27<br />

Preliminary Feasibility Report<br />

<strong>Teesta</strong> (I) HE Project (4 x 80 MW)<br />

4. Panan 200 MW Tolung chu North<br />

5. Lingza 160 MW Ringpi North<br />

6. Rangyong 141 MW Rangyong/ Umramchu North<br />

7. Ringpi 70 MW Ringpi North<br />

8. Rukel 33 MW Rukel/Rangyong North<br />

9. Jedang 185 MW Jhonak chu North<br />

10. <strong>Teesta</strong> Stage-I 320 MW <strong>Teesta</strong> & Zemu chu North<br />

Subsequently the Jedang scheme was replaced by Lachen scheme (210MW) and<br />

Namlum scheme by Talem scheme (75MW).<br />

OTHER SCHEMES IDENTIFIED BY CEA AND SIKKIM<br />

The CEA in the preliminary ranking studies and Sikkim in the preliminary studies<br />

identified the fallowing schemes:<br />

Sl.<br />

No.<br />

Name <strong>of</strong> Scheme Installed<br />

Capacity<br />

1. KalepHE Project 40 MW <strong>Teesta</strong><br />

2. Talem HE Scheme 65 MW <strong>Teesta</strong><br />

Name <strong>of</strong> River<br />

3. Serum HE Scheme 50 MW Lachung Chu<br />

4. Lachung HE Scheme 30 MW Lachung Chu/Sebokong Chu<br />

5. Chhota Pathing/Rolep 55 MW Rangpo Chu<br />

6. Chuzachen 13 MW Rangpo Chu<br />

7. Suntalitar HE Scheme 25 MW Rangpo Chu<br />

8. Mana 37 MW Rangit<br />

9. Gompa 46 MW Rangit