CAC Item No. 22<br />

Name <strong>of</strong> the Industry : M/s. Bhima SSK Ltd., (Sugar Unit),<br />

Madhukarnagar, -Patas,<br />

Tal. Daund, Dist. Pune<br />

HOD Remarks :<br />

• Applied for <strong>Consent</strong> <strong>to</strong> Operate (Renewal).<br />

• Application received at SRO on 20.03.2012 and at HQ on 02.04.2012.<br />

• Industrial effluent generation is 580 CMD and D.E is 80 CMD.<br />

• ETP provided with secondary treatment and SDB.<br />

• Dust collec<strong>to</strong>r is provided <strong>to</strong> 5 nos. <strong>of</strong> Boilers.<br />

• The application was discussed in the CAC meeting dt. 16.04.2012.<br />

• As per the decision <strong>of</strong> the CAC meeting SCN for the refusal <strong>of</strong> the consent was issued<br />

vide letter dt. 27.04.2012 for discharging the effluent in<strong>to</strong> Bhima River, JVS results are<br />

exceeding the norms and non compliance <strong>of</strong> the directions issued by the Board<br />

• Industry has replied vide letter dt. 06.05.2012 that Industries sugar ETP was old and<br />

aeration tank drain valve failed and hence the effluent went out side the fac<strong>to</strong>ry<br />

premises, S<strong>to</strong>pped the discharge <strong>of</strong> the effluent immediately and replaced the drain<br />

valve, Industry has s<strong>to</strong>pped the production on 04.04.2012, The proposal <strong>of</strong> the up<br />

gradation <strong>of</strong> ETP is received from Vasantdada Sugar Institute, Upgradation <strong>of</strong> the ETP<br />

will <strong>be</strong> done in this <strong>of</strong>f-season.<br />

• Closure was issued on 26.03.2012 and Industry has s<strong>to</strong>pped production on 04.04.2012.<br />

• Sugar ETP was <strong>to</strong>o old and valve was failed and untreated effluent went outside the<br />

premises.<br />

• Industry is regular defaulter.<br />

• We may refuse the <strong>Consent</strong>.