uS'kuy gkbMªksbySfDVªd<br />

ikoj dkjiksjs'ku fyñ<br />

Foreword<br />

Preliminary Feasibility Report<br />

Basania HE Project 3 X 30 MW<br />

With the growing demand for power day by day, be it for industrial growth or<br />

infrastructure development, for a sustainable growth <strong>of</strong> our country, Hydropower has a<br />

very essential role to play in the days to come. All other resources for power being<br />

exhaustible, gradually depleting and at times hazardous, the hydropower <strong>of</strong>fers a<br />

wonderful alternative for which resources are inexhaustible and environment friendly.<br />

Although India has hydropower generation history <strong>of</strong> more than 100 years, it has<br />

contributed only about 25% to the total power scenario <strong>of</strong> the country tapping 26,910<br />

MW <strong>of</strong> its total identified hydropower potential <strong>of</strong> 84,044 MW, till date. Looking at the<br />

future demand, it has become imperative to tap this vast hydropower potential Hon’ble<br />

Prime Minister Shri A.B. Vajpayee has taken a giant step by launching “50,000 MW<br />

Hydroelectric Initiative” in May 2003, to accomplish the goal by XI th Plan and beyond.<br />

This will put the country on the faster track to progress.<br />

NHPC feels honoured to be associated with this venture which intends to create<br />

a shelf <strong>of</strong> Pre-feasibility Reports (<strong>PFR</strong>s) <strong>of</strong> 162 projects by September, 2004 for taking<br />

up their phase-wise implementation. NHPC is entrusted with the responsibility <strong>of</strong><br />

preparation <strong>of</strong> 43 <strong>PFR</strong>s with a likely capacity addition <strong>of</strong> 21,345 MW. The entire work <strong>of</strong><br />

preparation <strong>of</strong> <strong>PFR</strong>s is being carried out by in-house team <strong>of</strong> experts in NHPC. After<br />

scrutiny by various departments <strong>of</strong> CEA/ CWC, Basania HE Project (90 MW) prepared<br />

by us, earns the unique distinction <strong>of</strong> being first <strong>PFR</strong> to be located in the Narmada<br />

Basin.<br />

We are thankful to the CEA and <strong>Ministry</strong> <strong>of</strong> <strong>Power</strong> for reposing their faith on us<br />

and <strong>of</strong>fering this unique opportunity to be a part <strong>of</strong> this noble initiative and we promise<br />

to put up our best effort to achieve the objective as set by our Hon’ble Prime Minister.<br />

We, also, take this opportunity to <strong>of</strong>fer our sincere gratefulness to MOP, MOD and all<br />

the Departments and Organisations viz. CEA, CWC, GSI, IMD, SOI, NRSA, NVDA, ZSI<br />

and various Departments <strong>of</strong> government <strong>of</strong> Madhya Pradesh for lending their kind co-<br />

operation in completing this task.<br />

Faridabad (Yogendra Prasad)<br />

29.01.2004 Chairman & Managing Director<br />

NH/CON/229 01/2004