M1A1 Abrams tanks from the 1st Armoured Regiment patrol through the Cultana Tra<strong>in</strong><strong>in</strong>g Area, <strong>South</strong> Australia, <strong>in</strong> preparation for a live-fire heavy<br />
battle group activity dur<strong>in</strong>g Exercise <strong>South</strong>ern Reach <strong>in</strong> 2007.<br />
2012<br />
• M<strong>in</strong>or Retail Facility. A new 500 Explosive<br />
Pallet Space M<strong>in</strong>or Retail Facility will be<br />
located on the exist<strong>in</strong>g tra<strong>in</strong><strong>in</strong>g area and<br />
constructed <strong>in</strong> accordance with <strong>Defence</strong><br />
standards. The works will <strong>in</strong>clude a<br />
contractor’s office located with Range<br />
Control and all eng<strong>in</strong>eer<strong>in</strong>g services to<br />
support the new facility.<br />
• Permanent Camp Accommodation. New<br />
camp accommodation would comprise<br />
accommodation blocks, kitchen and<br />
d<strong>in</strong><strong>in</strong>g facilities as well as ablutions and<br />
adm<strong>in</strong>istrative and logistic support areas.<br />
The facility will have <strong>in</strong>tegrated stores area<br />
and hard stand<strong>in</strong>g.<br />
• Urban OperationsTra<strong>in</strong><strong>in</strong>g Facility. A new<br />
urban operations tra<strong>in</strong><strong>in</strong>g facility will be<br />
provided that is capable of support<strong>in</strong>g<br />
up to a Battle-Group-sized force with<br />
both mounted and dismounted units. The<br />
proposed facility will have <strong>in</strong>strumented<br />
simulation capabilities.<br />
Progress<br />
• Field Fir<strong>in</strong>gTra<strong>in</strong><strong>in</strong>g System Range. A new<br />
tra<strong>in</strong><strong>in</strong>g range will be constructed to allow<br />
for armoured vehicle live fir<strong>in</strong>g.<br />
• Environmental Susta<strong>in</strong>ability Works. A range<br />
of works will be completed to improve<br />
fenc<strong>in</strong>g, road and water cross<strong>in</strong>g structures<br />
for controll<strong>in</strong>g storm water run- off,<br />
highway and railway passes, <strong>in</strong>frastructure<br />
service cross<strong>in</strong>gs and cattle grids.<br />
157. <strong>Defence</strong> has advised that once the expansion is<br />
approved, it would take a further 12 –18 months<br />
to complete the above works and prepare the<br />
expanded range for ongo<strong>in</strong>g use. Hence, under<br />
current plann<strong>in</strong>g, even if the expansion was<br />
completed <strong>in</strong> mid-2012, it would not be until<br />
late 2013 at the earliest that a mechanised battle<br />
group could exercise at CUTA.<br />
158. While progress appears to have been made<br />
<strong>in</strong> the later part of 2011 this may be illusory as<br />
it is occur<strong>in</strong>g after a long period of relatively<br />
little movement. There still seems to be<br />
no target dates except ‘mid-2012’ for the<br />
Army Presence <strong>in</strong> <strong>South</strong> Australia Ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the Momentum 62