CAC Item No. 02<br />

Name <strong>of</strong> the Industry: M/s. The Leela Kempinski Sahar,<br />

Plot No. 1407(pt), 1405(pt), 1404(pt),<br />

Sahar, Andheri(E), Mumbai.<br />

HOD Remarks:<br />

a. Applied for grant <strong>of</strong> Renewal <strong>of</strong> consent for hotel activity including 395 rooms<br />

including lodging activity.<br />

b. Application received at SRO on 21.10.2011 and at HQ on 07.01.2012.<br />

c. Previous consent was valid up<strong>to</strong> 31.08.2011.<br />

d. The case was discussed during CAC meeting held on 23.01.2012 and during<br />

the meeting, it was decided <strong>to</strong> issue SCN for refusal <strong>of</strong> consent as industry has<br />

not replied <strong>to</strong> letter issued by the SRO on 11.11.2011. SCN issued on<br />

06.02.2012 and industry has <strong>submitted</strong> the reply on 27.02.2012 & 03.04.2012,<br />

wherein mentioned that C.I. mentioned is found reduced <strong>to</strong> previous year is due<br />

<strong>to</strong> fluctuation <strong>of</strong> the foreign exchange rate <strong>of</strong> the assets purchased under foreign<br />

loans. They are ready <strong>to</strong> pay the requisite consent fees. Current year C.I. is Rs.<br />

318.34 Crs. Therefore, File was referred <strong>to</strong> CAO for verification <strong>of</strong> point no. (a)<br />

& (b) and he remarked that C.I. shown in schedule <strong>of</strong> fixed assets <strong>of</strong> balance<br />

sheet do not match with <strong>to</strong>tal gross block <strong>of</strong> fixed asset shown in CA-certificate.<br />

e. Further, it was discussed during CAC meeting held on 16.04.2012 and decided<br />

<strong>to</strong> grant consent after CI verification by CAO.<br />

f. Accordingly, file was again referred <strong>to</strong> CAO on 20.04.2012 and he asked <strong>to</strong> call<br />

Balance Sheet from industry <strong>to</strong> verify Gross Block <strong>of</strong> Fixed Assets. After<br />

verification <strong>of</strong> CA certificate <strong>of</strong> Multiple unit, it is reflect that C.I. in fixed assets in<br />

particularly building, land and furniture fixture got reduced. Gross block <strong>of</strong> fixed<br />

assets never reduce in value in normal course <strong>of</strong> business. Hence, said details<br />

were called from industry on 27.04.2012 and 03.05.2012, but they have not<br />

<strong>submitted</strong> the reply till date.<br />

g. <strong>Consent</strong> may <strong>be</strong> refused due <strong>to</strong> non-submission <strong>of</strong> Balance Sheet details.