Page 173 of 250<br />
APPENDIX WIRELESS PHYSICAL COLLOCATION/AT&T-13STATE<br />
PAGE 48 OF 62<br />
AT&T-13STATE/NEW CINGULAR WIRLESS <strong>PCS</strong>, LLC<br />
020106<br />
charged for the time AT&T-13STATE employees spend traveling and will be based on<br />
fifteen (15)-minute increments.<br />
18.3.16 Adjacent On-site Structure Arrangements<br />
18.3.16.1 Adjacent On-site Structure Arrangements<br />
18.3.16.1.1 If a Wireless Collocator elects to provide an Adjacent On-Site Space<br />
Collocation as described in Section 7.6.1.5 preceding, when all available<br />
space is Legitimately Exhausted inside AT&T-13STATE Eligible Structure,<br />
AT&T-13STATE will charge Planning Fees to recover the costs incurred to<br />
estimate the quotation of charges for the Wireless Collocator’s Adjacent<br />
Space Collocation arrangement request. Rates and charges are found in<br />
the Collocation Rate Summary. In addition, should the Wireless Collocator<br />
elect to have AT&T-13STATE provision an extension of DC Power Service<br />
from the Eligible Structure to the Adjacent Structure, a DC Power Panel will<br />
be required.<br />
18.3.16.2 Adjacent On-site Planning Fee<br />
18.3.16.2.1 An initial Planning Fee will apply when a Wireless Collocator is requesting<br />
any interconnection between the Wireless Collocator’s Adjacent On-site<br />
structure and AT&T-13STATE on an initial or subsequent Adjacent On-site<br />
collocation application. This fee recovers the design route of the<br />
interconnection terminations as well as the design route of the power<br />
arrangement to the Wireless Collocator’s Adjacent On-site structure.<br />
18.3.17 Adjacent Off-site Arrangement<br />
18.3.17.1 Adjacent Off-site Structure Arrangements<br />
18.3.17.1.1 If the Wireless Collocator elects to provide an Adjacent Off-site<br />
Arrangements structure as defined in Section 2. of this Appendix and as<br />
described in Section 7.6.1.6 preceding, when all available space is<br />
Legitimately Exhausted inside AT&T-13STATE Eligible Structure and<br />
Wireless Collocator's Adjacent On-site Space is not within fifty (50) feet of<br />
the Eligible Structure's outside perimeter wall, AT&T-13STATE will provide<br />
the following sub-elements to the extent technically feasible. The Adjacent<br />
Off-site Arrangement is available if the Wireless Collocator's site is located<br />
on a property that is contiguous to or within one standard city block of<br />
AT&T-13STATE’s Central Office or Eligible Structure. When the Wireless<br />
Collocator elects to collocate by Adjacent Off-site Arrangement, the<br />
Wireless Collocator shall provide both AC and DC Power required to<br />
operate such facility. Rates and charges for these sub-elements are found<br />
in the Collocation Rate Summary.<br />
18.3.17.2 Planning Fee Adjacent Off-site Arrangement<br />
18.3.17.2.1 Planning Fee will apply when a Wireless Collocator is requesting any<br />
interconnection between the Wireless Collocator’s Adjacent Off-site<br />
structure and AT&T-13STATE on an initial or subsequent Adjacent Off-site<br />
collocation application. This fee recovers the design route of the<br />
interconnection terminations to the Wireless Collocator’s Adjacent Off-site<br />
structure. Rates and charges are found in the Collocation Rate Summary.<br />
18.3.18 Conduit Space for Adjacent Off-site Arrangement<br />
18.3.18.1 Any reinforced passage or opening placed for the Wireless Collocator provided facility<br />
in, on, under/over or through the ground between AT&T-13STATE designated manhole