<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

<strong>Captain</strong> <strong>Andy</strong> <strong>Butterfield</strong>, <strong>USN</strong><br />

Deputy Mission Support Group Commander<br />

Joint <strong>Base</strong> McGuire-Dix-Lakehurst<br />

1


• Mission<br />

Agenda<br />

• Joint <strong>Base</strong> McGuire-Dix-Lakehurst<br />

• 2005 BRAC<br />

• Non BRAC<br />

• Mission Partners<br />

• Organization<br />

• Facility Requirements<br />

• Contracting Opportunities<br />

“WIN AS ONE”<br />

2


87 ABW Mission Statement<br />

―To provide mission-ready Warfighters to<br />

support Unified Combatant<br />

Commanders in global military<br />

operations and unrivaled installation<br />

management for America’s only triservice<br />

joint base.‖<br />

“WIN AS ONE”<br />

3


Joint <strong>Base</strong> Legislation<br />

• The <strong>Base</strong> Realignment and Closure Commission<br />

2005 legislation directed the DoD to realign 26<br />

separate installations into 12 Joint <strong>Base</strong><br />

installations<br />

• Specifically to our installation, the legislation<br />

―realigned Fort Dix NJ and Naval Engineering<br />

Station Lakehurst NJ, by relocating the<br />

installation management functions to McGuire<br />

AFB NJ, establishing Joint <strong>Base</strong> McGuire-Dix-<br />

Lakehurst NJ‖<br />

4


Joint <strong>Base</strong><br />

• Phase 1 <strong>Base</strong>s<br />

• NAS Little Creek/ Ft Story VA<br />

• Ft Myer / Henderson Hall VA<br />

• Andrews AFB / NAF Washington MD<br />

• McGuire AFB / Ft Dix / NAES Lakehurst NJ<br />

• Navy <strong>Base</strong> Guam / Andersen AB GUAM<br />

• Phase 2 <strong>Base</strong>s<br />

• Anacostia Annex / Bolling AFB DC<br />

• NS Pearl Harbor / Hickam AFB HI<br />

• Ft Lewis / McChord AFB WA<br />

• Charleston AFB / NWS Charleston SC<br />

• Elmendorf AFB / Ft Richardson AK<br />

• Lackland AFB / Randolph AFB / Ft Sam Houston TX<br />

• Langley AFB / Ft Eustis VA<br />

5


Springfield<br />

Twp<br />

Pemberton<br />

Borough<br />

Bordering Townships<br />

& Boroughs<br />

Wrightstown<br />

Borough<br />

North Hanover<br />

Township<br />

McGuire<br />

New<br />

Hanover Twp<br />

Pemberton<br />

Township<br />

Plumsted<br />

Township<br />

Fort Dix<br />

“WIN AS ONE”<br />

Manchester<br />

Township<br />

Jackson<br />

Township<br />

Lakehurst<br />

Lakehurst<br />

Borough<br />

6


BRAC Legislation<br />

• Relocate Army/Navy/Marine Units to McGuire AFB (Part 68)<br />

• Create Joint Mobilization Site (Part 144)<br />

• Establish First Tri-Service Joint <strong>Base</strong> (Part 146)<br />

“WIN AS ONE”<br />

7


BRAC Relocation – Part 68<br />

• 37 Army/Navy/Marine Acft to McGuire: 57% Increase<br />

• Personnel Increase: ~700+ Full-Time, ~1500+ Part-Time<br />

• $218M+ in DoN MILCON<br />

“WIN AS ONE”<br />

8


Non-BRAC Relocation<br />

• 23 Army Guard <strong>Air</strong>craft moving to Lakehurst<br />

• 18 UH-60 Blackhawk Helicopters<br />

• 4 UH-72A Lakota Helicopters<br />

• 1 C-12<br />

• Guard Personnel Increase<br />

• 100 Full-Time<br />

• 430 Part-Time<br />

• $50M+ in MILCON<br />

“WIN AS ONE”<br />

9


Acft<br />

63<br />

0<br />

Combined Effects<br />

JB Acft<br />

95%<br />

Increase<br />

123<br />

Supported Personnel<br />

6398<br />

Supported Personnel<br />

7630<br />

~7625<br />

~11037<br />

10


JB M-D-L<br />

• Number assigned grew 51% (+1,077):<br />

• Force Support Sq: 90% increase (+475)<br />

• Civil Engineering Sq: 85% increase (+316)<br />

• Contracting Sq: 60% increase (+28)<br />

• Security Forces Sq: 55% increase (+139)<br />

• <strong>Wing</strong> Staff: 46% increase (+40)<br />

• Logistics Readiness Sq: 19% increase (+64)<br />

• Area of Responsibility will increase more than 10-fold:<br />

from 3,600 acres to 42,000 acres<br />

• Number of facilities increased 8-times: from 502 to 3,933<br />

• Value of infrastructure grew 4-times: from $2.2B to $9.3B<br />

• Number of mission partners grew approx 2.5-times: from 30 to 80<br />

• Serviced population grew 1.5-times: from 17,000 to 41,000<br />

“WIN AS ONE”<br />

11


Urban Assault<br />

Training<br />

Contingency Operating Location<br />

(COL)<br />

Joint <strong>Base</strong><br />

The Partners – Ft Dix<br />

• FORSCOM Power Generation<br />

Platform<br />

• Primary North East Reserve<br />

Component Training Location<br />

• Army, Army Res/NG, Navy, AF<br />

Combat Training<br />

• Contingency Operating<br />

Location (COL) — ―Tiger‖<br />

• Urban Assault<br />

• Convoy Ops<br />

• Combat Supt<br />

• Detainee Ops<br />

“WIN AS ONE”<br />

12


C-17 Assault<br />

Strip<br />

Joint <strong>Base</strong><br />

The Partners – Lakehurst<br />

“WIN AS ONE”<br />

• NAVAIR <strong>Air</strong>craft<br />

Launch and<br />

Recovery (ALRE)<br />

• Design/Test<br />

Catapults, Arresting<br />

Gear, Flight Deck<br />

Landing Aids<br />

• CERDEC Flight<br />

Activity Capabilities:<br />

provides sensor<br />

integration and test<br />

support on airborne<br />

platforms<br />

13


Joint <strong>Base</strong><br />

The Partners – McGuire<br />

• Ground Combat Skills<br />

Training<br />

• Rapid <strong>Air</strong>base Opening<br />

• Rapid Global Mobility<br />

• <strong>Air</strong>lift<br />

• <strong>Air</strong> Refueling<br />

• Aerial Port Operations<br />

• Weapons School<br />

• Expeditionary Combat<br />

Support<br />

• Installation Management<br />

14


USAF<br />

Rapid Global<br />

Mobility<br />

Expeditionary<br />

Combat Supt<br />

OEF Cargo<br />

Jt <strong>Base</strong> Lead<br />

Joint <strong>Base</strong><br />

Vision<br />

America’s Premier Joint Warfighting <strong>Base</strong>!<br />

ARMY<br />

Mobilization<br />

Training<br />

Center<br />

Multi-service<br />

Training<br />

Range<br />

Training<br />

Installation Support Functions<br />

NAVY<br />

Research<br />

Test/Eval<br />

NAVAIR<br />

Tech Training<br />

Launch &<br />

Recovery<br />

Production<br />

15


Questions<br />

“WIN AS ONE”<br />

16


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Christopher Archer<br />

Deputy <strong>Base</strong> Civil Engineer<br />

Joint <strong>Base</strong> McGuire-Dix-Lakehurst<br />

17


Agenda<br />

• Joint <strong>Base</strong> Organization<br />

• Construction Projects (Recently Completed)<br />

• Construction Projects (BRAC/Ongoing)<br />

• Construction Projects (Planned)<br />

• Housing Privatization<br />

• Energy Projects<br />

• Contracting Opportunities<br />

• 87 CES POC Information<br />

“WIN AS ONE”<br />

18


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Organization Chart<br />

19


87 Civil Engineer<br />

Squadron – Maj<br />

Karen Cosgrove<br />

Joint <strong>Base</strong> Organization<br />

87 Medical Group<br />

Col Glenn Yap<br />

87 Contracting<br />

Squadron - Lt Col<br />

Dave Searle<br />

18 th <strong>Air</strong> Force<br />

Commander<br />

Lt Gen Allardice<br />

Joint <strong>Base</strong> Commander<br />

Col Gina Grosso<br />

87 Mission Support Group<br />

Col Michael Carrell<br />

87 Force Support<br />

Squadron<br />

Lt Col (sel) John<br />

Barlett<br />

87 Security Forces<br />

Squadron - Lt Col<br />

Tim Heintzelman<br />

“WIN AS ONE”<br />

Deputy Joint <strong>Base</strong><br />

Commander<br />

Col Joe Poth<br />

87 th<br />

Communications<br />

Squadron - Lt Col<br />

Rob Licciardi<br />

87 th Logistics<br />

Readiness<br />

Squadron - Lt Col<br />

Kevin Gangadeen<br />

20


CEP<br />

Programs Flight<br />

Linda Chominski<br />

87 Civil Engineer Squadron<br />

CEA<br />

Asset Mgt Flight<br />

Rich Sample<br />

Deputy <strong>Base</strong> Civil<br />

Engineer<br />

Chris Archer<br />

CEO<br />

Operations Flight<br />

Bill Garron<br />

Commander<br />

Maj Cosgrove<br />

CEF<br />

Fire Protection Flight<br />

CMSgt Cavaliero<br />

CEX<br />

Readiness &<br />

Emerg Mgt Flight<br />

Steve Robertson<br />

CER<br />

Resources Flight<br />

Bob Goss<br />

CED<br />

Explosive Ordnance<br />

Disposal<br />

Maj Stanford<br />

21


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Construction Projects<br />

22


Success<br />

• Team -- n. A group organized to work together<br />

. vt. To harness or join<br />

together to form a team.<br />

• Partner – n. A person associated with another in<br />

a venture, occupation, or challenge. n. Either of<br />

two persons dancing with each other. v. To bring<br />

together as partners.<br />

• Success – n. The gaining of something desired,<br />

planned, or attempted.<br />

“WIN AS ONE”<br />

23


Teamwork<br />

“WIN AS ONE”<br />

24


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Construction Projects<br />

(Recently Finished)<br />

25


Repair Community Center,<br />

Bldg 2705<br />

Project completed on 6 Jun 09<br />

Cost: $3.3M<br />

Project included renovation of 4 restrooms, new wall, ceiling and<br />

floor finishes, HVAC system, lighting, and fire detection/<br />

suppression systems<br />

“WIN AS ONE”<br />

26


Upgrade FTU Facility, Bldg 1928<br />

Project started: 15 Mar 08 (Design/Build Contract)<br />

Cost: $2.06M<br />

Completed: 27 Jul 09<br />

Project included new roof, brick face, exterior doors/windows,<br />

main and alternate entrances, bathrooms, auditorium, and<br />

various classrooms<br />

“WIN AS ONE”<br />

27


Repair <strong>Base</strong> Theater, Bldg 2909<br />

Project completed 1 Dec 09<br />

Cost: $4.5M<br />

Project Included new roof, brick face, auditorium chairs, floor and<br />

wall/ceiling/floor finishes, restrooms, concession area, and new<br />

mechanical/electrical systems<br />

“WIN AS ONE”<br />

28


Construct Shoulders<br />

Runway 18/36<br />

“WIN AS ONE”<br />

FY 08 P-341 D/B Contract<br />

Cost: $1.9M<br />

Completed: 31 Dec 09<br />

Scope: Project constructed<br />

25 foot wide paved shoulders;<br />

utilized crushed concrete from<br />

demo projects for stabilizing<br />

base<br />

29


Construct Taxiway Hotel<br />

FY 04 MILCON Army Reserve<br />

Cost: $2M<br />

Completed: 19 Dec 09<br />

Scope: 25 ft paved shoulders<br />

& taxiway edge lights<br />

“WIN AS ONE”<br />

30


Completed Demos<br />

TLF’s 2418 & 2419 (left top & bottom)<br />

Squad Ops Bldg 2225 (center top & bottom)<br />

Sewer Shop Bldg 1512 (right top & bottom)<br />

“WIN AS ONE”<br />

31


Completed Demos<br />

Alert Facility Bldg 1818 (top & lower Left)<br />

Storage Fac 1934 (lower center)<br />

BASH Fac Bldg 1927 (lower right and<br />

lower lower right)<br />

“WIN AS ONE”<br />

32


Completed <strong>Air</strong>field Demos<br />

Transceiver Bldg 1609 (left top & bottom)<br />

Receiver Bldg 1612 (not shown)<br />

NDI Lab Bldg 1623 (center & right)<br />

“WIN AS ONE”<br />

33


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Construction Projects<br />

(BRAC)<br />

34


P151V/P156V<br />

Navy Hangar<br />

& Flight<br />

Simulator<br />

FY 08/09<br />

P162V<br />

AIMD/ASD<br />

FY 09<br />

P150V<br />

Marine Corps<br />

Helo<br />

Hangar<br />

FY 08/09<br />

P096V/P160V<br />

Marine Corps<br />

Reserve Ctr<br />

FY 08<br />

Navy & Marine Corps<br />

BRAC Projects<br />

“WIN AS ONE”<br />

P157V<br />

Munitions<br />

FY 09<br />

P161V<br />

ArmyAviation<br />

FY 09<br />

35


Navy & Marine Corps<br />

BRAC Projects<br />

Marine Corps Reserve Center and NOSC Renovations<br />

• Award Amt. $23 Million<br />

• Harkins Builders, Inc., Marriotsville, MA<br />

• Completion Date: Sep 2010<br />

Marine Corps Helicopter Hangar & MAG 49 Hdqtrs<br />

• Award Amt. $66 Million<br />

• Boro Construction, King of Prussia, PA<br />

• Completion Date: Nov 2010<br />

“WIN AS ONE”<br />

36


Navy & Marine Corps<br />

BRAC Projects<br />

Navy Hangar<br />

• Award Amt. $48 Million<br />

• C. Pyramid Enterprises, Inc. Robbinsville, NJ<br />

• Completion Date: March 2011<br />

<strong>Air</strong>craft Intermediate Maint Div/Aviation Supply Dept<br />

• Award Amt. $20 Million<br />

• Archer-Western Contractors, Atlanta, GA<br />

• Completion Date: Feb 2011<br />

“WIN AS ONE”<br />

37


Navy & Marine Corps<br />

BRAC Projects<br />

Army Reserve Aviation Facility (Hangar Renovation)<br />

• Award Amt. $9 Million<br />

• Magnum, Inc. Warminster, PA<br />

• Completion Date: Feb 2011<br />

Munitions Storage Igloos<br />

• Award Amt. $1 Million<br />

• Intercontinental Construction Co. Inc., Passaic, NJ<br />

• Completion Date: Oct 2010<br />

“WIN AS ONE”<br />

38


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Construction Projects<br />

(In Progress)<br />

39


Cost: $40M (Includes<br />

Design to Harden<br />

Underruns)<br />

Awarded to TOLTEST<br />

ECD: 5 Jan 11<br />

Before 19 Jan 10; install<br />

fence, lighting ductwork,<br />

batch plant site work,<br />

and trailer installation.<br />

After 19 Jan 10; finish<br />

fence across taxiways,<br />

mil runway/taxiways and<br />

use the millings to create<br />

truck haul routes.<br />

Repair Runway 06/24<br />

40


Renovate Dorms 2622/2623<br />

FY08 Projects<br />

Cost: $3.1M each (Design/Build<br />

Contract)<br />

ECD 1 Sep 10<br />

Includes new wall, floor and<br />

ceiling finishes; bathroom and<br />

dayroom renovation; molded<br />

drywall replacement<br />

“WIN AS ONE”<br />

41


Awarded 3 Sep 09<br />

Cost: $4.4M; ECD: 01 Aug<br />

10<br />

Project Includes: BX floors<br />

and ceiling finishes; entire<br />

food court renovation;<br />

upgrade of both entrances<br />

Schedule: work is divided<br />

into 6 phases<br />

AAFES Renovation<br />

“WIN AS ONE”<br />

42


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Facility Requirements<br />

43


FY11-15 Installation Support<br />

MILCON Projects<br />

PRI Prev<br />

PRI<br />

PROJECT # PROJECT TITLE<br />

1 1M PTFL063000 BASE OPS / USAF COMMAND POST FACILITY<br />

2 2M PTFL063028 WARFIGHTER AND FAMILY SUPPORT CENTER<br />

3 3M PTFL023003 MUNITIONS STORAGE AREA<br />

4 1D 65596<br />

PTFL103001<br />

PHYSICAL FITNESS FACILITY<br />

5 4M PTFL9730091 ELECTRICAL DISTRIBUTION SYSTEM, PHASE II<br />

6 2L NAVY P-254 COMMERCIAL GATE SECURITY IMPROVEMENTS<br />

7 5M PTFL083006P1 AERIAL PORT COMPLEX CONSOLIDATED ADMINISTRATION<br />

FACILITY<br />

8 XD PTFL103002 FIRE STATION (DIX RANGE AREA)<br />

9 6M PTFL993010 EDUCATION & PROFESSIONAL DEVELOPMENT CENTER<br />

10 7M PTFL053001MW AIR MOBILITY WING HEADQUARTERS FACILITY<br />

44


FY09 MILCON<br />

Awarded Project<br />

Cost: $6.7M<br />

(Design/Build<br />

Contract)<br />

ECD 10 Feb 11<br />

Scope: 22,000 SF 2story<br />

facility includes<br />

weapons vault,<br />

storage,<br />

administration,<br />

lockers, holding cells,<br />

bath rooms &<br />

interrogation<br />

Security Forces Facility<br />

“WIN AS ONE”<br />

45


A/E Design Requirements<br />

REQ ORG PRI PROJECT # PROJECT TITLE<br />

JB 1 PTFL061604 UPDATE JOINT BASE GENERAL PLAN<br />

Lakehurst 2 REPAIR HANGAR #1<br />

305 MXG 3 PTFL091600 RELOCATION STUDY, DE-ICING FAC/LRS<br />

(APS CDP)<br />

305 OG 4 PTFL081602 PROFESSIONAL SVCS, BLDG ENVELOPE<br />

SURVEYS B1605 & B1828<br />

Lakehurst 5 REPAIR BLDG 5<br />

Lakehurst 6 REPAIR BLDG 88<br />

46


A/E Design Requirements<br />

Continued<br />

REQ ORG PRI PROJECT # PROJECT TITLE<br />

LAKEHURST 7 REPAIR BLDG 120<br />

87 ABW 8 PTFL091604 PROF SVCS; PROVIDE BASEWIDE WINDOW<br />

BLAST PROTECT SURVEY<br />

87 ABW 9 PTFL021037 ATFP - REPAIR WINDOWS FOR BLAST<br />

PROTECTION, MULTI FCLTY<br />

87 MSG 10 PTFL091605 PROFESSIONAL SVCS; PROVIDE OCCUPANT<br />

UTILIZATION STUDY, 3101<br />

87 MSG 11 PTFL091603 PROFESSIONAL SVCS; BASEWIDE PARKING<br />

LOT UTILIZATION STUDY<br />

47


Sustainment, Restoration and<br />

Modernization<br />

Anticipated Annual Budget<br />

Sustainment -- Dix: $20M<br />

Sustainment -- Lakehurst: $8M<br />

SRM -- McGuire: $13M<br />

TWCF -- McGuire Minor Const: $2M<br />

TWCF -- McGuire M&R: $3.5M<br />

JB-MDL Demolition Target: $1M<br />

48


Proposed FY 10 (DIX)<br />

Sustainment Priority List<br />

PRI PROJ # BLDG # TITLE<br />

1 E4000XX9P WAT59 REPAIR POTABLE WATER DISTRIBUTION MAINS<br />

2 E4000XX9P 5903 REPAIR WATER TOWER EXTERIOR<br />

3 E4000XX9P 6969 REPAIR WATER TOWER EXTERIOR<br />

4 E4000XX9P 4376 REPAIR TWWTF LOW LIFT PUMP #3<br />

5 E4000XX9P SAN60 REPAIR SANITARY SEWER SYSTEM<br />

6 E4000118P 9918 REPAIR BRINDLE LAKE DAM<br />

8 E4000068P 5523 REPAIR ROOF<br />

9 E40000X9P 5250 REPAIR ROOF<br />

10 E4002857P 8536 REPAIR ASP BUNKER ROOFS<br />

49


PRI PROJ # BLDG # TITLE<br />

13 EC055079P 5900<br />

14 EC055XX9P 5600<br />

Proposed FY 10 (DIX)<br />

Sustainment Priority List<br />

REPAIR BUILDING INTERIOR FLOORING; (BLDG 5911, 5912,<br />

5913, 5989, 5990, 5991, 5992)<br />

REPAIR BUILDING INTERIOR FLOORING; (BLDG 5602, 5603,<br />

5606, 5611, 5612)<br />

15 DR000118P 5240 REPAIR BUILDING INTERIOR (FLOORING)<br />

16 E4000968P TENAV REPAIR TENNESSEE AVENUE (ALABAMA - NASHVILLE)<br />

17 E4000918P RANRD REPAIR RANGE ROAD (TO 1ST BRIDGE PAST MID-STATE)<br />

REPAIR TEXAS AVE (WRIGHTSTOWN CIRCLE TO<br />

18 E4000XX9P TEXAV CHECKPOINT 9)<br />

20 JOC000057P FN081 CONSTRUCT BYPASS ROAD FOR 8000 AREA<br />

25 E4000XX9P WAT60 REPAIR POTABLE WATER DISTRIBUTION MAINS<br />

50


Proposed FY 10 (DIX)<br />

Restoration & Modernization<br />

PRI PROJ # BLDG # TITLE<br />

7 PN7XXXX 5501 REPAIR BARRACKS INTERIOR<br />

11 E4000XX9P 5506 REPAIR HVAC, WINDOWS, HALLWAYS<br />

12 E4000XX9P 5507 REPAIR HVAC, WINDOWS, HALLWAYS<br />

19 PN72892 5250 REPAIR UTILITY SYSTEMS & EXTERIOR (WALSON)<br />

21 PN60012 5431 REPAIR SLEEPING ROOMS FOR UPH (KITCHENETTES)<br />

22 E4000XX10P 5523 REPAIR INTERIOR/EXTERIOR<br />

23 EQ500588P 5501/5509 CONSTRUCT PARKING LOT (BLDG 5501/5509) (PRI #1)<br />

CONSTRUCT PARKING LOT (6700 MAINT AREA @ ALABAMA<br />

24 EQ500598P 6700 area & 14TH ST) (PRI #4)<br />

51


FY10 Sustainment Project<br />

List (Lakehurst)<br />

PRI PROJECT # BLDG # PROJECT TITLE<br />

1 83-07-528 1 REPLACE BOILERS NORTH LEAN<br />

2 83-09-020 1 REPAIR BATHROOMS (ADA COMPLIANCE) HANGER #1<br />

CLASSROOMS<br />

3 120 EXTERIOR REPAIRS<br />

4 123 RESURFACE GYM FLOOR<br />

5 194 HANGER 5 & 6 STRUCTURAL INVESIGATION PHASE III<br />

6 834-06-013 197 UPGRADE LIFT STATION<br />

7 834-03-022 313 ROOF AND WALL REPAIRS, COMMINUTER BUILDING<br />

8 834-05-041 362 BOILER AND CONDENSATE REPAIRS, STEAM PLANT<br />

9 834-06-011 362 REPLACE HIGH PRESSURE STEAM BOILER<br />

ECONOMIZER<br />

10 834-06-012 362 UPGRADE HIGH PRESSURE PIPING AND VALVES,<br />

STEAM PLANT<br />

52


FY10 Sustainment Project<br />

List (Lakehurst)<br />

PRI PROJECT # BLDG # PROJECT TITLE<br />

11 BH-06-510a 481 REPAIR HVAC SYSTEM, BARRACKS ROOMS<br />

12 485 MASONARY REPAIRS, FLIGHT DESK<br />

CONFERENCE ROOM<br />

13 629 REPLACE ROOF SEABEES SHOP<br />

14 834-05-049 ELECT REPLACE LEAD CABLE AND TRANSFORMER AT<br />

MANHOLE MH136<br />

15 GATE INSTALL TEMPORARY INSPECTION SHELTER,<br />

COMMERCIAL GATE<br />

16 GATE REPLACE BASE SIGN AT MAIN GATE<br />

17 GROUNDS SIDEWALK CONSTRUCTION PHASE I<br />

18 PARKING PAVE GRAVEL PARKING LOT AT BLDG 120<br />

53


FY10 SRM<br />

List (McGuire)<br />

REQ ORG PRI PROJECT # PROJECT TITLE<br />

87 MSG 20 PTFL091010 REPAIR CHW PIPING & MOLD/WATER<br />

DAMAGE, 87 CONS, B2402<br />

305 OG 21 PTFL09120302 IDC JOINT SEAL AND REPAIR<br />

CONCRETE APRON S/R<br />

87 MSG 22 PTFL071091 REPAIR GUTTERS & DOWNSPOUTS,<br />

DORMS/VQ 2600 AREA<br />

87 MSG 23 PTFL091048 INSTALL ELECTRIC AIR SOURCE HEAT<br />

PUMP, B3104, CES<br />

621 CRW NULL PTFL091053 SECURITY FORCES MOBILITY<br />

STORAGE, GRDC COMPLEX<br />

87 MSG 24 PTFL091047 REPAIR BUILDING ENVELOPE B3104,<br />

CES<br />

54


FY10 SRM<br />

List (McGuire)<br />

REQ ORG PRI PROJECT # PROJECT TITLE<br />

87 MSG 25 PTFL081086 REPLACE AST - BASE RECYCLING CENTER,<br />

B2310 R/M<br />

305 MXG NULL PTFL091027 APS COMPLEX SECURITY FENCE<br />

305 MXG 26 PTFL081068 MINOR REPAIRS TO HANGAR 1801<br />

305 OG NULL PTFL091052 INSTALL BOILER, BASE OPERATIONS, B1730<br />

305 OG NULL PTFL091051 ATFP - REPAIR PARKING BLDGS 1730, 1731 &<br />

1738<br />

87 MSG 27 PTFL091015 Install Photovoltaic Power System, Bldg. 3104<br />

87 MSG 28 PTFL091008 Repair Photovoltaic Power System, Dining Hall,<br />

Bldg. 2635<br />

87 MSG 29 PTFL091058 Replace <strong>Base</strong> Exchange HVAC<br />

55


FY10 Demolition Straddle List<br />

REQ ORG PRI PROJECT # PROJECT TITLE FY<br />

305 OG 1 PTFL091043 DEMOLISH AIRFIELD PAVEMENT<br />

NEAR NW LIMA TAXIWAY<br />

2010<br />

87 MSG 2 PTFL081085 DEMOLISH FACILITY 2618 2010<br />

87 MSG 3 PTFL081008 DEMO BE COVERED STORAGE<br />

FCLTY, B3449<br />

2010<br />

87 MSG 4 PTFL071051 DEMOLISH DORM (VAQ) B2609 2010<br />

87 MSG 5 PTFL081005 DEMO POWER CHECK PAD, FAC<br />

1925<br />

305 MXG 6 PTFL021068 DEMO BASE SUPPLY & EQUIP<br />

WAREHOUSE, B1827<br />

87 MSG 7 PTFL081006 DEMO BSE HAZARD STOR FCLTY,<br />

B3424<br />

87 MSG 8 PTFL081059 DEMOLISH DORMITORY 2611 2010<br />

2010<br />

2010<br />

2010<br />

56


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Housing Privatization<br />

57


Privatized Family Housing<br />

2,364 McGuire/Dix family housing<br />

units conveyed to United<br />

Communities Sep 2006<br />

Redevelopment Scope (over<br />

$350M): demolish 1,915; renovate<br />

449; build 1,635;<br />

Total end state - 2,084 units<br />

(78.5% new and 21.5% renovated)<br />

Jan 2010 Status: demo’d 1,709;<br />

renovated 449; built 1098 units<br />

Projected Redevelopment<br />

Completion: Feb 2011<br />

Customer Satisfaction: 88% (vs<br />

76% Avg for 24 AF PFH projects)<br />

“WIN AS ONE”<br />

Newly Constructed JNCO Housing<br />

Starlifter Housing Area<br />

58


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Energy<br />

59


McGuire:<br />

Energy Neutral by 2015?<br />

• Key <strong>Air</strong> Mobility Command<br />

airbase on East Coast<br />

• Designated one of two AF<br />

―Model Energy <strong>Base</strong>s‖<br />

• Set the ambitious goal to be ―off<br />

the grid‖ by 2015<br />

• Can we do it given:<br />

• Historically the USAF is an energy consumer, not producer?<br />

• Geographic location?<br />

• Abundance of old, inefficient legacy infrastructure?<br />

• Limited resources?<br />

60


McGuire Energy Savings Performance<br />

Contract (ESPC)<br />

DOE Super ESPC Project (Ameresco)<br />

• Awarded: 28 Dec 09; Energy Improvements: $43M<br />

• Guaranteed Cost Savings: $137M<br />

• Energy Savings: 322,000 MBTUs/YR (Reduces Energy<br />

Consumption by 42%)<br />

• Project Term: 21 YRS (Includes Construction/Maintenance)<br />

Energy Conservation Measures<br />

• ECM 1: CHP Decentralization $29M (25%)<br />

• ECM 2: Lighting Upgrades $4.3M (3%)<br />

• ECM 3: Energy Management Control System $7.7M (8%)<br />

• ECM 4: Chiller Plant Upgrades $2.5M (6%)<br />

“WIN AS ONE”<br />

61


Solar Photovoltaic (PV)<br />

• Completed Solar PV Projects at McGuire AFB <strong>Base</strong><br />

Library -- 12.25 KW<br />

Med Center -- 75 KW<br />

• Proposed Solar PV Projects<br />

• Dining Hall -- 46 KW<br />

• Fitness Center -- 70 KW<br />

• <strong>Base</strong> Theater -- 12 KW<br />

• Shoppette -- 60KW<br />

• Commissary -- 70 KW<br />

• CE Maintenance -- 46KW<br />

“WIN AS ONE”<br />

62


Solar PV<br />

Power Purchase Agreement<br />

Ground <strong>Base</strong>d 18 Acre Project: 6MW<br />

Rooftop <strong>Base</strong>d 350k SF Project: 4MW<br />

Competitive Solicitation (FEDBIZOPS)<br />

Economics: NJ Rebates + NJ RECs + 30% Fed<br />

• Tax Credit + Fed Accelerated Depreciation<br />

AF Benefits:<br />

• Reduced Electric Energy Cost<br />

• Energy Security<br />

Joint <strong>Base</strong> Initiative (Lakehurst)<br />

“WIN AS ONE”<br />

63


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

Contracting Opportunities<br />

64


Contract Opportunities<br />

Contract opportunities are ―posted‖ on the Web<br />

• Federal Business Opportunities (FedBizOpps)<br />

Includes a synopsis of the requirement<br />

Download Bid Packages (Solicitation)<br />

Synopsis of Award<br />

Sources Sought Notices<br />

www.fbo.gov<br />

“WIN AS ONE”<br />

65


Federal Business Opportunities<br />

(FEDBIZOPPS)<br />

“WIN AS ONE”<br />

66


Unique Needs For Construction<br />

Contracts >$100,000 (Miller Act)<br />

• Performance and Payment Bonds Mandatory<br />

100% of the original contract price<br />

Additional bonding required if contract price increases<br />

Contracts from $30,000 - $100,000<br />

• Two of the following payment protection required:<br />

• Payment bond; irrevocable letter of credit (ILC); tripartite<br />

escrow agreement; or certificate of deposit<br />

“WIN AS ONE”<br />

67


<strong>87th</strong> <strong>Air</strong> <strong>Base</strong> <strong>Wing</strong><br />

Joint <strong>Base</strong> McGuire – Dix - Lakehurst<br />

87 Civil Engineer Squadron POC’s<br />

68


87 th CES Points of Contact<br />

Major Karen Cosgrove (Commander) – 609-754-2642<br />

Mr Chris Archer (Deputy <strong>Base</strong> Civil Engineer) – 609-754-2768<br />

Ms Helene Talley (Secretary) – 609-754-3722<br />

Ms Linda Chominski (Programs Chief) – 609-562-2228<br />

Mr Steve Lyman (Engineering, McGuire/Dix) – 609-754-6181<br />

Mr Michael Lawlor (Engineering, Lakehurst) – 732-323-4768<br />

Mr Rich Sample (Asset Management) – 609-754-1536<br />

“WIN AS ONE”<br />

69


Questions<br />

“WIN AS ONE”<br />

70