1.3.8 Conclusions<br />

11<br />

Preliminary Feasibility Report<br />

<strong>Teesta</strong> (I) HE Project (4 x 80 MW)<br />

The <strong>Teesta</strong> (I) HE project involves simple civil works and could be completed in 5<br />

years. The project would afford a design energy <strong>of</strong> 1298.12 GWh in a 90% dependable<br />

year. The cost per MW installed work out Rs.3.40 crore. The Preliminary Feasibility<br />

Report indicates that the scheme merit consideration for taking up for Survey &<br />

Investigation and preparation <strong>of</strong> DPR.