04.08.2013 Views

Teesta - Ministry of Power

Teesta - Ministry of Power

Teesta - Ministry of Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i) <strong>Teesta</strong> Stage-I<br />

25<br />

Preliminary Feasibility Report<br />

<strong>Teesta</strong> (I) HE Project (4 x 80 MW)<br />

It is proposed to divert the water <strong>of</strong> <strong>Teesta</strong> river d/s <strong>of</strong> its confluence with Chento chu<br />

near Shacham and water <strong>of</strong> Zema Chu d/s <strong>of</strong> confluence Lhonak chu and Poke chu by<br />

constructing diversion structures at EL ± 3230 and interconnecting tunnels discharging<br />

the Tail water at an EL ± 2775 near the place Zema. The scheme will have installed<br />

capacity <strong>of</strong> 320 MW.<br />

ii) <strong>Teesta</strong> Stage-II<br />

Under this scheme, a diversion dam <strong>of</strong> 83 m high is proposed near Bonsoi to divert the<br />

tail water <strong>of</strong> <strong>Teesta</strong> Stage-I and the power house at Chungthang. The scheme shall<br />

generate 330 MW.<br />

iii) <strong>Teesta</strong> Stage-III<br />

The schemes involve construction <strong>of</strong> <strong>Teesta</strong> River and Lachung chu near Chungthang<br />

and a <strong>Power</strong> house near Singhik. The scheme shall have the installed capacity <strong>of</strong> 1200<br />

MW.<br />

iv) <strong>Teesta</strong> Stage-IV<br />

A diversion dam is proposed just d/s <strong>of</strong> confluence <strong>of</strong> <strong>Teesta</strong> and Tolung chu near the<br />

place called Sanklan and power house near the village Dikchu. The scheme shall have<br />

installed capacity <strong>of</strong> 495 MW.<br />

v) <strong>Teesta</strong> Stage-V<br />

A diversion dam has been proposed d/s <strong>of</strong> confluence <strong>of</strong> Dikchu chu and <strong>Teesta</strong> river<br />

and a power house near the village Sherwani. The scheme shall have installed capacity<br />

<strong>of</strong> 510 MW. The project is under construction by NHPC in central sector.<br />

vi)<strong>Teesta</strong> Stage-VI<br />

<strong>Power</strong> Potential <strong>of</strong> Rangit Basin It envisages construction <strong>of</strong> a 76 m high concrete dam<br />

near Khanitar d/s <strong>of</strong> the confluence <strong>of</strong> the <strong>Teesta</strong> and Rongni chu in East Sikkim and<br />

the power house near the village Namthang/Tarkhola in South Sikkim with installed<br />

capacity <strong>of</strong> 360 MW.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!