uS'kuy gkbMªksbySfDVªd<br />

ikoj dkjiksjs'ku fyñ<br />

Preliminary Feasibility Report<br />

Basania HE Project 3 X 30 MW<br />

reservoir elevation-area-capacity curve at Basania H.E. project site adopted for<br />

the present study is given in Figure 5.1.<br />

5.5 DESIGN FLOOD<br />

A concrete dam is proposed to be constructed at proposed site Basania on<br />

Narmada River with gross storage capacity <strong>of</strong> 1848.94 Mcum. The gross storage<br />

capacity is more than 60 Mcum and the height <strong>of</strong> the dam is more than 30m.<br />

Therefore, As per Central Water Commission criteria and IS-11223-1985, the<br />

spillway <strong>of</strong> the proposed Basania dam has to be designed to negotiate probable<br />

maximum flood.<br />

5.5.1 PREVIOUS STUDY (MPEB-1974)<br />

Estimation <strong>of</strong> design flood discharge for the design <strong>of</strong> spillway, two methods<br />

namely Snyder synthetic unit hydrograph and empirical formulae had been used.<br />

Design storm on 19 to 20 September 1926 having Bichhia as center had been<br />

chosen from isohyetal maps <strong>of</strong> important storm in Narmada basin and used after<br />

increasing it by 20%. The result obtained from Snyder synthetic unit hydrograph<br />

using above design storm was higher as compared with other method. Thus, the<br />

design flood discharge 39,368 cumec by Snyder synthetic unit hydrograph was<br />

adopted.<br />

5.5.2 PRESENT STUDY (NHPC)<br />

Design flood estimation may be done by following approaches:<br />

• Deterministic approach<br />

• Probabilistic approach<br />

• Empirical formulae<br />

Deterministic approach<br />

Due to non-availability <strong>of</strong> observed flood hydrograph, rating curve and other<br />

relevant data, computation <strong>of</strong> design flood using deterministic approach has not<br />

been done at this stage.<br />

NH/CON/229 27 01/2004