Basania Project: -<br />
C = 60<br />
A = 9472 sq.km<br />
Therefore, Q = 60(0.386x9472)<br />
= 14,694 cumec<br />
{0.925 – (1/14) log(0.386x9472)}<br />
Preliminary Feasibility Report<br />
Basania HE Project 3 X 30 MW<br />
As design flood discharge obtained by using empirical formulae is on lower side<br />
as compared with 39,368 cumec mentioned in report prepared by MPEB<br />
obtained by using design storm on 19 to 20 September 1926 having Bichhia as<br />
centre and Snyder unit hydrograph. Therefore, design flood value may be<br />
adopted as 39,368 cumec for present study. Further studies by using unit<br />
hydrograph theory and flood frequency analysis will be conducted at the time <strong>of</strong><br />
preparation <strong>of</strong> feasibility report with more databases.<br />
5.6 SEDIMENTATION<br />
The annual sediment rate per square kilometer <strong>of</strong> drainage area per year is<br />
available at G&D site Manot on River Narmada and at G&D site Mohgaon on<br />
River Burhner, which are shown in Table 5.6. These two G&D site is about 5 km<br />
and 16 km upstream <strong>of</strong> proposed dam site Basania. The sediment rate at<br />
proposed dam site Basania is worked out as average <strong>of</strong> the above mentioned<br />
two G&D sites. Thus, sediment rate is 0.070 Ham/sqkm/year as calculated in<br />
Table 5.6.<br />
5.7 Central Water Commission (CWC) after examination <strong>of</strong> this chapter, issued<br />
comments vide letter dt 26.09.03 . Copy <strong>of</strong> CWC comments and replies <strong>of</strong> NHPC<br />
and further Record note <strong>of</strong> meeting held with CWC on 17.10.03 are appended as<br />
Appendix – VI.<br />
NH/CON/229 29 01/2004