CAC Item No. 39<br />

Name <strong>of</strong> industry: M/s. Mazgaon Dock Ltd. ,<br />

Dock Yard Road, Mazgaon Mumbai.<br />

HOD Remarks :<br />

• Applied for renewal <strong>of</strong> <strong>Consent</strong> <strong>to</strong> operate with expansion.<br />

• Application received at SRO on 27/02/2012 and at HQ on 07/05/2012<br />

• Capital investment <strong>of</strong> the industry is 169.18 Crs.<br />

• Industry has provided ETP consisting <strong>of</strong> primary treatment followed by tertiary treatment,<br />

which is inadequate considering physical segregation <strong>of</strong> high COD & metal <strong>be</strong>aring<br />

system, which requires up gradation <strong>of</strong> existing <strong>of</strong> ETP.<br />

• Industry has provided Air Pollution Control System in form <strong>of</strong> suction hood.<br />

• JVS analysis results dated 28/06/2011, & 22/09/2011 are exceeding consent limit.<br />

• RO Mumbai, recommended renewal <strong>of</strong> consent <strong>to</strong> operate with Bank Guarantee for up<br />

gradation <strong>of</strong> ETP, STP & Air Pollution Control System.<br />

• ETP is not operated regularly.<br />

• Dry & wet Dock construction started without CRZ clearance & C <strong>to</strong> E from MPC Board.<br />

• More than 10% increase in investment made without permission i.e C.I. Increased from<br />

143.27 Crs <strong>to</strong> 169.18 Crs.<br />

• Recommended for SCN for refusal <strong>of</strong> consent application.