RESERVOIR<br />

DAM-I<br />

Full Reservoir Level (FRL) EL.3265 m<br />

Minimum draw down level (MDDL) EL.3260 m<br />

Area under submergence at FRL 43.75 Ha<br />

Gross Storage 9.26MCM<br />

Live Storage 1.78 MCM<br />

DAM-II<br />

Full Reservoir Level (FRL) EL. 3265m<br />

Minimum draw down level (MDDL) EL.3258m<br />

Area under submergence at FRL 19.57 Ha<br />

Gross Storage 4.00 MCM<br />

Live Storage 1.04 MCM<br />

POWER INTAKES (for both the dams)<br />

Number Two<br />

Invert level EL.3250 m<br />

Size <strong>of</strong> each Gate 4.5 m ×4.5 m<br />

Trash Rack<br />

5<br />

Preliminary Feasibility Report<br />

<strong>Teesta</strong> (I) HE Project (4 x 80 MW)<br />

Steel Trash Racks with Raking Machine<br />

Design discharge +19.05 m 3 /sec in each intake<br />

DESILTING CHAMBERS<br />

(for both the dams)<br />

No., Type & size <strong>of</strong> desilting chamber 2 Nos., Dufour type chambers each 200 m<br />

long, 8 m wide, ht.12m<br />

Design Discharge in each chamber +19.05 m 3 /sec<br />

Particle size to be removed ≥ 0.2 mm (90% efficiency)