uS'kuy gkbMªksbySfDVªd<br />

ikoj dkjiksjs'ku fyñ<br />

Penstock<br />

Design Discharge : 262.50 cumec<br />

Preliminary Feasibility Report<br />

Basania HE Project 3 X 30 MW<br />

Number : One; trifurcates near <strong>Power</strong>house<br />

Type : Circular, steel lined<br />

Diameter <strong>of</strong> Main Penstock : 7.50 m<br />

Branch Penstocks : 3 nos. <strong>of</strong> 4.10 m dia. each<br />

<strong>Power</strong> House<br />

Type : Surface (at Dam Toe)<br />

Size : 75 m (L) X 25 m (W) X 55 m (H)<br />

Number <strong>of</strong> Units : 3 nos.<br />

Unit Spacing : 16.8 m<br />

Installed capacity : 90 MW (3 X 30 MW)<br />

Type <strong>of</strong> turbines : Vertical Francis<br />

Unit Discharge : 87.50 cumec<br />

Net Design Head : 38.00 m<br />

Elevation <strong>of</strong> C/L <strong>of</strong> Spiral Casing : EL 433.00 M<br />

Elevation <strong>of</strong> Bottom <strong>of</strong> Draft Tube : EL 422.00 M<br />

Average Tail Water Level : EL 437.20 M<br />

E.O.T. Crane Capacity : 200.00 Tonnes<br />

Tail Race Channel<br />

Type : Rectangular<br />

Length : 100.00 m<br />

NH/CON/229 3 01/2004