CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
194<br />
195<br />
196<br />
197<br />
198<br />
199<br />
200<br />
201<br />
202<br />
203<br />
204<br />
205<br />
206<br />
207<br />
208<br />
209<br />
210<br />
211<br />
212<br />
213<br />
214<br />
215<br />
216<br />
217<br />
218<br />
219<br />
220<br />
221<br />
222<br />
223<br />
224<br />
225<br />
226<br />
227<br />
228<br />
229<br />
230<br />
231<br />
AT&T-13STATE<br />
COLLOCATION RATE SUMMARY<br />
March 5, 2008<br />
13-STATE/NEW CINGULAR WIRELESS <strong>PCS</strong>, LLC<br />
EFFECTIVE DATE:<br />
A B C D E<br />
Product Type Rate Element Description USOC<br />
Illinois Current<br />
Monthly Recurring<br />
Rate<br />
Illinois Current<br />
Non-Recurring<br />
Rate (Initial)<br />
Medium Cabinet 2 Inch Mounting Space TBD ICB ICB<br />
Small Cabinet 2 Inch Mounting Space TBD ICB ICB<br />
<strong>INTERCONNECTION</strong> COSTS:<br />
ILEC TO WSP CONNECTION<br />
Voice Grade Arrangement 100 Copper Pairs (WSP provides cable) S8F3E $5.21 $1,480.31<br />
Voice Grade Arrangement 100 Shielded Pairs (WSP provides cable) S8FWV $5.21 $1,480.31<br />
DS1 Arrangement - DSX 28 DS1 (WSP provides cable) S8F2P $12.11 $1,428.28<br />
DS3 Arrangement - DSX 1 DS3 (WSP provides cable) S8F25 $6.37 $1,316.10<br />
Fiber Arrangement 12 Fiber Pairs (WSP provides cable) S8F49 $6.47 $1,400.35<br />
WSP TO WSP CONNECTION<br />
Cable Racking and Hole for Optical Per Cable S8GFE $4.46 $0.00<br />
Cable Racking and Hole for DS1 Per Cable S8GFF $4.02 $0.00<br />
Cable Racking and Hole for DS3 Per Cable S8GFG $2.76 $0.00<br />
Connection for DS1 Per 28 Circuits (WSP provides cable) S8GFL $4.02 $1,309.55<br />
Connection for DS3 Per Circuit (WSP provides cable) S8GFM $2.76 $1,309.55<br />
Connection for Optical Per Cable (WSP provides cable) S8GFN $4.46 $1,309.55<br />
PROJECT MANAGEMENT<br />
CEV, HUT & CABINET<br />
Project Coordination Per WSP Application TBD ICB ICB<br />
TIME SENSITIVE ACTIVITIES<br />
PRE-VISITS<br />
Colloc. Ser. Mgr. - 2nd Level Per 1/4 Hour NRFCR $0.00 $31.12<br />
Comm. Tech - Craft Per 1/4 Hour NRFCS $0.00 $25.30<br />
CO Manager - 1st Level Per 1/4 Hour NRFCT $0.00 $25.30<br />
Floor Space Planning - 1st Level Per 1/4 Hour NRFCU $0.00 $18.42<br />
CONSTRUCTION VISITS<br />
Project Manager - 1st Level Per 1/4 Hour NRFCV $0.00 $18.42<br />
Colloc. Ser. Mgr. - 2nd Level Per 1/4 Hour NRFCZ $0.00 $31.12<br />
AT&T-PROVISIONED FACILITIES & EQUIPMENT:<br />
CAGELESS<br />
REAL ESTATE<br />
Site Conditioning Per Frame (Standard Bay=10 sq ft) S8GCL $0.38 $111.97<br />
Safety & Security Per Frame (Standard Bay=10 sq ft) S8GCN $0.09 $27.55<br />
Floor Space Usage Per Frame (Standard Bay=10 sq ft) S8GCK $15.37 $0.00<br />
COMMON SYSTEMS<br />
Common Systems - Cageless Per Frame (Standard Bay=10 sq ft) S8GCM $0.49 $217.55<br />
PLANNING<br />
Planning - Central Office Per Frame (Standard Bay=10 sq ft) NRFCJ $0.00 $11.73<br />
Page 207 of 250<br />
Page 6 of 13