LTC Timothy Marshall
LTC Timothy Marshall
LTC Timothy Marshall
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>LTC</strong> <strong>Timothy</strong> <strong>Marshall</strong><br />
Deputy District Commander<br />
Memphis District<br />
August 11, 2010
WYNNE A/O<br />
AR<br />
W.G. Huxtable<br />
Pumping Plant<br />
Helena<br />
New<br />
Madrid<br />
CARUTHERSVILLE<br />
A/O<br />
Osceola<br />
MO<br />
MEMPHIS<br />
Memphis District: A Vital<br />
Part of the Mississippi Valley Division<br />
IL<br />
Hickman<br />
TN<br />
Cairo<br />
KY<br />
MS<br />
BUILDING STRONG ®
Memphis District<br />
Area of responsibility: 25,000 square miles<br />
355 miles of Mississippi River channel<br />
254 miles of White River channel<br />
1,182 miles of levees<br />
38 levee/drainage districts in 6 states<br />
10 shallow-draft harbors<br />
Home for:<br />
Huxtable PS<br />
• W.G. Huxtable – Nation’s largest storm water pumping station<br />
• Dredge Hurley – Corps’ newest and most versatile dustpan dredge<br />
• M/V Mississippi – flagship and largest inland towboat<br />
• Ensley Engineer Yard – only inland Federal Marine Maintenance Center<br />
Dredge Hurley M/V Mississippi Ensley Engineer Yard<br />
BUILDING STRONG ®
$Millions<br />
360<br />
320<br />
280<br />
240<br />
200<br />
160<br />
120<br />
80<br />
40<br />
0<br />
Other = $3M<br />
$119M<br />
Civil Works Program<br />
$55M<br />
Operations &<br />
Maintenance<br />
$60M ARRA<br />
$44M<br />
Construction<br />
$122M<br />
$201M<br />
FY10 Total Program: $162M<br />
$162M<br />
$340M<br />
FY07 FY08 FY09 FY10 FY11<br />
Funds over Presidents Budget ARRA Additional Capability<br />
Presidents Budget Presidents Budget – FY2011<br />
BUILDING STRONG ®
Projects awarded: 97 of 99<br />
Funds obligated: $99.8 M<br />
Proj. completed: 49 of 99<br />
Memphis District ARRA<br />
MVM ARRA Total Program: $139.7M<br />
Program update<br />
Bayou Meto Pump Station<br />
BUILDING STRONG ®
1<br />
2<br />
Channel Improvements Revetments<br />
Island 18, MO<br />
Mhoon Bend, MS<br />
MO<br />
AR<br />
Helena<br />
New<br />
Madrid<br />
Caruthersville<br />
2<br />
1<br />
MEMPHIS<br />
TN<br />
MS<br />
IL<br />
Cairo<br />
Hickman<br />
KY<br />
TN<br />
Revetment Operations<br />
BUILDING STRONG ®
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
Channel Improvements Dikes<br />
BEND OF ISLAND 25, TN<br />
ASHPORT-GOLDUST, AR<br />
FORKED DEER, TN<br />
RANDOLPH, TN<br />
REVERIE, TN<br />
SEYPPEL, AR<br />
MO<br />
AR<br />
Helena<br />
1<br />
New<br />
Madrid<br />
Caruthersville<br />
6<br />
5<br />
2<br />
3<br />
4<br />
1<br />
MEMPHIS<br />
TN<br />
MS<br />
IL<br />
Cairo<br />
Hickman<br />
Dike Construction<br />
KY<br />
TN<br />
BUILDING STRONG ®
Mississippi River Levees (MRL)<br />
Replacing Illinois<br />
Central RR culvert<br />
Maintenance<br />
Osceola to West Memphis, AR<br />
Levee Resurfacing<br />
BUILDING STRONG ®
St. Francis Basin Maintenance<br />
Lower Buffalo Creek Ditch,<br />
Arkansas Channel Clearing<br />
Arkansas and Missouri<br />
Ditch 24, Missouri<br />
Channel Cleanout<br />
West Basin Levee, Missouri<br />
Culvert Replacement<br />
BUILDING STRONG ®
Elvis Stahr Harbor,<br />
Hickman, KY<br />
New Madrid County<br />
Harbor, MO<br />
Memphis Harbor,<br />
McKellar Lake, TN<br />
Northwest Tennessee<br />
Harbor, Tiptonville, TN<br />
Osceola Harbor, AR<br />
New Madrid City<br />
Harbor, MO<br />
Caruthersville Harbor, MO<br />
Wolf River Harbor, TN<br />
Helena Harbor,<br />
Phillips County, AR<br />
Helena Harbor, AR<br />
Harbor Maintenance in<br />
the Memphis District<br />
BUILDING STRONG ®
Pump Station<br />
Substructure<br />
Grand Prairie Region, Arkansas<br />
102 Miles of Canals<br />
290 Miles of Pipelines<br />
330 Planned On-Farm<br />
Reservoirs<br />
Inspecting pumps in storage<br />
Inlet Channel<br />
1640 cfs Pump Station<br />
164 Completed On-<br />
Farm Reservoirs<br />
BUILDING STRONG ®
107 Miles of New Canal<br />
1,750 CFS Pump Station One<br />
(Construction start Oct 2010)<br />
Riparian Buffers<br />
Bayou Meto Basin, Arkansas<br />
465 Miles of New Pipeline<br />
128 Miles of Channel Work<br />
Opportunities for Better Water<br />
Management Utilizing:<br />
Agricultural Water Supply Measures<br />
Flood Control Measures<br />
Waterfowl Management Measures<br />
Bayou Meto WMA<br />
10,000 acres of Herbaceous<br />
Wetland Complexes<br />
132 Miles of Ditch Enlargements<br />
Bayou Meto WMA Improvements<br />
1,000 CFS Little Bayou<br />
Meto Pump Station<br />
(Construction Start Oct<br />
2010)<br />
BUILDING STRONG ®
Upcoming Procurements<br />
PROJECT TITLE<br />
Fiscal Year 2011<br />
Mississippi River Harbor Dredging<br />
PROJECT<br />
LOCATION<br />
AWARD<br />
DATE<br />
ESTIMATED<br />
COST RANGE SET ASIDE CATEGORY<br />
Within<br />
Memphis<br />
District 2 nd Quarter $9.0M Unrestricted<br />
Relief Wells Linda, MO Aug 2011 $1.0M - $5.0M SBA 8(a) Program<br />
Relief Wells Tunica, MS Sep 2011 $1.0M - $5.0M Sole Source 8(a)<br />
Relief Wells Rena Lara, MS Jul 2011 $1.0M - $5.0M SBA 8(a) Program<br />
Relief Wells Luxora, AR Sep 2011 $1.0M-$5.0M Sole Source 8(a)<br />
Grand Prairie Pumping Station<br />
Superstructure<br />
Devall Bluff,<br />
AR<br />
Fourth Qtr<br />
2011 Over $10.0M Unrestricted<br />
Channel Enlargement, 10 Mile Bayou St. Francis, AR Dec 2010 $1.0M - $5.0M Sole Source 8(a)<br />
Channel Enlargement, 15 mile Bayou St. Francis, AR Nov 2010 $100K-$250K HUBZone Set Aside<br />
Revetment Repairs and Upper Bank<br />
Paving<br />
Memphis<br />
District<br />
Boundaries Jun 2011<br />
$5.0M-<br />
$10.0M Competitive 8(a)<br />
BUILDING STRONG ®
Upcoming Procurements<br />
PROJECT TITLE<br />
Big Lake Floodway West<br />
Cleanout<br />
Fiscal Year 2011<br />
PROJECT<br />
LOCATION<br />
AWARD<br />
DATE<br />
Third Qtr<br />
ESTIMATED<br />
COST RANGE SET ASIDE CATEGORY<br />
$1.0M -<br />
$5.0M Socio Economic Program<br />
Big Lake Floodway Ditch East<br />
Scour Repair Third Qtr $500K-$1.0M Socio Economic Program<br />
St. Francis West Levee<br />
Renovation<br />
St. Francis<br />
Basin, AR Third Qtr<br />
$1.0M -<br />
$5.0M Socio Economic Program<br />
Elk Chute South Levee Setback Third Qtr $1.0M-$5.0M Socio Economic Program<br />
Iron Mines Creek Cleanout Third Qtr<br />
St. Francis AR Culvert<br />
Replacement<br />
Buffalo Creek Diversion Lateral<br />
Construction Structure<br />
DD16 Levee Renovation<br />
St. Francis,<br />
AR<br />
Poinsett<br />
County, AR<br />
$250K-<br />
$500K Socio Economic Program<br />
Third<br />
Quarter $500-$1.0M Socio Economic Program<br />
Third<br />
Quarter $500-$1.0M Socio Economic Program<br />
Third<br />
Quarter<br />
$5.0M-<br />
$10.0M Socio Economic Program<br />
BUILDING STRONG ®
Upcoming Procurements<br />
PROJECT TITLE<br />
Fiscal Year 2011<br />
PROJECT<br />
LOCATION<br />
AWARD<br />
DATE<br />
ESTIMATED<br />
COST RANGE SET ASIDE CATEGORY<br />
Mud Slough Levee Renovation Third Qtr $500K-$1.0M Socio Economic Program<br />
Ditch 27 & Tributaries Cleanout Third Qtr $1.0M-$5.0M Socio Economic Program<br />
Ditch 21-B Cleanout Third Qtr $500K-$1.0M Socio Economic Program<br />
Varney River Cleanout Third Qtr $500K-$1.0M Socio Economic Program<br />
Thompson, Big Bay Deasons &<br />
Ditch 9 Cleanout Third Qtr $500K-$1.0M Socio Economic Program<br />
Cockleburr Slough Cleanout<br />
Third<br />
Quarter $500-$1.0M Socio Economic Program<br />
BUILDING STRONG ®
Our Overseas Contingency<br />
Operations volunteers<br />
Eric<br />
Strauchler<br />
BUILDING STRONG ®
Points of Contact<br />
Deputy District Engineer:<br />
<strong>LTC</strong> Tim <strong>Marshall</strong> – (901) 544-3223<br />
email: <strong>Timothy</strong>.J.<strong>Marshall</strong>@usace.army.mil<br />
Chief of Contracting:<br />
Jean Todd – (901) 544-3117<br />
email: Jean.F.Todd@usace.army.mil<br />
Office of Small Business Programs Manager:<br />
Karen Brady – (901) 544-4146<br />
email: Karen.J.Brady@usace.army.mil<br />
Memphis District Website:<br />
http://www.mvm.usace.army.mil/<br />
BUILDING STRONG ®