05.08.2013 Views

Volume II - Kildare.ie

Volume II - Kildare.ie

Volume II - Kildare.ie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

N7 Naas Road Widening & Interchanges Scheme<br />

Most of the serious conflict points, which exist on the DM network, will be removed<br />

by the preferred scheme. This will resolve the problem of severe casualt<strong>ie</strong>s arising at<br />

the existing junctions along the N7, particularly at the uncontrolled at-grade<br />

crossings. The number of personal injury accidents per year, on the mainline links,<br />

will be reduced by at least 10% with the preferred scheme and even more scheme<br />

accident benefits will be ach<strong>ie</strong>ved at junctions, where an overall reduction of at least<br />

70% per year can be expected.<br />

A forecast of link and junction accident numbers was undertaken for opening year<br />

2005 and design year 2020, with and without the N7 scheme. Link accidents were<br />

calculated based on COBA10 rates per million vehicle kilometres and the SATURN<br />

peak hour traffic flows, factored to the level of annual average daily traffic (AADT)<br />

using 1999 ATC factors. The following COBA10 road type classifications were<br />

adopted:<br />

• Do minimum: older dual 2-lane all purpose carriageway (50mph), with accident<br />

Environmental Impact Statement 109<br />

June<br />

2001<br />

rate of 0.111 per million vehicle kilometres; and<br />

• Preferred Scheme B2: modern dual 3-lane carriageway (50mph), with hard strips,<br />

with accident rate of 0.100 per million vehicle kilometres.<br />

Junction accident numbers were estimated for the key intersections across the<br />

scheme network, based on COBA10 junction types and traffic inflow coeffic<strong>ie</strong>nts.<br />

Peak hour traffic flows were taken from the SATURN model and converted to AADT<br />

equivalents.<br />

Predicted link and junction accidents for the DM and preferred scheme B2 are shown<br />

in Table 9.1.3.3.<br />

<strong>Volume</strong> 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!