26 March 2013<br />

GL 121050<br />

Woolgar Hunter Consulting Engineers 100 West Regent Street, Glasgow, G2 2QD<br />

tel: 0141 332 0471 fax: 0141 332 6246 e-mail: info@woolgarhunter.com<br />

Woolgar Hunter Limited Registered in Scotland No: SC 142064<br />

Sportstock Limited<br />

Proposed Residential & Retail<br />

Development<br />

Old Govan Road<br />

Braehead, Glasgow<br />

<strong>Drainage</strong> <strong>Impact</strong> <strong>Assessment</strong>


Contents<br />

1.0 Introduction<br />

2.0 Site Location and Description<br />

3.0 Development Proposals<br />

3.1 General<br />

3.2 <strong>Drainage</strong> Requirements<br />

3.2.1 Existing Scottish Water Sewers Layout<br />

3.2.2 <strong>Drainage</strong> Strategy<br />

3.3 Foul Water <strong>Drainage</strong><br />

3.4 Surface Water <strong>Drainage</strong><br />

3.4.1 Surface Water Management Strategy<br />

3.4.2 Roof Run-off<br />

3.4.3 Car Park Run-off<br />

3.4.4 External Hard Standing<br />

4.0 Greenfield Run-off<br />

5.0 Attenuation Volumes<br />

6.0 Flood Risk <strong>Assessment</strong><br />

6.1 General<br />

6.2 Fluvial Flooding<br />

6.3 Pluvial Flooding<br />

6.4 Site Access and Egress<br />

7.0 Conclusions<br />

Appendices<br />

Appendix A – Co-ordinated Existing Services Layout


1.0 INTRODUCTION<br />

Woolgar Hunter have been appointed by Sportstock Limited to prepare a <strong>Drainage</strong><br />

<strong>Impact</strong> <strong>Assessment</strong> to support an application for Outline Planning Permission, for a<br />

proposed retail and residential development at Old Govan Road, Braehead, Renfrew.<br />

The purpose of this report is to demonstrate to <strong>Renfrewshire</strong> <strong>Council</strong>, as Planning<br />

Authority, and the relevant Planning Consultees, these being Scottish Water and the<br />

Scottish Environmental Protection Agency (SEPA) that the proposed development will<br />

not be at an unacceptable level of Flood Risk, can be drained in a sustainable<br />

manner, and will not increase the risk of flooding elsewhere.<br />

2.0 SITE LOCATION AND DESCRIPTION<br />

The proposed site is located to the south of Old Govan Road and west of Kings Inch<br />

Road, Braehead, Renfrew at OS Grid Reference NS 518669.<br />

The south and west boundaries are formed by existing industrial sites.<br />

The site is L shaped and is approximately 6.26ha, as shown in Figure 1 below.<br />

Historically the site has been occupied by factory units and hardstanding and as such<br />

is considered as brownfield. The site is level with a fall of approximately 1m from the<br />

southeast corner to the northwest corner.<br />

With regards to existing sewers serving the site there is a 525mm diameter vitrified clay<br />

combined sewer which runs along Govan Road and a 300mm diameter vitrified clay<br />

combined sewer running along the east boundary of the site and to the west of Kings<br />

Inch Road.<br />

The only other services noted to be present on site are British Telecom underground<br />

plant and telegraph poles and Scottish Power cables which served the existing<br />

buildings on the site. These are noted as Presumed out of use.<br />

Figure 1 – Site Location Plan


3.0 DEVELOPMENT PROPOSALS<br />

3.1 General<br />

The proposed development will comprise of the following;<br />

i. A Class 1 Retail Store incorporating external play areas, associated carparking<br />

and service yard.<br />

ii. The neighbouring site land will comprise of 150 residential units. The layout and<br />

formation of the dwelling units is unknown but it will likely form a mix of single<br />

dwelling and flatted accommodation, accessed by a 5.5m housing road.<br />

The approximate summary of the site areas is given in Section 3.4. It is not proposed<br />

that any major remodelling is required but there is a re-grading exercise to provide<br />

suitable platforms on which the development can take place.<br />

3.2 <strong>Drainage</strong> Requirements<br />

3.2.1 Existing Scottish Water Sewers Layout<br />

The Scottish Water sewer records indicate there are combined sewers present in Old<br />

Govan Road and off King’s Inch Road, which it is proposed we would utilise to serve<br />

the site. Refer to Appendix A for a copy of the Coordinated Existing Site Services<br />

Drawing No 12001GA-20-005.<br />

3.2.2 <strong>Drainage</strong> Strategy<br />

The strategy will ensure that flow of surface water from the development into the public<br />

system is minimised and will be limited to the pre-development 2 year greenfield runoff<br />

with all design parameters agreed with Scottish Water and <strong>Renfrewshire</strong> <strong>Council</strong>.<br />

3.3 Foul Water <strong>Drainage</strong><br />

Foul water generated from the development will be directed into the existing Scottish<br />

Water combined sewers which as noted above are present in Old Govan Road and off<br />

King’s Inch Road. There will be 1 connection, for the retail unit development site with<br />

likely 2 connections for the residential site.<br />

Reference was made to the Scottish Water Asset Capacity Search facility. This<br />

indicates that there is current capacity within the existing sewer network. From this, it is<br />

not expected that there should be any foul drainage constraint, as the foul discharge<br />

from the development will remain relatively small.<br />

A <strong>Drainage</strong> <strong>Impact</strong> <strong>Assessment</strong> form has been submitted to Scottish Water for<br />

confirmation of this position.<br />

Foul flow rates from the proposed development have been calculated using the<br />

Probability Method to Annex B of BS EN 752 : 2008 as shown in Figure 2 below for the<br />

retail unit. The foul flow rates from the proposed residential units have been based on<br />

the guidance provided in Sewers for Scotland, 2nd Edition, Clause 2.20. The design<br />

flows for foul gravity sewers should be 4000 litres per unit per 24 hours.


Anticipated Foul <strong>Drainage</strong> Flows<br />

The following is an assessment of the foul flow rates generated from the respective<br />

parts of the development.<br />

Retail Development Flow Rates<br />

The total Discharge Units from the anticipated appliances within the unit ∑DU = 16.7<br />

Applying a Frequency Factor (constant) for frequent use kDU = 0.7<br />

Flow Rate Q = kDU [∑DU] 0.5<br />

Q = 0.7 [16.7] 0.5<br />

Q = 2.9 l/s<br />

Estimated Peak Flow Rate for Building = 2.9 litres per second.<br />

Residential Development Flow Rates<br />

The total Flow Rate Q = 4000 litres/unit x 150 dwelling units.<br />

Q = 600000 litres per day. Equating this to a rate per second.<br />

Q = 6.9 l/s<br />

Estimated Peak Flow Rate for Residential Portion of the Site = 6.9 litres per second.<br />

Combined Total Site Development Flow Rates<br />

Combining the total foul flow rates generated from the site, the Estimated Peak Flow<br />

Rate = 9.8 litres per second.<br />

3.4 Surface Water <strong>Drainage</strong><br />

3.4.1 Surface Water Management Strategy<br />

The site is brownfield and is currently occupied by buildings, hardstanding and<br />

landscape areas. As such, surface water falling onto the site will dissipate by a<br />

combination of overland flow, infiltration, evaporation and evapotranspiration.<br />

Surface water generated from the development will be controlled in accordance with<br />

the “Sustainable Urban <strong>Drainage</strong> Systems, Design Manual for Scotland and Northern<br />

Ireland, issued by CIRIA”, in the following manner;<br />

Surface water from the proposed development will be attenuated to a runoff<br />

flow equivalent to the 2 year Greenfield, for up to a 1:30 year storm event with all<br />

storage below ground. The 1:200 year storm plus climate change will be assessed<br />

and if practicable stored below ground. If not the risk of flooding of the building<br />

or impact on the safe access and egress from the building will be assessed in<br />

accordance with <strong>Renfrewshire</strong> <strong>Council</strong>s <strong>Drainage</strong> <strong>Assessment</strong> – Notes for<br />

Guidance document.


Surface water runoff from the roof areas will undergo one level of treatment<br />

Surface water runoff from the car parks will undergo two levels of treatment.<br />

Surface water runoff from the service yard will undergo two levels of treatment.<br />

Surface water runoff from the access roads will undergo two levels of treatment.<br />

This will be achieved as follows:<br />

3.4.2 Retail Roof Runoff (Area 3537m 2 )<br />

Surface water generated from the building roofs will be directed into filter trenches<br />

located in the landscape areas, this will provide the necessary treatment and<br />

attenuation, prior to discharge into the combined sewer.<br />

3.4.3 Residential Roof Runoff (Area 19091m 2 )<br />

Surface water generated from the building roofs will be directed into the porous<br />

make ups located beneath the car park running surfaces, which will provide the<br />

necessary treatment and attenuation, prior to discharge into the combined sewer.<br />

As the formation of the development is unknown at this stage, it is suggested that<br />

70% of the site area is taken as contributory to the run off generated. This will be<br />

divided into 50% as roof run off and 20% as roads and car parking.<br />

3.4.4 Retail Car Park Runoff (Area 10355m 2 )<br />

Surface water generated from the carpark and access road will be subjected to two<br />

levels of treatment.<br />

The surface of the car parks will comprise permeable paviours/porous asphalt with<br />

a stone reservoir below, this will provide the two levels of treatment.<br />

The water will then be discharged via an attenuation manhole to the combined sewer.<br />

3.4.5 Residential Car Park and Access Road Runoff (Area 7636m 2 )<br />

Surface water generated from the carpark and access road will serving the residential<br />

development will be subjected to two levels of treatment.<br />

The surface of the car parks will comprise permeable paviours/porous asphalt with<br />

a stone reservoir below, this will provide the necessary two levels of treatment.<br />

The access road will comprise of a perimeter swale with a wrapped stone filter<br />

trench below, which will provide the necessary two levels of treatment.<br />

The combined water generated will then be discharged via an attenuation manhole<br />

to the combined sewer.


3.4.4 Retail External Hardstandings (Area 10608m 2 )<br />

The surface water from these areas will be treated by a combination of bioretention<br />

features and filter trenches before discharging to the combined sewer. This will provide<br />

the required two levels of treatment.<br />

The proposed SUDS measures will accommodate storm events up to a 200 year return<br />

period including 20% increase for climate change.<br />

Due to the site topography, being relatively flat, will be retaining the 1 in 200 year storm<br />

within the site, prior to discharge at a controlled rate to the combined sewers.<br />

4.0 Greenfield Runoff<br />

An estimation of the Greenfield Run - off rate has been carried out using Micro<br />

<strong>Drainage</strong> QBAR software as indicated in Figure 3a & 3B below.<br />

The discharge rate in each case, is to be agreed by Scottish Water and <strong>Renfrewshire</strong><br />

<strong>Council</strong>.<br />

Figure 3a – Retail Greenfield Run – off.<br />

Based on a total site area of 24493m 2 this has been calculated at 20.2l/s, equivalent to<br />

8.2l/s/Ha.


Fig 3b – Residential Greenfield Run – off<br />

Based on a total site area of 38182m 2 this has been calculated at 31.5l/s, equivalent to<br />

8.2l/s/Ha.<br />

This provides a combined greenfield run – off of 51.7l/s for the full development site.


5.0 Attenuation Volumes<br />

We have carried out an assessment of the attenuation volume required for various return<br />

periods and storm durations and these are shown in Figure 4a and 4b below. This has<br />

been divided between the retail and residential portions of the site.<br />

Figure 4a – Retail Attenuation Calculation<br />

This revealed for a 1:200 year storm the critical storm duration is 540minutes and requires<br />

attenuation of 1229m 3 .


Figure 4b – Residential Attenuation Calculation<br />

This revealed for a 1:200 year storm the critical storm duration is 540minutes and requires<br />

attenuation of 1439m 3 .


6.0 Flood Risk <strong>Assessment</strong><br />

6.1 General<br />

An extract from the SEPA Flood Map is shown in Figure 5 below. The map indicates that<br />

the site is not at risk from flooding under a 1;200 year (0.5% AER) storm event.<br />

Figure 5<br />

Notwithstanding this we have also considered the following;<br />

Risks to the development and risks arising from the development.<br />

Considerations of the vulnerability of the end users and arrangements for the safe<br />

access and egress to/from the development.<br />

The primary risks of flooding to the development are from fluvial and pluvial flooding,<br />

which are assessed below.<br />

6.2 Fluvial Flooding<br />

The only possible source of flooding in the vicinity of the site is from the River Clyde. The<br />

development is relatively flat with an average ground level of +7.2m AOD, which is<br />

some 2.2m above the land adjacent to the River Clyde level.<br />

We therefore consider that there is adequate distance from the River Clyde and<br />

freeboard that fluvial flooding does not pose a threat to the development.


6.3 Pluvial Flooding<br />

There are two instances when pluvial flooding may be a problem;<br />

During the initial soil strip, when rainwater has a reduced ability to percolate<br />

through the exposed sub soil. At present the site is covered with roof or<br />

hardstanding, ie impermeable and as such we do not consider this condition to<br />

be a concern.<br />

Upon completion of the development when the surface water can drain across<br />

impermeable surfaces without being contained on site. The surface water system<br />

will be designed to store all rainwater on site.<br />

6.4 Site Access and Egress<br />

As the site will be designed for a 1:200 year plus climate change storm, stored below<br />

ground, and fluvial flooding is not considered to be a risk, there is no risk to safe access<br />

and egress.<br />

7.0 Conclusions<br />

The proposed drainage design satisfies all elements of the current guidelines with<br />

regards to impacting on the existing sewers network and surrounding areas.<br />

Prepared By ………………………………. Checked By ……………………………………….<br />

Jim sharp Sandy Porter<br />

BSc (Hons) CEng MICE BSc CEng MICE


Appendix A<br />

Co-ordinated Existing Services Layout


Co-ordinated Services Layout


UK Offices<br />

Glasgow<br />

100 West Regent Street, Glasgow, G2 2QD<br />

Tel: 0141 332 0471 Fax: 0141 332 6246<br />

Manchester<br />

Portland Tower, 53 Portland Street, Manchester, M1 3LF<br />

Tel: 0161 228 3889 Fax: 0161 238 4967

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!