CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
217<br />
218<br />
219<br />
220<br />
221<br />
222<br />
223<br />
224<br />
225<br />
226<br />
227<br />
228<br />
229<br />
230<br />
231<br />
232<br />
233<br />
234<br />
235<br />
236<br />
237<br />
238<br />
239<br />
240<br />
241<br />
242<br />
243<br />
244<br />
245<br />
246<br />
247<br />
248<br />
249<br />
250<br />
251<br />
252<br />
253<br />
254<br />
255<br />
256<br />
257<br />
258<br />
259<br />
Page 193 of 250<br />
ATT-13STATE<br />
COLLOCATION RATE SUMMARY<br />
February 28, 2005<br />
13-STATE/NEW CINGULAR WIRELESS <strong>PCS</strong>, LLC<br />
EFFECTIVE DATE:<br />
A B C D E<br />
Product Type Rate Element Description USOC<br />
Illinois Current<br />
Monthly Recurring<br />
Rate<br />
Illinois Current<br />
Non-Recurring<br />
Rate (Initial)<br />
CO Manager - 1st Level Per 1/4 Hour NRFCT $0.00 $25.30<br />
Floor Space Planning - 1st Level Per 1/4 Hour NRFCU $0.00 $18.42<br />
CONSTRUCTION VISITS<br />
Project Manager - 1st Level Per 1/4 Hour NRFCV $0.00 $18.42<br />
Colloc. Ser. Mgr. - 2nd Level Per 1/4 Hour NRFCZ $0.00 $31.12<br />
AT&T-PROVISIONED FACILITIES & EQUIPMENT:<br />
CAGELESS<br />
REAL ESTATE<br />
Site Conditioning Per Frame (Standard Bay=10 sq ft) S8GCL $0.38 $111.97<br />
Safety & Security Per Frame (Standard Bay=10 sq ft) S8GCN $0.09 $27.55<br />
Floor Space Usage Per Frame (Standard Bay=10 sq ft) S8GCK $15.37 $0.00<br />
COMMON SYSTEMS<br />
Common Systems - Cageless Per Frame (Standard Bay=10 sq ft) S8GCM $0.49 $217.55<br />
PLANNING<br />
Planning - Central Office Per Frame (Standard Bay=10 sq ft) NRFCJ $0.00 $11.73<br />
Planning Per Request NRFCE $0.00 $8,289.41<br />
Planning - Subsequent Inter. Cabling Per Request NRFCF $0.00 $4,580.54<br />
Planning - Subsequent Power Cabling Per Request NRFCG $0.00 $5,701.22<br />
Planning - Subs. Inter./Power Cabling Per Request NRFCH $0.00 $7,340.92<br />
POWER PROVISIONING<br />
Power Panel:<br />
200 Amp Per Power Panel S8GC9 $0.00 $0.00<br />
Power Cable and Infrastructure:<br />
2-10 Amp Feeds Per 2-10 Amp Power Feeds C1F3D $20.83 $5,249.58<br />
2-20 Amp Feeds Per 2-20 Amp Power Feeds S8GCX $20.83 $5,249.58<br />
2-30 Amp Feeds Per 2-30 Amp Power Feeds C1F3E $20.83 $5,249.58<br />
2-40 Amp Feeds Per 2-40 Amp Power Feeds C1F3F $23.58 $6,511.67<br />
2-50 Amp Feeds Per 2-50 Amp Power Feeds S8GCY $23.58 $6,511.67<br />
2-100 Amp Feeds Per 2-100 Amp Power Feeds S8GCZ $55.38 $20,602.34<br />
Equipment Grounding:<br />
Ground Cable Placement Per Frame S8GDB $0.95 $422.84<br />
DC POWER AMPERAGE CHARGE<br />
HVAC Per 10 Amps S8GCS $20.20 $0.00<br />
Per Amp Per Amp 100 AMPS and below S8GCT $14.41 $0.00<br />
Per Amp Per Amp 200 AMPS and ABV TBD $10.64 $0.00<br />
CEV, HUT & Cabinets Per 2 inch mounting space TBD ICB ICB<br />
FIBER CABLE PLACEMENT<br />
Central Office:<br />
Fiber Cable Per Fiber Cable Sheath S8GDE $43.98 $4,403.39<br />
Entrance Conduit Per Fiber Cable Sheath S8GDD $6.80 $0.00<br />
CEV, HUT & Cabinets:<br />
Fiber Cable Placement Per Fiber Cable Sheath TBD ICB ICB<br />
Entrance Conduit Per Fiber Cable Sheath TBD ICB ICB<br />
Page 6 of 12