CAC Item No. 53<br />

Name <strong>of</strong> the Industry: M/s. Jubilant Life Science Ltd.,<br />

Village Nimbut-Nira, Tal-Baramati,<br />

Dist-Pune<br />

HOD Remarks :<br />

• Application recd <strong>to</strong> RO Pune 02/01/2012.<br />

• Application recd at HQ on 03/03/2012.<br />

• Mfg <strong>of</strong> chemicals.<br />

• The industry location is in RRZ restricted area (Nira river A-IV Zone)<br />

• In the same premises industry has holding 5 consents for various products Existing I.E.<br />

– 1804 CMD, proposed IE-163. Total I.E. 1967 CMD.<br />

• Earlier board has granted consent <strong>to</strong> establish in 22/08/2008 and accordingly industry<br />

has obtained EC from MoEF. Now Industry has applied Phase-wise consent <strong>to</strong> 1 st<br />

Operate only for the mfg <strong>of</strong> acetic anhydride 125 MT/Day with IE 163 CMD.<br />

• RO Pune has reported compliance <strong>of</strong> existing industries and recommended for 1 st<br />

Operate with amalgamation <strong>of</strong> existing consent.<br />

• Board has already granted C <strong>to</strong> E and now the application is for consent <strong>to</strong> 1 st operate.<br />

• Case was discussed in CAC meeting held on 16/04/2012 and it was decided <strong>to</strong> verify the<br />

pollution load, applicability <strong>of</strong> RRZ policy reverts back <strong>to</strong> CAC.<br />

• Accordingly, industry has <strong>submitted</strong> details about effluent treatment and its disposal<br />

method for achieving ZERO discharge for proposed products, which seems <strong>to</strong> <strong>be</strong> in<br />

order.<br />

We may consider the case for short period for verification <strong>of</strong> industry say about<br />

achieving ZERO discharge with amalgamation <strong>of</strong> existing consent issued for chemical<br />

plant.