22.07.2013 Views

List of Cases to be submitted before 2nd Consent Appraisal ...

List of Cases to be submitted before 2nd Consent Appraisal ...

List of Cases to be submitted before 2nd Consent Appraisal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CAC Item No. 29<br />

Name <strong>of</strong> the industry : M/s. Bridges<strong>to</strong>ne India Private Limited<br />

(Phase-II), Plot No. A-43,<br />

MIDC Chakan, Phase-II,<br />

Tal. Khed, Dist. Pune 410 501<br />

HOD Remarks:<br />

• Applied for consent <strong>to</strong> establish<br />

• Application received at SRO- Pune-II on dtd 13/02/2012 and at HQ on 19/04/2012.<br />

• Industry has obtained consent <strong>to</strong> establish for phase I on dated 04/01/2011<br />

• Industry located @ 3.0 KM away from A-II River Indrayani. Satisfy the distance criteria.<br />

• Generation <strong>of</strong> industrial effluent will <strong>be</strong> 660 CMD from Cooling, DM s<strong>of</strong>tening & boiler<br />

blow down for which proposed <strong>to</strong> provide Effluent treatment plant<br />

• Domestic effluent generation will <strong>be</strong> 105 CMD for which proposed <strong>to</strong> provide Sewage<br />

treatment plant<br />

• Total land available for the use <strong>of</strong> treated effluent is 48366 Sq.Mts<br />

• Industry has proposed <strong>to</strong> provide dust collec<strong>to</strong>r <strong>to</strong> carbon handling/charging section.<br />

• Hazardous will sent <strong>to</strong> CHWTSDF<br />

• RO Pune has recommended the case for grant <strong>of</strong> consent <strong>to</strong> establish by stipulating<br />

stringent condition Viz BOD-20 Mg/lit SS-10 Mg/lit and continuous ambient moni<strong>to</strong>ring<br />

system and at major source emission points<br />

• We may grant the consent <strong>to</strong> Establish for Phase-II with amalgamation <strong>of</strong> <strong>Consent</strong> <strong>to</strong><br />

Establish <strong>of</strong> Phase-I with condition <strong>to</strong> achieve BOD 30 mg/Ltr., 3 CAAQMS and 50 %<br />

effluent reused in the process.<br />

• We may place the consent application <strong>be</strong>fore CAC for further consideration.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!