09.08.2013 Views

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37<br />

38<br />

39<br />

40<br />

41<br />

42<br />

43<br />

Page 188 of 250<br />

ATT-13STATE<br />

COLLOCATION RATE SUMMARY<br />

February 28, 2005<br />

13-STATE/NEW CINGULAR WIRELESS <strong>PCS</strong>, LLC<br />

EFFECTIVE DATE:<br />

A B C D E<br />

Product Type Rate Element Description USOC<br />

Illinois Current<br />

Monthly Recurring<br />

Rate<br />

Illinois Current<br />

Non-Recurring<br />

Rate (Initial)<br />

WSP-PROVISIONED FACILITIES & EQUIPMENT: CAGED<br />

REAL ESTATE<br />

Site Conditioning Per Sq. Ft. of space used by WSP S8FWB $0.38 $111.97<br />

Safety & Security Per Sq. Ft. of space used by WSP S8F4N $0.09 $27.55<br />

Floor Space Usage Per Sq. Ft. of space used by WSP S8F4L $15.37 $0.00<br />

COMMON SYSTEMS<br />

Common Systems - Cage Per Sq. Ft. of space used by WSP S8F4A $0.44 $194.86<br />

PLANNING<br />

Planning - Central Office Per Sq. Ft. of space used by WSP NRFCJ $0.00 $11.73<br />

Planning Per Request NRFCE $0.00 $8,289.41<br />

Planning - Subsequent Inter. Cabling Per Request NRFCF $0.00 $4,580.54<br />

Planning - Subsequent Power Cabling Per Request NRFCG $0.00 $5,701.22<br />

Planning - Subs. Inter./Power Cabling Per Request NRFCH $0.00 $7,340.92<br />

POWER PROVISIONING<br />

Power Panel:<br />

50 Amp Per Power Panel (WSP Provided) NONE $0.00 $0.00<br />

200 Amp Per Power Panel (WSP Provided) NONE $0.00 $0.00<br />

Power Cable and Infrastructure:<br />

2-10 Amp Feeds Per 2-10 Amp Power Feeds (WSP Provided) C1F31 $11.72 $1,257.17<br />

2-20 Amp Feeds Per 2-20 Amp Power Feeds (WSP Provided) S8GF1 $11.72 $1,257.17<br />

2-30 Amp Feeds Per 2-30 Amp Power Feeds (WSP Provided) C1F32 $11.72 $1,257.17<br />

2-40 Amp Feeds Per 2-40 Amp Power Feeds (WSP Provided) C1F33 $11.72 $1,257.17<br />

2-50 Amp Feeds Per 2-50 Amp Power Feeds (WSP Provided) S8GF2 $11.72 $1,257.17<br />

2-100 Amp Feeds Per 2-100 Amp Power Feeds (WSP Provided) S8GF3 $11.72 $1,257.17<br />

Equipment Grounding:<br />

Ground Cable Placement Per Sq. Ft. of space used by WSP S8FCR $0.95 $422.84<br />

DC POWER AMPERAGE CHARGE<br />

HVAC Per 10 Amps S8GCS $20.20 $0.00<br />

Per Amp Per Amp 100 AMPS and below S8GCT $14.41 $0.00<br />

Per Amp Per Amp 200 AMPS and ABV TBD $10.64 $0.00<br />

FIBER CABLE PLACEMENT<br />

Central Office:<br />

Fiber Cable Per Fiber Cable Sheath (WSP Vendor Pulls Cable) S8FQ9 $43.98 $4,403.39<br />

Entrance Conduit Per Fiber Cable Sheath S8FW5 $6.80 $0.00<br />

MISCELLANEOUS & OPTIONAL COST:<br />

MISCELLANEOUS COSTS<br />

Timing Lead (1 pair per circuit) Per Linear Foot, Per pair S8F45 $2.49 $757.04<br />

Bits Timing Per two circuits S8FQT $0.80 $0.00<br />

Space Availability Report Per Premise NRFCQ $0.00 $208.01<br />

Security Access / ID Cards Per Card NRFCM $0.00 $11.60<br />

CAGE COMMON COSTS<br />

AC Circuit Placement Per Sq. Ft. (WSP provides cage) NRL6O $0.39 $172.23<br />

Page 1 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!