05.08.2013 Views

Volume II - Kildare.ie

Volume II - Kildare.ie

Volume II - Kildare.ie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

N7 Naas Road Widening & Interchanges Scheme<br />

The maximum predicted hourly, daily, 8-hr average and annual average ground level<br />

concentrations of NO2, CO, fine particulates (PM10) and VOCs produced for the design<br />

year Do-Minimum and Do-Something scenarios at each selected receptor location along<br />

the proposed development are shown in Tables 9.3.3.1. to 9.3.3.4. The receptor<br />

locations are shown on Figures 6 - 13 in <strong>Volume</strong> 3 of this EIS.<br />

MAXIMUM PREDICTED HOURLY AND ANNUAL AVERAGE GLCS (mg/m 3) OF NO2 (INCLUDING BACKGROUND<br />

OF 17mg/m 3) PRODUCED FOR THE DESIGN YEAR (2020) DO-MINIMUM AND DO-SOMETHING SCENARIOS<br />

Environmental Impact Statement 122<br />

June 2001<br />

<strong>Volume</strong> 2<br />

Receptor Do-Minimum 2020 Do-Something 2020<br />

NO2<br />

Hourly Annual Average Hourly Annual Average<br />

AV1 140 20 99 19<br />

AV2 68 19 56 18<br />

AV3 120 23 71 20<br />

AV4 156 20 129 18<br />

AV5 103 21 91 20<br />

AV6 103 22 85 20<br />

AV7 80 21 64 19<br />

AV8 88 21 71 19<br />

AV9 114 23 87 20<br />

AV10 83 21 69 19<br />

AV11 68 20 55 19<br />

AV12 67 19 51 18<br />

AV13 90 22 66 20<br />

AV14 151 23 91 20<br />

AV15 66 29 51 18<br />

AV16 185 22 117 20<br />

AV17 95 21 73 19<br />

TABLE 9.3.3.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!