9.22 INTER-RELATIONSHIPS<br />
N7 Naas Road Widening & Interchanges Scheme<br />
The design team with the assistance of the specialist environmental consultants, each<br />
one expert on their chosen environmental f<strong>ie</strong>ld, worked together to identify the<br />
preferred scheme for the N7 Naas Road improvement and assess the impact of the<br />
preferred scheme on the environment.<br />
In order to establish a working relationship between the relevant specialist<br />
environmental consultants, the design team of the <strong>Kildare</strong> National Roads Design Office,<br />
having previously established a working relationship with each specialist environmental<br />
consultant, brought together all the specialist environmental consultants at a meeting<br />
on the 27 th March 2000.<br />
Subsequent to this meeting, the appropriate grouping of specilialist environmental<br />
consultants met to discuss issues which were relevant to that environmental grouping.<br />
Table 9.22.1 shows where the inter-relationships between the various environmental<br />
factors were taken into consideration when compiling the EIS.<br />
While all the environmental factors are inter-related to some extent, the significant<br />
interaction and inter-dependenc<strong>ie</strong>s are considered under each topic in their relevant<br />
section within the EIS, giving proposed mitigation measures where appropriate.<br />
Environmental Impact Statement 187<br />
June 2001<br />
<strong>Volume</strong> 2