23.07.2013 Views

Volume III - City of Sunnyvale - State of California

Volume III - City of Sunnyvale - State of California

Volume III - City of Sunnyvale - State of California

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Anticipated Project Description Cost Funded<br />

Project Year<br />

($M) Amount<br />

Mostly complete Enhanced sidewalks and lighting – by developer<br />

Mostly complete Tasman/Fair Oaks Streetscape and Sense <strong>of</strong> Place - by <strong>City</strong> $ 2.2 $ 2.2<br />

2014/15 East Channel Trail $ 0.7<br />

Total – Tasman/Fair Oaks Bicycle and Pedestrian Circulation Plan $2.9 $2.2<br />

M<strong>of</strong>fett Park Specific Plan<br />

The M<strong>of</strong>fett Park Specific Plan was prepared to enhance economic development opportunities in the M<strong>of</strong>fett<br />

Industrial Park area. A component <strong>of</strong> the Plan examined transportation infrastructure. While most<br />

transportation capacity needs are incorporated into other plans, the Specific Plan did call out as a desirable<br />

improvement the provision <strong>of</strong> bicycle and pedestrian trails along the East and West Channels in the Park.<br />

These trails would be constructed if outside revenue is secured.<br />

Anticipated Project Description Cost Funded<br />

Project Year<br />

($M) Amount<br />

Conceptual<br />

design, 2012<br />

M<strong>of</strong>fett Park Area Bicycle and Pedestrian Trails $5.0 $0.75<br />

Total – M<strong>of</strong>fett Park Specific Plan $5.0 $0.75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!