09.08.2013 Views

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AT&T-13STATE<br />

COLLOCATION RATE SUMMARY<br />

March 5, 2008<br />

13-STATE/NEW CINGULAR WIRELESS <strong>PCS</strong>, LLC<br />

EFFECTIVE DATE:<br />

A B C D E<br />

Illinois Current<br />

Monthly Recurring<br />

Illinois Current<br />

Non-Recurring<br />

1<br />

Product Type Rate Element Description USOC<br />

Rate<br />

Rate (Initial)<br />

79 Planning - Subsequent Power Cabling Per Request NRFCG $0.00 $5,701.22<br />

80 Planning - Subs. Inter./Power Cabling Per Request NRFCH $0.00 $7,340.92<br />

81 POWER PROVISIONING<br />

82 Power Panel:<br />

83 200 Amp Per Power Panel S8GC9 $0.00 $1,534.39<br />

84 Power Cable and Infrastructure:<br />

85 2-10 Amp Feeds Per 2-10 Amp Power Feeds C1F3A $20.83 $5,294.58<br />

86 2-20 Amp Feeds Per 2-20 Amp Power Feeds S8GCU $20.83 $5,294.58<br />

87 2-30 Amp Feeds Per 2-30 Amp Power Feeds C1F3B $20.83 $5,294.58<br />

88 2.40 Amp Feeds Per 2-40 Amp Power Feeds C1F3C $23.58 $6,511.67<br />

89 2-50 Amp Feeds Per 2-50 Amp Power Feeds S8GCV $23.58 $6,511.67<br />

90 2-100 Amp Feeds Per 2-100 Amp Power Feeds S8GCW $55.38 $20,602.34<br />

91 Equipment Grounding:<br />

92 Ground Cable Placement Per Sq. Ft. of space used by WSP S8GDA $0.95 $422.84<br />

93 DC POWER AMPERAGE CHARGE<br />

94 HVAC Per 10 Amps S8GCS $20.20 $0.00<br />

95 Per Amp Per Amp 100 AMPS and below S8GCT $14.41 $0.00<br />

96 Per Amp Per Amp 200 AMPS and ABV TBD $10.64 $0.00<br />

97 FIBER CABLE PLACEMENT<br />

98 Central Office:<br />

99 Fiber Cable Per Fiber Cable Sheath S8GDE $43.98 $4,403.39<br />

100 Entrance Conduit to Vault<br />

101 MISCELLANEOUS & OPTIONAL COST:<br />

102 MISCELLANEOUS COSTS<br />

Per Fiber Cable Sheath S8GDD $6.80 $0.00<br />

103 Timing Lead (1 pair per circuit) Per Linear Foot, Per pair S8GEK $2.49 $757.04<br />

104 Bits Timing Per two circuits S8GEJ $0.80 $0.00<br />

105 Space Availability Report Per Premise NRFCQ $0.00 $208.01<br />

106 Security Access / ID Cards<br />

107 CAGE COMMON COSTS<br />

Per Card NRFCM $0.00 $11.60<br />

108 Cage Preparation<br />

109 <strong>INTERCONNECTION</strong> COSTS:<br />

110 ILEC TO WSP CONNECTION<br />

Per Sq. Ft. of space used by WSP S8GCH $0.39 $172.23<br />

111 Voice Grade Arrangement 100 Copper Pairs S8GD4 $8.08 $3,028.65<br />

112 Voice Grade Arrangement 100 Shielded Pairs S8GD5 $8.08 $3,028.65<br />

113 DS1 Arrangement - DSX 28 DS1 S8GDP $15.25 $3,100.55<br />

114 DS3 Arrangement - DSX 1 DS3 S8GDZ $10.05 $3,254.31<br />

115 Fiber Arrangement<br />

116 WSP TO WSP CONNECTION<br />

12 Fiber Pairs (24 Fiber strands) S8GED $10.28 $4,956.82<br />

117 Cable Racking and Hole for Optical Per Cable S8FY7 $9.69 $0.00<br />

Page 204 of 250<br />

Page 3 of 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!