Preliminary Feasibility Report<br />
Basania HE Project 3 X 30 MW<br />
reservoir elevation-area-capacity curve at Basania H.E. project site adopted for<br />
the present study is given in Figure 5.1.<br />
5.5 DESIGN FLOOD<br />
A concrete dam is proposed to be constructed at proposed site Basania on<br />
Narmada River with gross storage capacity <strong>of</strong> 1848.94 Mcum. The gross storage<br />
capacity is more than 60 Mcum and the height <strong>of</strong> the dam is more than 30m.<br />
Therefore, As per Central Water Commission criteria and IS-11223-1985, the<br />
spillway <strong>of</strong> the proposed Basania dam has to be designed to negotiate probable<br />
maximum flood.<br />
5.5.1 PREVIOUS STUDY (MPEB-1974)<br />
Estimation <strong>of</strong> design flood discharge for the design <strong>of</strong> spillway, two methods<br />
namely Snyder synthetic unit hydrograph and empirical formulae had been used.<br />
Design storm on 19 to 20 September 1926 having Bichhia as center had been<br />
chosen from isohyetal maps <strong>of</strong> important storm in Narmada basin and used after<br />
increasing it by 20%. The result obtained from Snyder synthetic unit hydrograph<br />
using above design storm was higher as compared with other method. Thus, the<br />
design flood discharge 39,368 cumec by Snyder synthetic unit hydrograph was<br />
adopted.<br />
5.5.2 PRESENT STUDY (NHPC)<br />
Design flood estimation may be done by following approaches:<br />
• Deterministic approach<br />
• Probabilistic approach<br />
• Empirical formulae<br />
Deterministic approach<br />
Due to non-availability <strong>of</strong> observed flood hydrograph, rating curve and other<br />
relevant data, computation <strong>of</strong> design flood using deterministic approach has not<br />
been done at this stage.<br />
NH/CON/229 27 01/2004