>of</strong> BG, not providing adequate<br />

APC system and non compliance <strong>of</strong> consent conditions.<br />

• Regional Officer Chandrapur vide letter dt.03.05.2012 reported that<br />

a) The said unit was visited on 26.04.2012.<br />

b) Water sprinklers are provided at coal s<strong>to</strong>ck yard.<br />

c) The work <strong>of</strong> Installation <strong>of</strong> dust collec<strong>to</strong>r at crushing unit, ash siloes were in<br />

progress.<br />

d) Industry has <strong>submitted</strong> BG <strong>of</strong> Rs. 50,000/- valid up<strong>to</strong> 31/03/2013.<br />

• Now Industry has paid / <strong>submitted</strong> BG <strong>of</strong> Rs. 50000 as per the directions issued.<br />

• The dust collec<strong>to</strong>r installation is in progress as per RO report.<br />

• We may grant Renewal with BG <strong>of</strong> Rs. 5.0 Lakhs as per the matrix.