CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
CELLULAR/PCS INTERCONNECTION ... - AT&T Clec Online
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
AT&T-13STATE<br />
COLLOCATION RATE SUMMARY<br />
March 5, 2008<br />
13-STATE/NEW CINGULAR WIRELESS <strong>PCS</strong>, LLC<br />
EFFECTIVE DATE:<br />
A B C D E<br />
Illinois Current<br />
Monthly Recurring<br />
Illinois Current<br />
Non-Recurring<br />
1<br />
Product Type Rate Element Description USOC<br />
Rate<br />
Rate (Initial)<br />
118 Cable Racking and Hole for DS1 Per Cable S8GFF $4.02 $0.00<br />
119 Cable Racking and Hole for DS3 Per Cable S8GFG $2.76 $0.00<br />
120 Connection for DS1 Per 28 Circuits S8GFC $8.65 $3,694.81<br />
121 Connection for DS3 Per Circuit S8GFD $8.34 $2,889.77<br />
122 Connection for Optical (Fiber)<br />
123 TIME SENSITIVE ACTIVITIES<br />
124 PRE-VISITS<br />
Per Cable S8GFB $9.69 $3,194.99<br />
125 Colloc. Ser. Mgr. - 2nd Level Per 1/4 Hour NRFCR $0.00 $31.12<br />
126 Comm. Tech - Craft Per 1/4 Hour NRFCS $0.00 $25.30<br />
127 CO Manager - 1st Level Per 1/4 Hour NRFCT $0.00 $25.30<br />
128 Floor Space Planning - 1st Level<br />
129 CONSTRUCTION VISITS<br />
Per 1/4 Hour NRFCU $0.00 $18.42<br />
130 Project Manager - 1st Level Per 1/4 Hour NRFCV $0.00 $18.42<br />
131 Colloc. Ser. Mgr. - 2nd Level<br />
132<br />
Per 1/4 Hour NRFCZ $0.00 $31.12<br />
133 WSP-PROVISIONED FACILITIES & EQUIPMENT: CAGELESS<br />
134 REAL ESTATE<br />
135 Site Conditioning Per Frame (Standard Bay=10 sq ft) S8FWC $0.38 $111.97<br />
136 Safety & Security Per Frame (Standard Bay=10 sq ft) S8FWG $0.09 $27.55<br />
137 Floor Space Usage<br />
138 COMMON SYSTEMS<br />
Per Frame (Standard Bay=10 sq ft) S8F9C $15.37 $0.00<br />
139 Common Systems - Cageless<br />
140 PLANNING<br />
Per Frame (Standard Bay=10 sq ft) S8FWE $0.49 $217.55<br />
141 Planning - Central Office Per Frame (Standard Bay=10 sq ft) NRFCJ $0.00 $11.73<br />
142 Planning Per Request NRFCE $0.00 $8,289.41<br />
143 Planning - Subsequent Inter. Cabling Per Request NRFCF $0.00 $4,580.54<br />
144 Planning - Subsequent Power Cabling Per Request NRFCG $0.00 $5,701.22<br />
145 Planning - Subs. Inter./Power Cabling<br />
146 POWER PROVISIONING<br />
147 Power Panel:<br />
Per Request NRFCH $0.00 $7,340.92<br />
148 50 Amp Per Power Panel (WSP Provided) NONE $0.00 $0.00<br />
149 200 Amp<br />
150 Power Cable and Infrastructure:<br />
Per Power Panel (WSP Provided) NONE $0.00 $0.00<br />
151 2-10 Amp Feeds Per 2-10 Amp Power Feeds (WSP Provided) C1F34 $11.72 $1,257.17<br />
152 2-20 Amp Feeds Per 2-20 Amp Power Feeds (WSP Provided) S8GF1 $11.72 $1,257.17<br />
153 2-30 Amp Feeds Per 2-30 Amp Power Feeds (WSP Provided) C1F35 $11.72 $1,257.17<br />
154 2-40 Amp Feeds Per 2-40 Amp Power Feeds (WSP Provided) C1F36 $11.72 $1,257.17<br />
Page 205 of 250<br />
Page 4 of 13