9.<br />

American Express Desert Ridge Campus<br />

<strong>Construction</strong> Cost: $59 million<br />

Start Date: August, 2001<br />

Completion Date: December, 2002<br />

Owner: American Express<br />

General Contractor: McGough <strong>Construction</strong><br />

Architect: RSP Architects<br />

Electrical: Delta Diversified<br />

Concrete: Coreslab Structures; Sundt<br />

Mechanical: Bel-Aire Mechanical<br />

<strong>2003</strong> ARIZONA TOP PROJECTS<br />

Steel Fabrication: Ironco Enterprises<br />

Summary: Part of a 90-acre development, this project is located<br />

within the Desert Ridge master planned community in Northeast<br />

Phoenix. The construction included two new three-story office<br />

buildings, including a 178,888-sq.-ft. office building and a 191,631sq.-ft.<br />

building housing the central plant, dining and conference<br />

center, training center and credit union on the first floor, with additional<br />

offices on the second and third floors. The site will provide<br />

space for approximately 1,900 employees, with future phases<br />

planned to expand the campus.