CAC Item No. 21<br />

HOD Remarks :-<br />

Name <strong>of</strong> Industry : M/s. Ruchi Soya Industries Ltd.,<br />

Savroli- Kharpada,<br />

Road Isam<strong>be</strong>, Khalapur,<br />

Dist. – Raigad.<br />

1. Applied for C <strong>to</strong> O for expansion and amalgamation with existing <strong>Consent</strong>.<br />

Patalganaga,<br />

2. Based on details <strong>submitted</strong> and decision <strong>of</strong> CAC dated 02.03.2012, SCN for refusal was<br />

issued.<br />

3. The industry has <strong>submitted</strong> their representation <strong>to</strong> Board on 21.03.2012 and justified that<br />

from expansion no effluent generated except occasional washings <strong>of</strong> floor<br />

4. Case was placed in CAC dated 16.04.2012 and decided <strong>to</strong> call report <strong>of</strong> RO, Raigad in<br />

person on 17.04.201<br />

5. RO, Raigad <strong>submitted</strong> report on 17.04.2012and finding are as <strong>be</strong>low:a.<br />

The ETP <strong>of</strong> existing production was upgraded<br />

b. Seepage from s<strong>to</strong>rage tank <strong>of</strong> ETP finding is way <strong>to</strong> Patalganga River.<br />

c. The upgraded ETP is not yet commissioned.<br />

d. The results <strong>of</strong> treated effluent are exceeding the prescri<strong>be</strong>d standards.<br />

e. The production in C <strong>to</strong> E was equal <strong>to</strong> C <strong>to</strong> O valid consent (i.e. doubled)<br />

f. H.W. quantities are increased<br />

g. Air Pollution / Emission also increased.<br />

6. Grant C <strong>to</strong> O with amalgamation and obtain B.G. <strong>of</strong> Rs. 10 lakh for Nill effluent generation.<br />

Also we may obtain assurance / put condition in C <strong>to</strong> O that there should not <strong>be</strong> increase in<br />

effluent quantity from expansion.<br />

7. We may also obtain B.G. <strong>of</strong> Rs. 5 lakh for O & M <strong>of</strong> ETP (as per matrix)