- Page 1: 50 000 MW HYDROELECTRIC INITIATIVE
- Page 5 and 6: TITLE ANNEXURES Preliminary Feasibi
- Page 7 and 8: 1.0 INTRODUCTION CHAPTER-I EXECUTIV
- Page 9 and 10: 3 Preliminary Feasibility Report Te
- Page 11 and 12: RESERVOIR DAM-I Full Reservoir Leve
- Page 13 and 14: Power House Size 141 m X 22m X40 m
- Page 15 and 16: 9 Preliminary Feasibility Report Te
- Page 17 and 18: 1.3.8 Conclusions 11 Preliminary Fe
- Page 19 and 20: 2.1 GENERAL Information 2.1.1 Intro
- Page 21 and 22: 14 Preliminary Feasibility Report T
- Page 23 and 24: 16 Preliminary Feasibility Report T
- Page 25 and 26: 18 Preliminary Feasibility Report T
- Page 27 and 28: Preliminary Feasibility Report Tees
- Page 29 and 30: 21 Preliminary Feasibility Report T
- Page 31 and 32: 3.2.4 Health & Education 23 Prelimi
- Page 33 and 34: i) Teesta Stage-I 25 Preliminary Fe
- Page 35 and 36: 27 Preliminary Feasibility Report T
- Page 37 and 38: Preliminary Feasibility Report Tees
- Page 39 and 40: 30 Preliminary Feasibility Report T
- Page 41 and 42: 32 Preliminary Feasibility Report T
- Page 43 and 44: 34 Preliminary Feasibility Report T
- Page 45 and 46: 36 Preliminary Feasibility Report T
- Page 47 and 48: Preliminary Feasibility Report Tees
- Page 49 and 50: 39 Preliminary Feasibility Report T
- Page 51 and 52: 5.2.3 Temperature And Humidity 41 P
- Page 53 and 54:
43 Preliminary Feasibility Report T
- Page 55 and 56:
5.3 WATER AVAILABILITY STUDY 5.3.1
- Page 57 and 58:
47 Preliminary Feasibility Report T
- Page 59 and 60:
• Empirical Methods 49 Preliminar
- Page 61 and 62:
51 Preliminary Feasibility Report T
- Page 63 and 64:
53 Preliminary Feasibility Report T
- Page 65 and 66:
55 Preliminary Feasibility Report T
- Page 67 and 68:
TEESTA (I) H.E PROJECT AVERAGE 10-D
- Page 69 and 70:
59 Preliminary Feasibility Report T
- Page 71 and 72:
61 Preliminary Feasibility Report T
- Page 73 and 74:
75 70 65 60 55 50 45 40 35 30 25 20
- Page 75 and 76:
Elevation(m) Area(Ha) Capacity(Ha.m
- Page 77 and 78:
Preliminary Feasibility Report Tees
- Page 79 and 80:
68 Preliminary Feasibility Report T
- Page 81 and 82:
70 Preliminary Feasibility Report T
- Page 83 and 84:
72 Preliminary Feasibility Report T
- Page 85 and 86:
74 Preliminary Feasibility Report T
- Page 87 and 88:
76 Preliminary Feasibility Report T
- Page 89 and 90:
78 Preliminary Feasibility Report T
- Page 91 and 92:
80 Preliminary Feasibility Report T
- Page 93 and 94:
6.4.4 Pressure Shaft Steel Liner 82
- Page 95 and 96:
7.1 GENERAL CHAPTER-VII POWER POTEN
- Page 97 and 98:
7.6 INSTALLED CAPACITY 85 Prelimina
- Page 99 and 100:
YEAR Table-7.2 UNRESTRICTED ENERGY
- Page 101 and 102:
PERIOD INFLOW HEA D POWER UNRES ENE
- Page 103 and 104:
Period Yearly inflow (M Cum) Annual
- Page 105 and 106:
Table-7.6 93 Preliminary Feasibilit
- Page 107 and 108:
Table-7.7 (A) 95 Preliminary Feasib
- Page 109 and 110:
Table-7.7 (C) 97 Preliminary Feasib
- Page 111 and 112:
Table-7.7 (E) 99 Preliminary Feasib
- Page 113 and 114:
Table-7.7 (G) 101 Preliminary Feasi
- Page 115 and 116:
Table-7.7 (I) 103 Preliminary Feasi
- Page 117 and 118:
Table-7.7 (K) 105 Preliminary Feasi
- Page 119 and 120:
Table-7.7 (M) 107 Preliminary Feasi
- Page 121 and 122:
Table-7.7 (O) 109 Preliminary Feasi
- Page 123 and 124:
Table-7.7 (Q) 111 Preliminary Feasi
- Page 125 and 126:
Table-7.7 (S) 113 Preliminary Feasi
- Page 127 and 128:
Table-7.7 (U) 115 Preliminary Feasi
- Page 129 and 130:
8.1 GENERAL CHAPTER-VIII POWER EVAC
- Page 131 and 132:
9.1 INTRODUCTION 9.1.1 General CHAP
- Page 133 and 134:
9.2.2 Topography 119 Preliminary Fe
- Page 135 and 136:
121 Preliminary Feasibility Report
- Page 137 and 138:
123 Preliminary Feasibility Report
- Page 139 and 140:
9.3. BIOTIC ENVIRONMENT 125 Prelimi
- Page 141 and 142:
127 Preliminary Feasibility Report
- Page 143 and 144:
129 Preliminary Feasibility Report
- Page 145:
131 Preliminary Feasibility Report
- Page 154 and 155:
CHAPTER - X INFRASTRUCTURE 10.1 EXI
- Page 156 and 157:
10.2.2 Construction of Roads & Brid
- Page 158 and 159:
10.4 CONSTRUCTION POWER 143 Prelimi
- Page 160 and 161:
CHAPTER -XI CONSTRUCTION PLANNING &
- Page 162 and 163:
146 Preliminary Feasibility Report
- Page 164 and 165:
11.2.8 Pressure Shaft: 148 Prelimin
- Page 166 and 167:
S. No. 1 Preparation of stage-I act
- Page 168 and 169:
Preliminary Feasibility Report Tees
- Page 170 and 171:
J-Power Plant Civil Works 153 Preli
- Page 172 and 173:
12.3 III-TOOLS AND PLANTS 155 Preli
- Page 174 and 175:
S. No. A- Preliminary Description o
- Page 176 and 177:
159 Preliminary Feasibility Report
- Page 178 and 179:
161 Preliminary Feasibility Report
- Page 180 and 181:
S. No. 163 Preliminary Feasibility
- Page 182 and 183:
S. No. CONCRETE DAMS (FOR DAM-I & D
- Page 184 and 185:
167 Preliminary Feasibility Report
- Page 186 and 187:
S. No. 169 Preliminary Feasibility
- Page 188 and 189:
S. No. 171 Preliminary Feasibility
- Page 190 and 191:
S. No. PRESSURE SHAFTS AND PENSTOCK
- Page 192 and 193:
S. No. SWITCHYARD Description Unit
- Page 194 and 195:
177 Preliminary Feasibility Report
- Page 196 and 197:
179 Preliminary Feasibility Report
- Page 198 and 199:
K-BUILDINGS Sl No Description Plint
- Page 200 and 201:
Nos. for 5 years. 2.2 R&M of Transm
- Page 202 and 203:
S. No. Q-Spl T&P for Infrastructure
- Page 204 and 205:
S. No. Q-Spl T&P for Infrastructure
- Page 206 and 207:
R - COMMUNUCATION 189 Preliminary F
- Page 208 and 209:
COST ESTIMATE OF E&M WORKS Generato
- Page 210 and 211:
Power Evacuation system 193 Prelimi
- Page 212 and 213:
13.1 GENERAL CHAPTER - XIII ECONOMI
- Page 214 and 215:
196 Preliminary Feasibility Report
- Page 216 and 217:
198 Preliminary Feasibility Report
- Page 218 and 219:
TEESTA-I H. E. PROJECT, SIKKIM, (4
- Page 220 and 221:
Preliminary Feasibility Report Tees
- Page 222:
ELEVATION IN METERS SCHEMATIC DIAGR
- Page 225 and 226:
27°48' 27°47' 27°46' 27°45' 500
- Page 227 and 228:
27°48' 88°33' HRT 4.0 M. Ø HORSE
- Page 229 and 230:
FRL 3265.00 MDDL 3260.00/3258.00 EL
- Page 231 and 232:
STOPLOG GATE GROOVE 1 EL ±3225.00
- Page 233 and 234:
400KV BUS1 BUS CVT-1 400kV BUS-II B
- Page 236 and 237:
1 Annexure 4.1 GEOLOGY OF THE AREA
- Page 238 and 239:
and quartzofeldspatihc leucosomes.
- Page 240 and 241:
Most of the earthquakes in this are
- Page 243 and 244:
1 Annexure-4.2 TECHNICAL REPORT ON
- Page 245 and 246:
MODIFIED MERCALLI INTENSITY SCALE (
- Page 247 and 248:
LIST OF EARTHQUAKES FROM IMD CATALO
- Page 249 and 250:
1979 10 17 1 44 22 . 2 27 . 97 87 .
- Page 251 and 252:
1992 7 30 9 7 39 . 1 29 . 90 90 . 3
- Page 253 and 254:
1998 9 12 5 8 52 . 1 27 . 85 86 . 9
- Page 255 and 256:
TITLE ANNEXURES 6.1 Reply of Genera
- Page 257 and 258:
7 The layout planning of project co
- Page 259 and 260:
Cost: 1. Cost of switchyard (400 kV
- Page 261 and 262:
REPLY ON COMMENTS OF CMDD DIRECTORA
- Page 263 and 264:
REPLY ON COMMENTS OF HCD(E&NE) DIRE
- Page 265 and 266:
the DPR stage, only the site specif
- Page 267:
I 1994 II III I 1995 II III I 1996